Filter interviews by
I applied via Walk-in and was interviewed in Nov 2022. There were 4 interview rounds.
Quality is the degree to which a product or service meets or exceeds customer expectations.
Quality is about meeting customer requirements and delivering value.
It involves consistently producing products or services that are reliable, efficient, and free from defects.
Quality is achieved through effective planning, control, and continuous improvement.
It encompasses various aspects such as performance, durability, safety,...
The 7 types of QC tools are essential for quality engineers to identify and solve problems in manufacturing processes.
Check sheets: Used to collect and organize data for analysis.
Pareto charts: Helps prioritize problems by identifying the most significant factors.
Cause-and-effect diagrams: Visualizes the potential causes of a problem.
Histograms: Displays the distribution of data to identify patterns.
Scatter diagrams: S...
IATF stands for International Automotive Task Force.
IATF is a group of automotive manufacturers and their respective trade associations.
It was formed to provide improved quality products to automotive customers worldwide.
IATF has developed a common set of quality management system requirements for automotive suppliers.
The current standard is IATF 16949:2016, which is based on ISO 9001:2015 with additional automotive in
The IATF CORE tool is the Control Plan.
The Control Plan is a document that outlines the steps and measures to be taken to ensure product quality.
It includes information on the process flow, control methods, inspection requirements, and reaction plans.
The Control Plan is an essential tool in the automotive industry to meet the requirements of the IATF 16949 standard.
It helps in identifying potential risks, implementing ...
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 17 Feb 2020
I applied via Recruitment Consultant and was interviewed before Feb 2019. There were 3 interview rounds.
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
There are 5 levels in PPAP (Production Part Approval Process).
PPAP has 5 levels: Level 1, Level 2, Level 3, Level 4, and Level 5.
Each level represents a different stage of the PPAP process.
Level 1 includes documentation submission, while Level 5 involves customer approval.
The higher the level, the more comprehensive the PPAP requirements become.
PPAP is used to ensure that suppliers meet the quality standards of their c
Cp measures the capability of a process to meet specifications, while Cpk measures the capability of a process to meet specifications considering centering.
Cp is a short-term capability index, while Cpk is a long-term capability index.
Cp considers only the spread of the process, while Cpk considers both the spread and the centering of the process.
Cp is calculated using the formula Cp = (USL - LSL) / (6 * standard devia...
CAPA stands for Corrective and Preventive Action. It is a systematic approach to identify, investigate, and resolve quality issues.
CAPA is a key component of quality management systems.
It involves identifying the root cause of a problem, implementing corrective actions to address the immediate issue, and preventive actions to prevent recurrence.
CAPA processes typically include steps like problem identification, investi...
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Siemens plc models include S7-1200, S7-1500, S7-300, S7-400, and LOGO!
S7-1200
S7-1500
S7-300
S7-400
LOGO!
SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are operating efficiently and within specifications.
SPC involves collecting and analyzing data to identify variations in a process
It helps in detecting and correcting issues before they result in defects
Common tools used in SPC include control charts, histograms, and Pareto charts
To configure a dp dp coupler, set the parameters for communication protocol, baud rate, address, and data format.
Set the communication protocol to match the devices being connected.
Configure the baud rate to ensure proper data transmission speed.
Assign a unique address to the dp dp coupler for identification.
Choose the appropriate data format for the connected devices.
Test the configuration to ensure proper communicati
I applied via Job Portal
posted on 15 Oct 2022
I applied via Naukri.com and was interviewed in Sep 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
Junior Engineer
21
salaries
| ₹2 L/yr - ₹4 L/yr |
Quality Engineer
19
salaries
| ₹1.4 L/yr - ₹3.8 L/yr |
Production Engineer
16
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Assistant Engineer
15
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Mechanical Engineer
12
salaries
| ₹1.2 L/yr - ₹3.5 L/yr |
Yazaki
Delphi TVS
JK Tyres
Lucas-TVS