Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Feb 2024. There were 2 interview rounds.
Paid tests in a few minutes to complete this project and supplementary material
Top trending discussions
I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
Control over parts failure and breakdowns
Implementing a robust quality control system
Conducting regular inspections and maintenance checks
Using reliable and high-quality parts
Analyzing failure data to identify root causes and implement corrective actions
Providing training to employees on proper handling and maintenance of equipment
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
Common problems in paints include cracking, peeling, fading, and bubbling. Cost-saving measures include proper surface preparation, using high-quality materials, and efficient application techniques.
Common problems in paints include cracking, peeling, fading, and bubbling
To deal with these problems, ensure proper surface preparation before painting
Use high-quality paints and materials to prevent issues like fading and ...
To save costs and sell products at a reasonable price while maintaining quality, we can optimize production processes, source materials efficiently, and minimize waste.
Optimize production processes to reduce waste and increase efficiency
Source materials efficiently by negotiating with suppliers for better prices
Minimize waste by implementing lean manufacturing principles
Invest in research and development to find innova...
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via LinkedIn and was interviewed in Apr 2023. There were 3 interview rounds.
CHATGPT Group discussion
I applied via Referral and was interviewed before Mar 2023. There were 3 interview rounds.
Basic & technical details of vote field
Soil liquid & plastic limit criteria and compaction test requirement
Soil liquid limit is the moisture content at which soil transitions from a plastic to a liquid state
Soil plastic limit is the moisture content at which soil can be rolled into a thread of a specific diameter without breaking
Compaction test is used to determine the optimal moisture content and maximum dry density of soil for construction
I was interviewed in Aug 2023.
posted on 3 Mar 2024
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Coding, decoding analytical reasoning process related question put up input & output decision making etc.
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
Logical reasoning current affairs
Quess
L&T Construction
Udaan
Ekart Logistics