Upload Button Icon Add office photos

Filter interviews by

APC By Schneider Electric Procurement Engineer Interview Questions and Answers

Updated 4 Feb 2025

APC By Schneider Electric Procurement Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview in Jan 2025.

Round 1 - HR 

(2 Questions)

  • Q1. How u can handythe supplier.
  • Ans. 

    By building strong relationships, setting clear expectations, and communicating effectively.

    • Establish clear communication channels with the supplier

    • Set expectations for quality, delivery times, and pricing

    • Build a strong relationship based on trust and mutual benefit

    • Regularly review performance and provide feedback

    • Resolve any issues promptly and professionally

  • Answered by AI
  • Q2. On what basis u will release the PO
  • Ans. 

    PO release is based on supplier evaluation, price negotiation, contract terms, and delivery schedule.

    • Supplier evaluation based on quality, reliability, and past performance

    • Price negotiation to ensure competitiveness and value for money

    • Contract terms including payment schedule, warranties, and penalties

    • Delivery schedule to meet project timelines and requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - learn about communication skills with supplier.

Interview questions from similar companies

Interview Questionnaire 

4 Questions

  • Q1. Tell me something about yourself ?
  • Q2. What's your family background ?
  • Q3. Technical questions about my subject !!
  • Q4. Subjective knowledge of B.tech subject.

I appeared for an interview in Jul 2022.

Round 1 - Aptitude Test 

60 percent core and 40 percent aptitude

Round 2 - Technical 

(6 Questions)

  • Q1. What are the tests done on a transformer
  • Ans. 

    Tests done on a transformer include insulation resistance test, turns ratio test, winding resistance test, and load test.

    • Insulation resistance test checks the insulation resistance between windings and between windings and ground.

    • Turns ratio test measures the ratio of the number of turns in the primary winding to the number of turns in the secondary winding.

    • Winding resistance test measures the resistance of each windin...

  • Answered by AI
  • Q2. Why CT and PT are used
  • Ans. 

    CT and PT are used in electrical systems for measurement and protection purposes.

    • CT (Current Transformer) is used to measure high currents and step them down to a manageable level for measurement and protection devices.

    • PT (Potential Transformer) is used to measure high voltages and step them down to a safe level for measurement and protection devices.

    • CTs and PTs provide isolation and safety by separating the high volta...

  • Answered by AI
  • Q3. What is the generation voltage in india
  • Ans. 

    The generation voltage in India varies depending on the location and power plant.

    • The voltage ranges from 110V to 440V depending on the location.

    • The power plants generate electricity at different voltages.

    • The national grid operates at a voltage of 400kV and 765kV.

    • India has a mix of AC and DC power transmission systems.

  • Answered by AI
  • Q4. Why do we use high voltage for transmission?
  • Ans. 

    High voltage is used for transmission to reduce power loss and increase efficiency.

    • High voltage reduces the current required for a given amount of power, which reduces power loss due to resistance in the transmission lines.

    • Lower current also means smaller conductors can be used, reducing material and installation costs.

    • High voltage transmission is more efficient over long distances, reducing the need for additional pow...

  • Answered by AI
  • Q5. Which power plant is cheapest to install
  • Ans. 

    Renewable energy power plants are generally cheaper to install than traditional fossil fuel power plants.

    • Renewable energy power plants such as solar, wind, and hydroelectric are cheaper to install than traditional fossil fuel power plants.

    • The cost of installation for renewable energy power plants has decreased significantly in recent years due to advancements in technology and increased demand.

    • Fossil fuel power plants ...

  • Answered by AI
  • Q6. Why OC test done on LV side and SC test on HV side of Transformers
  • Ans. 

    OC test is done on LV side to avoid high voltage on secondary side. SC test is done on HV side to avoid high current on primary side.

    • LV side has lower voltage rating, hence safer for OC test

    • HV side has higher current rating, hence suitable for SC test

    • OC test checks insulation resistance and winding resistance

    • SC test checks impedance and voltage regulation

    • Example: A 100 MVA transformer with 220 kV HV and 33 kV LV rating

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The company is good in initial stages for learning new things but don't expect automation and it's purely manual.You can't use these skills outside as transformer manufacturing is pretty low developing area and

I applied via Naukri.com and was interviewed in Feb 2022. There were 4 interview rounds.

Round 1 - Aptitude Test 

I have prepared from gate pyq.

Round 2 - Coding Test 

Basic coading questions and concepts were asked.

Round 3 - Technical 

(2 Questions)

  • Q1. Oops, c++ , puzzles.
  • Q2. Oops concepts and applications. Depth knowledge of c++.
Round 4 - HR 

(1 Question)

  • Q1. Basic about yourself and your education, family members, city you belong.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't be fake be yourself and lean towards learning with learning attitude and strong belief system.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?

Interview Preparation Tips

Interview preparation tips for other job seekers - I think we should be focus of applicant dedication of work because this is very most for company growth and success
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Aptitude and technical

Round 3 - Technical 

(1 Question)

  • Q1. Boiler, powereplants

Interview Preparation Tips

Interview preparation tips for other job seekers - dont over commit
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Job Portal

Round 1 - Aptitude Test 

Good but not very good finally selected

Round 2 - Technical 

(5 Questions)

  • Q1. Question from all subjects
  • Q2. Quantum efficency , vswr
  • Q3. Transmission line
  • Q4. All topic related to microwave
  • Q5. Digital communication and ckt

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare all the topic which is in resume
Round 1 - Personal Interview 

(1 Question)

  • Q1. Are you satisfied with management view on cost cutting?
  • Ans. 

    I am satisfied with management's view on cost cutting as they have implemented effective strategies to reduce expenses without compromising quality.

    • Management has successfully implemented cost cutting measures without affecting the quality of products or services

    • They have involved employees in the cost cutting process to gather valuable insights and suggestions

    • Management regularly reviews and adjusts cost cutting strat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For the company, employees not a asset,it's a cost center only
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Spc msa iatf process capabilities
  • Q2. Man power handling

Interview Preparation Tips

Topics to prepare for Motherson Sumi Wiring Senior Engineer interview:
  • SPC Study
  • MSA
  • Iatf
Interview preparation tips for other job seekers - Easy interview
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Experience Related questions
Round 2 - Technical 

(1 Question)

  • Q1. Experience Related questions

APC By Schneider Electric Interview FAQs

How many rounds are there in APC By Schneider Electric Procurement Engineer interview?
APC By Schneider Electric interview process usually has 1 rounds. The most common rounds in the APC By Schneider Electric interview process are HR.
What are the top questions asked in APC By Schneider Electric Procurement Engineer interview?

Some of the top questions asked at the APC By Schneider Electric Procurement Engineer interview -

  1. on what basis u will release the...read more
  2. how u can handythe suppli...read more

Tell us how to improve this page.

APC By Schneider Electric Procurement Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Havells Interview Questions
4.0
 • 210 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
C&S Electric Interview Questions
4.0
 • 47 Interviews
Landis+Gyr Interview Questions
3.4
 • 29 Interviews
Mettler-Toledo Interview Questions
3.6
 • 23 Interviews
Legrand Interview Questions
3.7
 • 20 Interviews
View all
Deputy Manager
8 salaries
unlock blur

₹5.5 L/yr - ₹8 L/yr

Production Operator
7 salaries
unlock blur

₹1.1 L/yr - ₹3.2 L/yr

Assistant Engineer
6 salaries
unlock blur

₹1.2 L/yr - ₹2.9 L/yr

Manager
5 salaries
unlock blur

₹14 L/yr - ₹15 L/yr

Associate Test Engineer
5 salaries
unlock blur

₹1.9 L/yr - ₹2 L/yr

Explore more salaries
Compare APC By Schneider Electric with

Havells

4.0
Compare

BHEL

4.1
Compare

C&S Electric

4.0
Compare

Amphenol Interconnect

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview