i
AtkinsRealis
Filter interviews by
I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.
If you given any disease i can tell the code , and i will check in the human anotomy and physiology
* If their observed the disease and i
will check which code as correct ,
* First i observed Exclude one or 2
* their have other specified or not
* thease i obserd that condition
I applied via Walk-in and was interviewed before Nov 2022. There were 3 interview rounds.
Basic Revit Test but many theory based questions were also asked
I applied via Approached by Company and was interviewed before Dec 2023. There were 2 interview rounds.
A treatment plant is a facility where wastewater is treated to remove contaminants before being discharged back into the environment.
Treatment plants use a combination of physical, chemical, and biological processes to remove pollutants from wastewater.
Common processes in treatment plants include screening, sedimentation, filtration, and disinfection.
Examples of treatment plants include sewage treatment plants, water t...
I applied via Company Website and was interviewed in Dec 2022. There were 2 interview rounds.
The first step of regarding safety is to identify potential hazards.
Conduct a risk assessment to identify potential hazards
Implement measures to eliminate or control the hazards
Train employees on safety procedures and protocols
Regularly review and update safety policies and procedures
Provide personal protective equipment (PPE) when necessary
AtkinsRealis interview questions for popular designations
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
Get interview-ready with Top AtkinsRealis Interview Questions
I applied via LinkedIn and was interviewed in Nov 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Oct 2022. There were 2 interview rounds.
A thrust block is a concrete block used to resist the thrust of a pipeline or conduit.
It is used to prevent the movement of a pipeline or conduit caused by internal pressure.
It is typically made of concrete and is designed to withstand the force of the fluid or gas flowing through the pipeline.
Thrust blocks are commonly used in water and sewage systems, as well as in oil and gas pipelines.
They are usually installed at ...
Pipe bedding details are designed to provide support and stability to the pipe.
Determine the type of soil and its load-bearing capacity
Select the appropriate bedding material, such as crushed stone or sand
Ensure proper compaction of the bedding material
Design the trench width and depth to accommodate the pipe and bedding
Consider factors such as traffic loads and environmental conditions
Follow local codes and regulation...
A non-restrained joint is a joint that is free to move in all directions.
A non-restrained joint allows for movement in all directions without any external force or constraint.
Examples include ball and socket joints in the human body and expansion joints in buildings.
Non-restrained joints require careful design and consideration to ensure proper function and stability.
In engineering, non-restrained joints are often used...
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There was 1 interview round.
I was interviewed in Mar 2023.
Basic standards of an architect from NBC
The National Building Code (NBC) sets the basic standards for architects
Architects must comply with the NBC's regulations on building design, construction, and safety
NBC also mandates the use of sustainable and energy-efficient materials and practices
Architects must obtain necessary permits and approvals from local authorities before starting any construction work
Tool Test For Revit software
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
Yes, I have worked on international projects and can provide information on waterproofing techniques, false ceiling layers, and mechanical floor heights in high rise buildings.
I have worked on international projects in various countries, including designing waterproofing systems for buildings in coastal areas prone to heavy rainfall.
The 5 levels of waterproofing techniques typically include surface preparation, applica...
Top trending discussions
The duration of AtkinsRealis interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 59 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Assistant Engineer
223
salaries
| ₹0 L/yr - ₹0 L/yr |
Graduate Engineer
196
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Analyst
103
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
98
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Lead Designer
97
salaries
| ₹0 L/yr - ₹0 L/yr |
Jacobs Engineering Group
Bechtel
Fluor Corporation
AECOM