Premium Employer

i

This company page is being actively managed by AtkinsRealis Team. If you also belong to the team, you can get access from here

AtkinsRealis Verified Tick

Compare button icon Compare button icon Compare
4.0

based on 1.1k Reviews

Filter interviews by

AtkinsRealis Project Management Trainee Interview Questions and Answers

Updated 8 Oct 2021

AtkinsRealis Project Management Trainee Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Types of Contracts
  • Ans. 

    Types of contracts include fixed-price, cost-reimbursable, time and material, and incentive contracts.

    • Fixed-price contracts have a set price for the project or deliverables.

    • Cost-reimbursable contracts reimburse the contractor for all costs incurred plus a fee.

    • Time and material contracts pay for the contractor's time and materials used.

    • Incentive contracts offer rewards for meeting or exceeding performance targets.

    • Other ...

  • Answered by AI
  • Q2. Difference between planning and scheduling
  • Ans. 

    Planning is deciding what to do and scheduling is deciding when to do it.

    • Planning involves setting goals, defining objectives, and determining the resources needed to achieve them.

    • Scheduling involves breaking down the plan into smaller tasks, assigning resources, and setting deadlines.

    • Planning is more strategic and long-term, while scheduling is more tactical and short-term.

    • Planning is about creating a roadmap, while s...

  • Answered by AI
  • Q3. Time value of money
  • Ans. 

    Time value of money refers to the concept that money available at the present time is worth more than the same amount in the future.

    • The value of money decreases over time due to inflation

    • Investing money can increase its value over time

    • Discounted cash flow analysis is used to calculate the present value of future cash flows

    • Time value of money is important in project management for budgeting and financial planning

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare your presentation and practice it. A couple of times before delivering.
Be thorough with your resume most of the questions were based on what was present in my resume.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Why do you want to work for L&T
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Introduce yourself? This This question is just make you comfortable to boost your confidence because you surely know the answer.?
  • Ans. Prepare your introduction and speak. Ensure that your speak naturally - touch upon your education, family, academic & experience. Keep some thread which will generate another related questions & if successful then gobwith flow
  • Answered Anonymously
  • Q2. Why do you want to change?
  • Ans. Multiple answers.. Stagnant, better remuneration, better position, change of location... and many.. see what suits you. Try to avoid talking against any current & previous employer
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare impressive CV, you can include some graphics or pics of your work from earlier employment such as pic with team .. which indirectly explain team size you handled, site pics containing yourself.. explains your site visits. Some KOMs showing formal approach... but ensure, you do not break the confidential requirements...!
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via campus placement at National Institute of Technology (NIT), Kurukshetra and was interviewed before May 2023. There was 1 interview round.

Round 1 - Case Study 

It is the final round with the Saint gobain glass CEO where you are provided with a research paper and you are supposed to prepare it in one day and present it in front of CEO, nominal difficulty level, from my experience they were trying to gauge presence of mind in candidates.

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Because I am EX employees with this company.
  • Q2. When you are joining this project
  • Q3. I am ready to join Immediately.
Round 3 - Technical 

(1 Question)

  • Q1. Technical Questions.
Round 4 - es 

(2 Questions)

  • Q1. Yes, HR i asked me salary, but i Received the offer letter from GPS /Saipem and i will accept her offer kettrer .. In wall sing deportment they romped the document for 06 months unfortunately will DeMeo me...
  • Q2. They are always checking with my look ahead scheduler

Interview Preparation Tips

Interview preparation tips for other job seekers - I am EX Employer of the SAIPEM Thats why did not take an Interview.,
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Indian Institute of Technology (IIT), Mumbai and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Which pillar are good
  • Q2. What is uniform loading
  • Ans. 

    Uniform loading refers to distributing a load evenly across a surface or structure.

    • Uniform loading helps prevent stress concentrations and ensures stability.

    • It is commonly used in engineering and construction to ensure the safety and integrity of structures.

    • Examples include evenly distributed weight on a shelf or uniform pressure on a bridge.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil core knowledge of 3rd year is a must

Interview Preparation Tips

Round: HR Interview
Experience: up to last round there was elimination.good presentation skill, understanding of project, Knowledge in Material Characterization,

College Name: IIT MADRAS
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Group Discussion 

Past Projects details to explain,

Round 3 - Technical 

(5 Questions)

  • Q1. Past Projects Technical
  • Q2. What type of Piling Mech your using previous project
  • Ans. 

    We used bored pile foundation method in our previous project.

    • Bored pile foundation method was used for piling in the previous project.

    • The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.

    • Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.

  • Answered by AI
  • Q3. What is the pile rig tark of Rig Mech
  • Ans. 

    The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.

    • Operating pile driving equipment efficiently

    • Maintaining and repairing equipment as needed

    • Ensuring safety protocols are followed during pile driving operations

  • Answered by AI
  • Q4. What is density of polymer,
  • Ans. 

    The density of a polymer refers to its mass per unit volume.

    • Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).

    • The density of a polymer can vary depending on factors such as its chemical composition and structure.

    • For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.

    • Higher density polymers tend to be more rigid and have higher melting points.

  • Answered by AI
  • Q5. Viscosity of polymer before starting the pile boring, what is the pH value should be before boring, water test details,
  • Ans. 

    The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.

    • Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.

    • The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.

    • Water test details should include para...

  • Answered by AI

Skills evaluated in this interview

I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Prepare your self as per your CV.
  • Q2. They required deep answer of every questions.
  • Q3. Time Cycle plan also discussed for every activities done in last projects.
Round 3 - HR 

(3 Questions)

  • Q1. Salary, reason of leaving, location
  • Q2. Documents Verification
  • Q3. Medical tests done at your nearest location by company expense.

Interview Preparation Tips

Topics to prepare for L&T Construction Construction Management interview:
  • As per CV
  • Work done in last projects
Interview preparation tips for other job seekers - Keep your self ready & up to date in technical as well managerial skills also, be honest & dedicated in your every project, prepare CV as per your knowledge & interest.

Interview Questionnaire 

3 Questions

  • Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
  • Ans. 

    Technical and administrative issues during construction execution and their solutions

    • Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders

    • Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting

    • Effective project...

  • Answered by AI
  • Q2. How much of quantity of piping done at ur location and the total duration for the completion of the same.
  • Ans. 

    The quantity of piping done at our location and the total duration for completion varied depending on the project.

    • The quantity of piping done at our location ranged from project to project.

    • The total duration for completion also varied based on the size and complexity of the project.

    • For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.

    • In another project...

  • Answered by AI
  • Q3. Types of valves, hydrotesting pressure in pipe lines, Units of pressure and their conversions
  • Ans. 

    Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.

    • Types of valves include gate, globe, ball, butterfly, and check valves.

    • Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.

    • Units of pressure include psi, bar, kPa, and MPa.

    • Conversions between units of pressure can be done using conversion factors.

    • For example, 1

  • Answered by AI

AtkinsRealis Interview FAQs

What are the top questions asked in AtkinsRealis Project Management Trainee interview?

Some of the top questions asked at the AtkinsRealis Project Management Trainee interview -

  1. Difference between planning and schedul...read more
  2. Types of Contra...read more
  3. Time value of mo...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 AtkinsRealis interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Join AtkinsRealis Engineering a better future for our planet and its people

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.2k Interviews
Infosys Interview Questions
3.7
 • 7.5k Interviews
L&T Construction Interview Questions
4.0
 • 696 Interviews
Saint-Gobain Interview Questions
4.0
 • 169 Interviews
AECOM Interview Questions
4.3
 • 109 Interviews
Worley Interview Questions
4.1
 • 107 Interviews
View all
Assistant Engineer
225 salaries
unlock blur

₹4.6 L/yr - ₹12 L/yr

Graduate Engineer
197 salaries
unlock blur

₹3 L/yr - ₹7.5 L/yr

Design Engineer
103 salaries
unlock blur

₹6.3 L/yr - ₹22.5 L/yr

HR Analyst
99 salaries
unlock blur

₹3.6 L/yr - ₹7.4 L/yr

Assistant Lead Designer
94 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Explore more salaries
Compare AtkinsRealis with

Jacobs Engineering Group

4.1
Compare

Bechtel

4.0
Compare

Fluor Corporation

4.3
Compare

AECOM

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview