Upload Button Icon Add office photos

Filter interviews by

AMR INDIA Junior Engineer Interview Questions and Answers

Updated 27 May 2024

AMR INDIA Junior Engineer Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Telephonic Call 

(2 Questions)

  • Q1. What is a civil engineering?
  • Ans. 

    Civil engineering involves designing, constructing, and maintaining infrastructure such as buildings, roads, bridges, and dams.

    • Civil engineering focuses on the design, construction, and maintenance of infrastructure projects.

    • Civil engineers work on projects such as buildings, roads, bridges, dams, and water supply systems.

    • They use principles of physics, mathematics, and materials science to create safe and efficient st...

  • Answered by AI
  • Q2. Engineering is a branch it relatively designs&maintance of roads dams etc

Interview Preparation Tips

Interview preparation tips for other job seekers - good
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Sefty regulation and electrical apparatus deatil working principle of transformer,power and control circuit diagram of starter.
  • Ans. 

    The question asks about safety regulations, working principle of transformer, and power and control circuit diagram of starter.

    • Safety regulations ensure that electrical apparatus is safe to use.

    • Transformers work on the principle of electromagnetic induction.

    • Power circuit diagram of starter includes the main power source, motor, and overload protection.

    • Control circuit diagram of starter includes the start and stop butto

  • Answered by AI
  • Q2. Eler setting & principal of transformer
  • Ans. 

    Eler setting & principal of transformer

    • Eler setting refers to the adjustment of the number of turns in the primary and secondary coils of a transformer to achieve the desired voltage ratio

    • The principle of a transformer is based on Faraday's law of electromagnetic induction, which states that a changing magnetic field induces an electromotive force (EMF) in a conductor

    • Transformers are used to step up or step down voltag...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - CEAR regulation 2010 & should be Becik knowledge of electrical

Junior Engineer Interview Questions Asked at Other Companies

asked in Tata Steel
Q1. What is the main role of Junior engineer in Electrical maintenanc ... read more
asked in JSW Steel
Q2. Buchhlz relay, what is relay, what is sensor, you read or not ele ... read more
Q3. If reactor pressure or synthesis pressure increases then how to b ... read more
Q4. What is the thickness of motar used in brickwork (vertical/horizo ... read more
Q5. What is quality,how many types of quality.5s kaizen,gd&t & ... read more

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About the background

Interview Preparation Tips

Interview preparation tips for other job seekers - Please have good job knowledge

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my previous experience, and my scope of work?
  • Q2. Areas of strengths and areas need to develop

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview consisting of two rounds, first is about my personal details, which is intervied by Hr person. the second round is technical one, which was taken by Project director of the particular project. So i advice everyone be confident what you answering them, all the questions were asked about my experience part, and the knowledge what i have gained during the work apart from my education life. They also check all my documents. After completion of my interview and after 1 month, i got the offer letter of this company. Now iam so happy for this achievement. I hope all of the others who were attending for the interviews, hope you all get placed.

Thanks and Regards
Rahman

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

AMR INDIA Interview FAQs

How many rounds are there in AMR INDIA Junior Engineer interview?
AMR INDIA interview process usually has 1-2 rounds. The most common rounds in the AMR INDIA interview process are Technical, Telephonic Call and Resume Shortlist.
What are the top questions asked in AMR INDIA Junior Engineer interview?

Some of the top questions asked at the AMR INDIA Junior Engineer interview -

  1. Sefty regulation and electrical apparatus deatil working principle of transform...read more
  2. Eler setting & principal of transfor...read more
  3. what is a civil engineeri...read more

Tell us how to improve this page.

AMR INDIA Junior Engineer Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more
AMR INDIA Junior Engineer Salary
based on 4 salaries
₹1.8 L/yr - ₹4.8 L/yr
At par with the average Junior Engineer Salary in India
View more details
Assistant Manager
16 salaries
unlock blur

₹5.4 L/yr - ₹11 L/yr

Mining Engineer
15 salaries
unlock blur

₹4.6 L/yr - ₹7.2 L/yr

Civil Site Engineer
10 salaries
unlock blur

₹1.8 L/yr - ₹5.4 L/yr

HR Manager
7 salaries
unlock blur

₹7.7 L/yr - ₹10 L/yr

Assistant Manager- HR
7 salaries
unlock blur

₹3.6 L/yr - ₹5.5 L/yr

Explore more salaries
Compare AMR INDIA with

L&T Construction

4.0
Compare

Simplex Infrastructures

3.4
Compare

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview