Upload Button Icon Add office photos

Filter interviews by

ANI INTEGRATED SERVICES Project Coordinator Interview Questions and Answers

Updated 29 Jun 2021

ANI INTEGRATED SERVICES Project Coordinator Interview Experiences

1 interview found

I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Hr related. .like tell me about self ? Nd all that. Then technical as per Field

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest.collect information about company.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Basic of civil engineering and application of highway engineering
  • Q2. Work experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for initial 5 years learning phase. I recommend to join.

Interview Questionnaire 

2 Questions

  • Q1. Causes of accident
  • Ans. 

    Accidents can be caused by various factors such as human error, equipment failure, environmental conditions, and lack of safety measures.

    • Human error: Mistakes or negligence by individuals involved in the project.

    • Equipment failure: Malfunction or breakdown of machinery or tools.

    • Environmental conditions: Adverse weather, natural disasters, or other external factors.

    • Lack of safety measures: Insufficient safety protocols o...

  • Answered by AI
  • Q2. 1. Unsufficient maintenance of machinery.
  • Ans. 

    Insufficient maintenance of machinery can lead to breakdowns and production delays.

    • Regular maintenance schedules should be established and followed.

    • Proper training should be provided to operators and maintenance personnel.

    • Use of predictive maintenance techniques can help identify potential issues before they become major problems.

    • Examples: oil changes, lubrication, cleaning, calibration, inspections.

    • Failure to maintain...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident only

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake
    Round 1 - Group Discussion 

    How to ensure team.efficiency

    Round 2 - Case Study 

    A case study on conflict management

    Round 3 - One-on-one 

    (1 Question)

    • Q1. Why do you want this job

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Candidates should be lubricated before the final round with the domain head
    Interview experience
    5
    Excellent
    Difficulty level
    -
    Process Duration
    -
    Result
    -
    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - HR 

    (1 Question)

    • Q1. Hr for date of technical.
    Round 3 - Technical 

    (1 Question)

    • Q1. About. Work related work

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Well know about your experienced knowledge.
    Interview experience
    5
    Excellent
    Difficulty level
    Moderate
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected

    I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - Technical 

    (2 Questions)

    • Q1. Performance Tuning, Database Development
    • Q2. BI development and querying skills
    Round 3 - Technical 

    (1 Question)

    • Q1. BI Development and Team handling

    Interview Preparation Tips

    Topics to prepare for Ashoka Buildcon Project Manager interview:
    • Querying data
    • MS-Excel
    • Data Visualization
    • Apache Druid
    • Analytical skills

    Interview Questionnaire 

    1 Question

    • Q1. They asked about previous experience and they asked me what’ are piling activities you followed let me explain that’s it

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Share about your knowledge of work experience with confidently

    Coordinator Interview Questions & Answers

    AtkinsRealis user image Hemavati R Jadhav

    posted on 3 Aug 2023

    Interview experience
    4
    Good
    Difficulty level
    Moderate
    Process Duration
    4-6 weeks
    Result
    Selected Selected

    I applied via Referral and was interviewed before Aug 2022. There were 4 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
    View all tips
    Round 2 - Aptitude Test 

    Releted to building design shapes and the besic identification of the choose right picture out of four releted to the XY grid Mapping (latitude and lagtitude)etc

    Round 3 - One-on-one 

    (4 Questions)

    • Q1. One on one with team lead and Manager
    • Q2. Besic question on problem solving capabilities and quick action taking , flexibility of working with team and so on crytirias check
    • Q3. What will you do if you get some problem in work when ur team lead is not in office?
    • Q4. What will you do If you don't get hikes or recognition after doing your work effectively?
    Round 4 - HR 

    (1 Question)

    • Q1. All about salary documents etc

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Should have good knowledge of project done by company. Imp having good knowledge of UK Map will help

    I applied via Naukri.com and was interviewed before Oct 2020. There were 3 interview rounds.

    Interview Questionnaire 

    3 Questions

    • Q1. How u achieve your Schedule/goal.?
    • Ans. By Doing proper planning, arranging adequate Skill manpower, and required material /machineries on time, proper co-ordination with support office, Architect, Consultant, and Contractor, Timely cash flow management is play an important role to achieve Milestone and to meet our project schedule
    • Answered Anonymously
    • Q2. How long your team was previous company, and what are the depts, to whom you reported...?
    • Q3. My team in previous company was 45 Nos, department involves is Execution, Planning, Billing, Support office, Surveyor, Plant & Machineries etc..., I reported to company Project Co-ordinator and project He...

    Interview Preparation Tips

    Interview preparation tips for other job seekers - 1)Be Confident,
    2) Reply your answer very confident,
    3) wear official decent Dress, positive approach,
    4) in case you don't know the answer very politely reply that," I will find out its answer, currently don't know".

    ANI INTEGRATED SERVICES Interview FAQs

    How to prepare for ANI INTEGRATED SERVICES Project Coordinator interview?
    Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ANI INTEGRATED SERVICES. The most common topics and skills that interviewers at ANI INTEGRATED SERVICES expect are Project Coordination, MS Project, Project Control, Project Execution and Project Management.

    Tell us how to improve this page.

    ANI INTEGRATED SERVICES Project Coordinator Salary
    based on 6 salaries
    ₹3.1 L/yr - ₹5 L/yr
    21% less than the average Project Coordinator Salary in India
    View more details

    ANI INTEGRATED SERVICES Project Coordinator Reviews and Ratings

    based on 4 reviews

    3.8/5

    Rating in categories

    3.8

    Skill development

    3.7

    Work-life balance

    3.5

    Salary

    4.1

    Job security

    3.9

    Company culture

    2.9

    Promotions

    4.2

    Work satisfaction

    Explore 4 Reviews and Ratings
    Project Engineer
    35 salaries
    unlock blur

    ₹3.5 L/yr - ₹4.5 L/yr

    Electrical Engineer
    26 salaries
    unlock blur

    ₹3.5 L/yr - ₹9.5 L/yr

    Instrument Engineer
    24 salaries
    unlock blur

    ₹2.4 L/yr - ₹8 L/yr

    Instrumentation Technician
    19 salaries
    unlock blur

    ₹2.3 L/yr - ₹4.2 L/yr

    Safety Officer
    15 salaries
    unlock blur

    ₹3.2 L/yr - ₹5.8 L/yr

    Explore more salaries
    Compare ANI INTEGRATED SERVICES with

    L&T Construction

    4.0
    Compare

    Simplex Infrastructures

    3.4
    Compare

    ITD Cementation India

    4.3
    Compare

    Ashoka Buildcon

    4.1
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview