Add office photos
Employer?
Claim Account for FREE

Arabtec Construction

4.6
based on 181 Reviews
Filter interviews by

All Rounder Mason Interview Questions and Answers

Updated 5 Feb 2024

Q1. Before starting block work what tipe of preparation we have to do

Ans.

Before starting block work, preparation involves site survey, layout marking, excavation, and foundation preparation.

  • Conduct a site survey to assess the ground conditions and identify any potential obstacles or hazards.

  • Mark the layout of the block work using strings, stakes, and levels to ensure accurate positioning.

  • Excavate the area where the block work will be installed, removing any existing debris or vegetation.

  • Prepare the foundation by compacting the soil, adding a layer...read more

View 1 answer

Q2. What will you fix at the iointof rcc walls and blocks walls

Ans.

In order to fix the joints of RCC walls and block walls, various methods can be used such as grouting, sealing, and reinforcement.

  • Grouting is the process of filling the joints with a cementitious material to provide strength and stability.

  • Sealing the joints with appropriate sealants helps in preventing water leakage and enhancing the durability of the walls.

  • Reinforcing the joints with steel bars or mesh can improve the structural integrity of the walls.

  • Proper alignment and le...read more

View 1 answer

Q3. What is the weightof 25 mmdia steel bar of 4 mts

Ans.

The weight of a 25mm diameter steel bar of 4 meters length.

  • To calculate the weight, we need to know the density of the steel.

  • The density of steel is typically around 7850 kg/m^3.

  • Using the formula weight = volume * density, we can calculate the weight of the steel bar.

  • The volume of a cylindrical bar can be calculated using the formula volume = π * (diameter/2)^2 * length.

  • Substituting the values, we can calculate the weight of the steel bar.

View 1 answer

Q4. How much plaster can be don by 1 mason 1 Labour

Ans.

The amount of plaster that can be done by 1 mason and 1 labor depends on various factors.

  • The skill and experience of the mason and labor

  • The size and complexity of the area to be plastered

  • The type of plaster being used

  • The tools and equipment available

  • The time allocated for the task

  • The working conditions and environment

  • The efficiency and coordination between the mason and labor

  • On average, a skilled mason and labor can plaster around 20-30 square meters per day

View 1 answer
Discover All Rounder Mason interview dos and don'ts from real experiences

Q5. How will you check the right angle of walls corner

Ans.

To check the right angle of walls corner, use a carpenter's square or a digital angle finder.

  • Use a carpenter's square by placing it against the corner of the wall and checking if the edges align perfectly.

  • Alternatively, use a digital angle finder to measure the angle between the two walls and ensure it is 90 degrees.

  • Ensure the walls are straight and plumb before checking the corner angle.

View 1 answer

Q6. What's the size of ful play

Ans.

The size of a full play can vary depending on the specific production and script.

  • The size of a full play can range from small-scale productions with a few actors to large-scale productions with a large cast and elaborate sets.

  • Some plays may require a small ensemble cast, while others may have a large ensemble cast.

  • The size of a play can also be influenced by the number of scenes, locations, and set changes.

  • For example, a one-act play may have a smaller size compared to a thre...read more

View 1 answer

Q7. What' do you know about Safety

Ans.

Safety refers to the measures and precautions taken to prevent accidents, injuries, and hazards in the workplace.

  • Safety involves identifying and assessing potential risks and hazards in the workplace.

  • It includes implementing safety protocols, procedures, and guidelines to minimize or eliminate risks.

  • Safety also involves providing appropriate safety equipment and training to employees.

  • Regular inspections and audits are conducted to ensure compliance with safety standards.

  • Safet...read more

View 1 answer

Q8. What is meaning scale 1;30

Ans.

Scale 1:30 refers to a ratio where 1 unit on the scale represents 30 units in real life.

  • Scale 1:30 is commonly used in architectural and engineering drawings.

  • It means that every measurement on the drawing is 30 times smaller than the actual size.

  • For example, if a wall is represented as 10 cm on the drawing, its actual size would be 300 cm (10 cm x 30).

View 1 answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter