Filter interviews by
I applied via Company Website and was interviewed in Jan 2024. There was 1 interview round.
posted on 2 May 2024
posted on 28 Sep 2021
I applied via Referral and was interviewed before Sep 2020. There was 1 interview round.
posted on 26 Sep 2019
I applied via Walk-in and was interviewed in Aug 2019. There was 1 interview round.
Power transmission lines carry high voltage power from power plants to substations while distribution lines carry lower voltage power from substations to homes and businesses.
Power transmission lines carry high voltage power over long distances
Distribution lines carry lower voltage power over shorter distances
Transmission lines use high voltage to reduce energy loss during long distance transmission
Distribution lines u...
posted on 31 Oct 2022
posted on 9 Apr 2024
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
Gravels are used in switch yards to provide a stable surface for equipment and to improve drainage.
Gravels help in reducing the risk of equipment damage due to flooding or standing water.
They also help in preventing erosion and maintaining the stability of the ground.
Gravels are easy to install and maintain, making them a cost-effective option for switch yards.
They allow for better heat dissipation, which is important ...
A Single Line Diagram (SLD) of a 33/11 kV switchyard shows the layout and connections of electrical equipment.
Key equipments include transformers, circuit breakers, isolators, busbars, surge arresters, and control panels.
Transformers step down voltage from 33 kV to 11 kV for distribution.
Circuit breakers protect the system from overloads and short circuits.
Isolators are used for isolating equipment for maintenance.
Busb...
OC and SC tests are conducted on transformers to determine their efficiency and performance under different load conditions.
OC test (Open Circuit test) is conducted to determine the no-load loss and magnetizing impedance of the transformer.
SC test (Short Circuit test) is conducted to determine the full-load copper loss and equivalent resistance of the transformer.
Both tests help in evaluating the efficiency and voltage...
posted on 22 Jun 2021
I applied via Recruitment Consultant and was interviewed before Jun 2020. There were 4 interview rounds.
posted on 14 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
Line balancing is the process of optimizing workloads across a production line to improve efficiency and reduce bottlenecks.
It involves analyzing the tasks required to complete a product and assigning them to workstations in a way that minimizes idle time and maximizes throughput.
Line balancing can help reduce production costs, increase output, and improve quality.
Examples of line balancing techniques include time stud...
Manpower allocation is based on project requirements, skill sets, availability, and workload.
Manpower allocation is a crucial aspect of production engineering.
It involves identifying the required skill sets for a project.
Availability of resources is also taken into consideration.
Workload is another factor that determines manpower allocation.
The allocation process is dynamic and can change based on project progress and
based on 1 interview
Interview experience
Associate Engineer
163
salaries
| ₹1.8 L/yr - ₹7.5 L/yr |
Quality Engineer
159
salaries
| ₹1 L/yr - ₹6.5 L/yr |
Quality Inspector
126
salaries
| ₹1.2 L/yr - ₹3.5 L/yr |
Assistant Manager
89
salaries
| ₹7 L/yr - ₹13.5 L/yr |
Quality Controller
84
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
GAO Tek
Kyungshin Industrial Motherson
Electrical Research & Development Association
East India Udyog