Arihant Components
10+ Baba Construction Company Interview Questions and Answers
Q1. if material purchase in party but some material in liquid and some has been expiared how would have in this case?
In case of purchasing expired or liquid material from a party, we would take necessary actions to ensure quality and safety.
We would immediately inform the party about the issue and request a replacement or refund.
If replacement or refund is not possible, we would dispose of the expired or liquid material properly.
We would conduct a thorough inspection of all materials purchased from the party to ensure quality and safety.
We would also review our purchasing policies and proce...read more
Q2. which is responsibity?in store how, will be manage , in ward material and outward material
The responsibility of a Store Incharge is to manage both inward and outward materials in the store.
The Store Incharge is responsible for receiving and inspecting inward materials, ensuring their proper storage and organization.
They must maintain accurate records of inward materials, including quantities, specifications, and storage locations.
The Store Incharge should also handle outward materials, ensuring timely and accurate dispatch to the intended recipients.
They need to c...read more
Q3. store responsibity in manage outward inward control
Store Incharge is responsible for managing inward and outward control of the store.
Maintaining inventory records
Ensuring timely delivery of goods
Managing stock levels
Supervising staff
Implementing security measures
Preparing reports
Coordinating with other departments
Q4. how would be control maximum and menimum level
Control maximum and minimum levels by setting inventory thresholds and monitoring stock levels regularly.
Set inventory thresholds for maximum and minimum levels
Monitor stock levels regularly to ensure they stay within the set thresholds
Adjust inventory levels as needed to maintain optimal stock levels
Use inventory management software to track stock levels and set alerts for when levels reach the maximum or minimum thresholds
Implement a system for reordering stock when levels ...read more
Q5. how much lead to company with control to material.
Lead time for material control depends on various factors such as supplier lead time, production lead time, and inventory levels.
Lead time for material control is the time taken from placing an order to receiving the material.
It depends on the supplier lead time, which is the time taken by the supplier to deliver the material.
Production lead time is the time taken by the company to manufacture the product.
Inventory levels also play a crucial role in determining the lead time ...read more
Q6. verify to cost to market and received sheet of .cost in transporter
The cost to market and received sheet of cost in transporter needs to be verified.
The cost to market includes all expenses incurred in getting the product to the market, such as transportation, advertising, and packaging costs.
The received sheet of cost in transporter should include all expenses related to transporting the product, such as fuel costs, tolls, and driver salaries.
To verify the cost to market and received sheet of cost in transporter, one should compare the actu...read more
Q7. how control out side rejection
To control outside rejection, proper communication with suppliers and quality checks are necessary.
Establish clear quality standards and communicate them to suppliers
Regularly inspect incoming materials and reject any that do not meet standards
Train employees on proper handling and storage of materials to prevent damage or contamination
Maintain good relationships with suppliers to encourage timely and quality deliveries
Implement a feedback system to address any recurring issu...read more
Q8. how can manege.in transportation cost.
Transportation cost can be managed by optimizing routes, using fuel-efficient vehicles, and negotiating with suppliers.
Optimize routes to reduce distance and fuel consumption
Use fuel-efficient vehicles to save on fuel costs
Negotiate with suppliers for better rates and discounts
Consolidate shipments to reduce the number of trips
Implement a transportation management system to track and manage costs
Train drivers on fuel-efficient driving techniques
Consider alternative modes of t...read more
Q9. how issue raw material
Raw materials are issued based on production requirements and inventory levels.
Raw materials are issued through a requisition process.
The requisition is approved by the production manager or supervisor.
Inventory levels are checked before issuing raw materials.
The quantity issued is based on the production requirements.
The issued raw materials are recorded in the inventory system.
Q10. what is company police,
Company police refers to the security personnel hired by a company to maintain law and order within its premises.
Company police are responsible for ensuring the safety and security of employees, customers, and assets within the company's premises.
They may be authorized to carry firearms and have the power to make arrests.
Their duties may include monitoring CCTV cameras, conducting security checks, and responding to emergencies.
Examples of companies that have their own police ...read more
Q11. how would be despatch material
Dispatch material should be done efficiently and accurately to ensure timely delivery and customer satisfaction.
Ensure proper packaging and labeling of products
Verify accuracy of order and shipping details
Coordinate with logistics team for timely pickup and delivery
Maintain proper documentation and records
Monitor inventory levels and reorder as necessary
Q12. material issue in planing wise
Material issue in planning refers to the process of determining the quantity and timing of materials needed for production.
Planning involves forecasting demand and determining the required inventory levels.
Materials are issued based on the production schedule and availability.
Effective material issue planning ensures smooth production and avoids stockouts or excess inventory.
Factors such as lead times, supplier reliability, and production capacity must be considered.
Software ...read more
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month