Filter interviews by
Be the first one to contribute and help others!
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
IS codes for civil and working experience
IS codes refer to the Indian Standards codes for civil engineering
These codes provide guidelines and specifications for various aspects of civil engineering
Some important IS codes for civil engineering include IS 456:2000 for the design of concrete structures, IS 800:2007 for the design of steel structures, and IS 1893:2016 for seismic design
Working experience in civil engineeri...
I applied via Approached by Company
I applied via Walk-in and was interviewed in Jul 2021. There were 3 interview rounds.
I appeared for an interview in Mar 2023, where I was asked the following questions.
When workload is low, I focus on proactive improvements, team development, and strategic planning to enhance overall productivity.
Conduct a skills assessment of the team to identify areas for development, such as offering training sessions on new software.
Engage in strategic planning by reviewing current projects and identifying potential future opportunities or improvements.
Encourage team collaboration by organizing b...
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
posted on 22 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
posted on 21 Feb 2022
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu
based on 28 reviews
Rating in categories
Production Officer
7
salaries
| ₹3 L/yr - ₹4.1 L/yr |
Assistant Manager
5
salaries
| ₹4.4 L/yr - ₹6.5 L/yr |
CNC Operator
5
salaries
| ₹1.4 L/yr - ₹2.2 L/yr |
Quality Officer
5
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Deputy Manager
4
salaries
| ₹7.1 L/yr - ₹9 L/yr |
Ramky Infrastructure
McNally Bharat Engineering
Consolidated Construction Consortium
SPML Infra