Filter interviews by
Be the first one to contribute and help others!
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
I was interviewed before Feb 2024.
Preventive maintenance is the practice of regularly inspecting, cleaning, and servicing equipment to prevent breakdowns and prolong its lifespan.
Regularly inspecting equipment for signs of wear and tear
Cleaning and lubricating moving parts
Replacing worn out parts before they fail
Scheduling routine maintenance tasks based on manufacturer recommendations
Examples: changing the oil in a car every 5,000 miles, cleaning the
Preventive maintenance is the practice of regularly inspecting, cleaning, and servicing equipment to prevent breakdowns and prolong its lifespan.
Regularly inspecting equipment for signs of wear and tear
Cleaning and lubricating machinery to prevent corrosion and friction
Replacing worn out parts before they fail
Scheduling routine maintenance tasks based on manufacturer recommendations
Examples: changing oil in a car, clea
Depend upon role and designation assignment will be given
posted on 6 Jan 2025
posted on 21 Mar 2024
I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.
The three pillars of SCRUM are transparency, inspection, and adaptation.
Transparency: All aspects of the process must be visible to those responsible for the outcome. This includes progress, obstacles, and changes.
Inspection: SCRUM artifacts and progress must be inspected frequently to detect variances and adapt accordingly.
Adaptation: Based on the inspection results, adjustments are made to ensure that the goals are m
I applied via Referral and was interviewed before Aug 2020. There was 1 interview round.
I prioritize tasks based on urgency and importance, delegate when necessary, and use time management techniques.
Prioritize tasks based on urgency and importance
Delegate tasks when necessary
Use time management techniques like creating a to-do list and setting deadlines
Break down complex tasks into smaller manageable steps
Utilize tools and technology to streamline processes
Communicate effectively with team members and st
I will identify the root cause, involve the team, and implement a solution to prevent future occurrences.
Identify the problem and its root cause
Involve the team in brainstorming solutions
Implement a solution and monitor its effectiveness
Document the problem and solution for future reference
I applied via Company Website and was interviewed in May 2021. There were 7 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.
I was interviewed in Dec 2022.
posted on 6 Sep 2024
OEE can be measured by calculating the product of availability, performance, and quality.
Calculate availability by dividing actual production time by planned production time.
Calculate performance by dividing actual production rate by maximum production rate.
Calculate quality by dividing good parts produced by total parts produced.
Multiply availability, performance, and quality to get OEE percentage.
For example, if avai...
Medical Representative
185
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Chemist
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Sales Manager
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Officer
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Sun Pharmaceutical Industries
Cipla
DRJ & CO
Lupin