Upload Button Icon Add office photos

Filter interviews by

Ashok Leyland John Deere Construction Equipment Engineer Interview Questions and Answers

Updated 10 Aug 2021

Ashok Leyland John Deere Construction Equipment Engineer Interview Experiences

1 interview found

Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Aug 2021

Interview Questionnaire 

2 Questions

  • Q1. Mostly C questions were asked.
  • Q2. Structures, volatile keywords, storage class were asked.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There were 6 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Can you provide an introduction about yourself?
  • Ans. 

    Experienced engineer with a background in mechanical and electrical engineering, specializing in project management and problem-solving.

    • Bachelor's degree in Mechanical Engineering from XYZ University

    • 5+ years of experience working in the automotive industry

    • Proficient in CAD software such as SolidWorks and AutoCAD

    • Led a team of engineers to successfully launch a new product line

  • Answered by AI
  • Q2. What is the organizational structure of the toolroom?
  • Ans. 

    The toolroom is typically organized in a hierarchical structure with a manager overseeing toolmakers and machinists.

    • Typically led by a Toolroom Manager who oversees the operations

    • Toolmakers and machinists report to the Toolroom Manager

    • May have specialized teams for different types of tools or machinery

    • Collaborates closely with engineering and production departments

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Organization structure
  • Q2. What is the process of mold maintenance?
  • Ans. 

    Mold maintenance involves regular cleaning, inspection, and repair of molds used in manufacturing processes.

    • Regularly clean molds to prevent buildup of residue or contaminants

    • Inspect molds for wear and tear, cracks, or other damage

    • Repair any issues found during inspection to ensure molds function properly

    • Store molds properly when not in use to prevent damage or contamination

  • Answered by AI
Round 3 - Assignment 

Encourage a positive culture that fosters the development of new ideas and activities for improvement.

Round 4 - Technical 

(2 Questions)

  • Q1. What is the difference between corrective action and preventive action?
  • Ans. 

    Corrective action is taken to address an existing issue, while preventive action is taken to avoid potential issues in the future.

    • Corrective action is reactive, addressing problems that have already occurred.

    • Preventive action is proactive, aiming to prevent problems from happening in the first place.

    • Corrective action focuses on fixing the root cause of a problem.

    • Preventive action focuses on identifying and eliminating ...

  • Answered by AI
  • Q2. What are the differences between preventive maintenance and predictive maintenance?
  • Ans. 

    Preventive maintenance is scheduled maintenance performed on a regular basis to prevent breakdowns, while predictive maintenance uses data and analytics to predict when equipment will fail.

    • Preventive maintenance is scheduled at regular intervals to prevent breakdowns.

    • Predictive maintenance uses data and analytics to predict when equipment will fail.

    • Preventive maintenance is time-based, while predictive maintenance is c...

  • Answered by AI
Round 5 - Technical 

(2 Questions)

  • Q1. What is breakdown maintenance?
  • Ans. 

    Breakdown maintenance is a type of maintenance where equipment is only repaired after it has broken down.

    • Breakdown maintenance is reactive in nature, as repairs are only done after a breakdown occurs.

    • It can lead to increased downtime and production losses.

    • This type of maintenance is usually more costly compared to preventive maintenance.

    • Examples include fixing a machine only when it stops working or repairing a vehicle

  • Answered by AI
  • Q2. What is the frequency of preventive maintenance?
  • Ans. 

    The frequency of preventive maintenance varies depending on the equipment and industry standards.

    • Frequency of preventive maintenance is typically determined by equipment manufacturer recommendations.

    • Some industries may have specific regulations or standards that dictate the frequency of preventive maintenance.

    • Factors such as usage, environmental conditions, and criticality of the equipment can also influence the freque...

  • Answered by AI
Round 6 - Technical 

(2 Questions)

  • Q1. Lifter pad and lifter different
  • Ans. 

    Lifter pad and lifter are different components used in mechanical systems.

    • Lifter pad is a component used to support and lift heavy objects, while lifter is a device used to lift and move objects vertically.

    • Lifter pads are often made of rubber or other materials to provide cushioning and grip, while lifters can be hydraulic, pneumatic, or mechanical.

    • Lifter pads are stationary and provide a stable base for lifting, while...

  • Answered by AI
  • Q2. What is the frequency of tool life
  • Ans. 

    The frequency of tool life refers to how often a tool needs to be replaced or maintained.

    • Frequency of tool life is determined by factors such as material being worked on, cutting speed, and tool material.

    • Higher cutting speeds or harder materials may require more frequent tool changes.

    • Regular maintenance and monitoring can help extend tool life and reduce frequency of replacements.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job and learning opportunities within the KML group.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There were 4 interview rounds.

Round 1 - Aptitude Test 

It been from your studies and some from general knowledge and few are technical

Round 2 - Group Discussion 

GD is about the new technology in automotive industry

Round 3 - HR 

(3 Questions)

  • Q1. It's about me and my family
  • Q2. Technical questions from polymer materials
  • Q3. My experience in industry
  • Ans. 

    I have 5 years of experience working in the automotive industry as a mechanical engineer.

    • Designed and implemented new components for vehicles

    • Performed testing and analysis on vehicle systems

    • Collaborated with cross-functional teams to solve engineering challenges

  • Answered by AI
Round 4 - Technical 

(2 Questions)

  • Q1. Explanation about my projects
  • Ans. 

    I have worked on various projects including designing a new software system for a manufacturing company and implementing a renewable energy solution for a community.

    • Designed and implemented a new software system for a manufacturing company to streamline production processes

    • Developed a renewable energy solution for a community by installing solar panels and wind turbines

    • Collaborated with a team of engineers to optimize ...

  • Answered by AI
  • Q2. How is injection molding machine working and new technology development in machine's
  • Ans. 

    Injection molding machine works by melting plastic pellets and injecting the molten material into a mold to create a solid object.

    • Plastic pellets are fed into a heated barrel where they are melted

    • The molten plastic is then injected into a mold cavity under high pressure

    • The plastic cools and solidifies in the mold, taking its shape

    • New technology developments include faster cycle times, improved energy efficiency, and en...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep on trying and don't let you down at any time in interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the rotary shaft marital
  • Ans. 

    Rotary shaft material refers to the material used to construct the rotating shaft in a machine or equipment.

    • Common materials include steel, stainless steel, aluminum, and titanium.

    • The choice of material depends on factors such as strength, corrosion resistance, and cost.

    • For high-speed applications, materials with good fatigue resistance like chrome-molybdenum steel are preferred.

    • In corrosive environments, materials lik...

  • Answered by AI
  • Q2. Tig welding gas
  • Q3. How you will manage the department and service
  • Ans. 

    I will manage the department by setting clear goals, providing support to team members, monitoring progress, and fostering a positive work environment.

    • Set clear goals and expectations for the department

    • Provide support and resources to team members

    • Monitor progress and performance regularly

    • Foster a positive work environment through open communication and recognition of achievements

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Say me about your past experience
  • Ans. 

    I have 5 years of experience working as a mechanical engineer in the automotive industry.

    • Designed and implemented new components for vehicle engines

    • Performed stress analysis and simulations to ensure product durability

    • Collaborated with cross-functional teams to troubleshoot and resolve technical issues

    • Managed projects from concept to production, meeting strict deadlines

  • Answered by AI
  • Q2. Eloborate the projects that you have worked on
  • Ans. 

    I have worked on various projects including designing a new software system for a manufacturing company and implementing a renewable energy solution for a residential building.

    • Designed a new software system for a manufacturing company to streamline production processes

    • Implemented a renewable energy solution for a residential building to reduce energy costs and environmental impact

    • Collaborated with a team of engineers t...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Salary expectations
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. General technical questions on electronics
  • Q2. Understanding applications of MOSFETs, Diodes,battery...
  • Ans. 

    MOSFETs, diodes, and batteries are essential components in electronic circuits for various applications.

    • MOSFETs are used for amplification, switching, and signal processing in electronic devices.

    • Diodes are used to control the direction of current flow and protect circuits from reverse voltage.

    • Batteries provide portable power sources for electronic devices, ranging from small button cells to large lithium-ion batteries.

    • ...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Can you describe your experience and the projects you have worked on?
  • Ans. 

    I have 5 years of experience working on various engineering projects, including designing new products and improving existing systems.

    • Designed a new HVAC system for a commercial building

    • Implemented automation processes to increase efficiency in manufacturing

    • Collaborated with a team to develop a prototype for a renewable energy project

  • Answered by AI
  • Q2. Expected salary
  • Ans. 

    My expected salary is based on my experience, skills, and the industry standard for engineers.

    • Consider my years of experience in the field

    • Take into account my specialized skills and certifications

    • Research the average salary range for engineers in this industry

    • Negotiate based on the benefits and opportunities offered by the company

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There were 4 interview rounds.

Round 1 - Aptitude Test 

Math, Reasoning, verbility

Round 2 - Technical 

(11 Questions)

  • Q1. What is the Wire Colour coding
  • Ans. 

    Wire colour coding is a standard method of identifying the function of different wires in electrical systems.

    • In North America, the standard wire colour coding for AC power circuits is black for hot, white for neutral, and green or bare copper for ground.

    • In Europe, the standard wire colour coding for AC power circuits is brown for live, blue for neutral, and green/yellow for ground.

    • Different industries may have their ow...

  • Answered by AI
  • Q2. What is the Crimping
  • Ans. 

    Crimping is a process of joining two pieces of metal or other materials by deforming one or both of them to hold the other.

    • Crimping is commonly used in electrical work to join wires to connectors.

    • It is also used in plumbing to connect pipes together.

    • Crimping tools are often used to create a secure connection.

  • Answered by AI
  • Q3. What is the HV
  • Ans. 

    HV stands for High Voltage, which refers to electrical potential difference between two points that exceeds the safe threshold.

    • HV is typically considered to be any voltage above 1000 volts.

    • High Voltage is commonly used in power transmission and distribution systems.

    • HV can be dangerous and requires proper safety precautions when working with it.

  • Answered by AI
  • Q4. What is the HV and air leak test and why is required for Customer
  • Ans. 

    HV and air leak tests are essential for ensuring safety and quality of products before delivery to customers.

    • HV test, or high voltage test, is conducted to check insulation integrity and electrical safety of the product.

    • Air leak test is performed to verify the sealing integrity of the product, ensuring no leaks that could compromise performance or safety.

    • These tests are required for customers to guarantee that the prod...

  • Answered by AI
  • Q5. How to Control Quality of Insulation
  • Ans. 

    Quality of insulation can be controlled through proper material selection, installation techniques, and regular inspections.

    • Selecting high-quality insulation materials with appropriate R-values for the specific application

    • Ensuring proper installation techniques are followed to minimize gaps and air leaks

    • Conducting regular inspections to check for signs of wear, damage, or moisture intrusion

    • Using thermal imaging technol...

  • Answered by AI
  • Q6. What is HST and Why HST is using in the wire harness
  • Ans. 

    HST stands for Heat Shrink Tubing, used in wire harness for insulation and protection.

    • HST is a type of tubing that shrinks when heat is applied, providing insulation and protection to wires in a harness.

    • It helps in preventing short circuits, abrasion, and moisture damage.

    • HST is commonly used in automotive, aerospace, and electronics industries.

    • Examples of HST brands include 3M, TE Connectivity, and Panduit.

  • Answered by AI
  • Q7. What is thermistor and How many type of thermistor
  • Ans. 

    A thermistor is a type of resistor whose resistance changes significantly with temperature. There are two main types: NTC (Negative Temperature Coefficient) and PTC (Positive Temperature Coefficient).

    • Thermistors are commonly used in temperature sensing applications.

    • NTC thermistors have a negative temperature coefficient, meaning their resistance decreases as temperature increases.

    • PTC thermistors have a positive tempera...

  • Answered by AI
  • Q8. What is EMC testing
  • Ans. 

    EMC testing is the process of evaluating and verifying the electromagnetic compatibility of electronic devices.

    • EMC testing ensures that electronic devices do not interfere with each other's operation

    • It also ensures that electronic devices are not susceptible to interference from external sources

    • Common EMC tests include radiated emissions, conducted emissions, and immunity testing

    • EMC testing is important for compliance ...

  • Answered by AI
  • Q9. What is Ferrite Core and why it is use .
  • Ans. 

    Ferrite core is a magnetic core made of ferrite material used in electronic components for its high magnetic permeability and low electrical conductivity.

    • Ferrite core is commonly used in transformers, inductors, and electromagnets.

    • It helps increase the inductance and efficiency of electronic components.

    • Ferrite cores are also used in noise suppression filters to reduce electromagnetic interference.

    • They are preferred ove...

  • Answered by AI
  • Q10. What is EV and type of EV
  • Ans. 

    EV stands for Electric Vehicle, which is a vehicle that runs on electricity instead of gasoline.

    • Types of EVs include Battery Electric Vehicles (BEVs), Plug-in Hybrid Electric Vehicles (PHEVs), and Hybrid Electric Vehicles (HEVs).

    • BEVs run solely on electricity stored in batteries and do not have a gasoline engine.

    • PHEVs have both an electric motor and a gasoline engine, allowing them to switch between electric and gasoli...

  • Answered by AI
  • Q11. Parabolic Equation and what a in parabolic Equation
  • Ans. 

    A parabolic equation is a second-degree polynomial equation in the form y = ax^2 + bx + c, where 'a' is the coefficient of the x^2 term.

    • A parabolic equation is a type of quadratic equation that forms a U-shaped curve when graphed.

    • The coefficient 'a' in a parabolic equation determines the direction and width of the parabola. A positive 'a' value opens upwards, while a negative 'a' value opens downwards.

    • For example, the ...

  • Answered by AI
Round 3 - Group Discussion 

What is EV and What is role in green environment

Round 4 - HR 

(4 Questions)

  • Q1. Why are you joining our Company
  • Q2. What is your sallary expectations
  • Ans. 

    My salary expectations are based on my experience, qualifications, and the industry standard.

    • Consider my years of experience in the field

    • Research the average salary range for this position in the industry

    • Take into account my qualifications and skills

    • Open to negotiation based on benefits package

  • Answered by AI
  • Q3. Tell me about your self
  • Q4. Tell me your achievement and Goal

Interview Preparation Tips

Interview preparation tips for other job seekers - When you are going to interview then you knows all about company.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Cnc programming, New product development
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. 1 -Self introduction 2- what was roll and responsibilities in your privious company. 3-about 7 qc tools 4-kaiez,5s extra.
Round 3 - HR 

(1 Question)

  • Q1. 1-Self introduction 2-hobbey 3-what do you want in future.

Interview Preparation Tips

Interview preparation tips for other job seekers - Resume update daily basis and apply for your criteria

Ashok Leyland John Deere Construction Equipment Interview FAQs

What are the top questions asked in Ashok Leyland John Deere Construction Equipment Engineer interview?

Some of the top questions asked at the Ashok Leyland John Deere Construction Equipment Engineer interview -

  1. Structures, volatile keywords, storage class were ask...read more
  2. Mostly C questions were ask...read more

Tell us how to improve this page.

Lead Engineer
3 salaries
unlock blur

₹16.1 L/yr - ₹19.5 L/yr

Explore more salaries
Compare Ashok Leyland John Deere Construction Equipment with

Yazaki

3.8
Compare

Delphi TVS

3.9
Compare

JK Tyres

3.7
Compare

Lucas-TVS

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview