I applied via Company Website and was interviewed in Apr 2020. There were 3 interview rounds.
There are multiple types of isolation permits used in production.
Isolation permits are used to ensure safety during production processes.
Common types of isolation permits include electrical, mechanical, and hot work permits.
Each type of isolation permit has specific requirements and procedures.
For example, an electrical isolation permit is used when working on electrical systems to prevent accidental energization.
A mec...
PPE stands for Personal Protective Equipment.
PPE is equipment worn to minimize exposure to hazards that can cause serious injuries or illnesses.
It includes items such as helmets, gloves, goggles, masks, and protective clothing.
PPE is used in various industries like construction, manufacturing, healthcare, and more.
Examples of PPE include hard hats for construction workers, safety glasses for laboratory technicians, and...
Units of pressure are measured in Pascals (Pa) or pounds per square inch (psi). Flow rate is measured in liters per minute (L/min) or gallons per minute (GPM).
Pressure units: Pa, psi
Flow rate units: L/min, GPM
Pressure is the force exerted per unit area
Flow rate is the volume of fluid passing through a given area per unit time
Top trending discussions
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Fe500 is a type of high-strength reinforcement steel used in construction.
Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).
It is commonly used in construction for its high strength and durability.
Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.
It is also known as TMT (Thermo-Mechanically Treated) s...
posted on 6 Nov 2019
I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.
posted on 6 Jun 2024
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
The type of steel used in slabs is typically reinforced steel bars, also known as rebar.
Reinforced steel bars are commonly used in slabs to provide tensile strength and prevent cracking.
Different grades of steel can be used depending on the structural requirements of the slab.
Examples of steel types used in slabs include ASTM A615 Grade 60 and ASTM A706 Grade 60 rebar.
Civil Site Engineers oversee construction projects, ensuring quality, safety, and compliance with regulations.
Project Planning: Develop detailed project plans and schedules, e.g., creating timelines for road construction.
Site Supervision: Monitor daily operations on-site to ensure adherence to design specifications and safety standards.
Quality Control: Conduct inspections and tests on materials, e.g., checking concrete...
Building construction involves a series of systematic steps from planning to completion, ensuring structural integrity and safety.
1. Site Preparation: Clearing the land and setting up temporary facilities.
2. Foundation Work: Excavating and pouring concrete for a stable base.
3. Framing: Constructing the skeleton of the building using wood or steel.
4. Roofing: Installing the roof structure and covering materials.
5. Utili...
I applied via Campus Placement and was interviewed in Jan 2023. There were 3 interview rounds.
Question had been asked from civil engineering syllabus
I applied via Walk-in and was interviewed in Jun 2024. There was 1 interview round.
posted on 22 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
My current CTC is $80,000 per year.
My current CTC is $80,000 per year
It includes base salary, bonuses, and benefits
I am open to negotiation based on the job role and responsibilities
I applied via Naukri.com and was interviewed in Aug 2021. There was 1 interview round.
The aim of a civil engineer is to design, construct, and maintain infrastructure that improves the quality of life for society.
Designing and planning infrastructure projects such as roads, bridges, and buildings
Ensuring the safety and functionality of structures
Managing construction projects and overseeing the work of contractors
Using innovative techniques and materials to improve efficiency and sustainability
Contribut...
Project Engineer
35
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Electrical Engineer
26
salaries
| ₹3.5 L/yr - ₹9.5 L/yr |
Instrument Engineer
24
salaries
| ₹2.4 L/yr - ₹8 L/yr |
Instrumentation Technician
19
salaries
| ₹2.3 L/yr - ₹4.2 L/yr |
Safety Officer
16
salaries
| ₹3.2 L/yr - ₹5.8 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon