I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
Types of contracts include fixed-price, cost-reimbursable, time and material, and incentive contracts.
Fixed-price contracts have a set price for the project or deliverables.
Cost-reimbursable contracts reimburse the contractor for all costs incurred plus a fee.
Time and material contracts pay for the contractor's time and materials used.
Incentive contracts offer rewards for meeting or exceeding performance targets.
Other ...
Planning is deciding what to do and scheduling is deciding when to do it.
Planning involves setting goals, defining objectives, and determining the resources needed to achieve them.
Scheduling involves breaking down the plan into smaller tasks, assigning resources, and setting deadlines.
Planning is more strategic and long-term, while scheduling is more tactical and short-term.
Planning is about creating a roadmap, while s...
Time value of money refers to the concept that money available at the present time is worth more than the same amount in the future.
The value of money decreases over time due to inflation
Investing money can increase its value over time
Discounted cash flow analysis is used to calculate the present value of future cash flows
Time value of money is important in project management for budgeting and financial planning
Top trending discussions
posted on 14 Feb 2023
I applied via campus placement at National Institute of Technology (NIT), Kurukshetra and was interviewed before May 2023. There was 1 interview round.
It is the final round with the Saint gobain glass CEO where you are provided with a research paper and you are supposed to prepare it in one day and present it in front of CEO, nominal difficulty level, from my experience they were trying to gauge presence of mind in candidates.
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 4 interview rounds.
I applied via campus placement at Indian Institute of Technology (IIT), Mumbai and was interviewed in Dec 2023. There was 1 interview round.
Uniform loading refers to distributing a load evenly across a surface or structure.
Uniform loading helps prevent stress concentrations and ensures stability.
It is commonly used in engineering and construction to ensure the safety and integrity of structures.
Examples include evenly distributed weight on a shelf or uniform pressure on a bridge.
posted on 25 Dec 2023
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
Past Projects details to explain,
We used bored pile foundation method in our previous project.
Bored pile foundation method was used for piling in the previous project.
The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.
Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.
The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.
Operating pile driving equipment efficiently
Maintaining and repairing equipment as needed
Ensuring safety protocols are followed during pile driving operations
The density of a polymer refers to its mass per unit volume.
Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).
The density of a polymer can vary depending on factors such as its chemical composition and structure.
For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.
Higher density polymers tend to be more rigid and have higher melting points.
The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.
Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.
The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.
Water test details should include para...
posted on 6 May 2022
I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.
posted on 11 Aug 2021
Technical and administrative issues during construction execution and their solutions
Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders
Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting
Effective project...
The quantity of piping done at our location and the total duration for completion varied depending on the project.
The quantity of piping done at our location ranged from project to project.
The total duration for completion also varied based on the size and complexity of the project.
For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.
In another project...
Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.
Types of valves include gate, globe, ball, butterfly, and check valves.
Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.
Units of pressure include psi, bar, kPa, and MPa.
Conversions between units of pressure can be done using conversion factors.
For example, 1
Assistant Engineer
225
salaries
| ₹4.6 L/yr - ₹12 L/yr |
Graduate Engineer
197
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Design Engineer
103
salaries
| ₹6.3 L/yr - ₹22.5 L/yr |
HR Analyst
99
salaries
| ₹3.6 L/yr - ₹7.4 L/yr |
Assistant Lead Designer
94
salaries
| ₹6 L/yr - ₹15 L/yr |
Jacobs Engineering Group
Bechtel
Fluor Corporation
AECOM