Upload Button Icon Add office photos

Filter interviews by

AMIAND CONSULTING MEP Site Engineer Interview Questions, Process, and Tips

Updated 15 Mar 2024

AMIAND CONSULTING MEP Site Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. About your self
  • Q2. Previous company work experience
Round 2 - Technical 

(7 Questions)

  • Q1. About MEP Questions
  • Q2. Electrical, Plumbing and Firefighting Questions
  • Q3. How many types of PVC Pipes
  • Ans. 

    There are mainly two types of PVC pipes: rigid PVC pipes and flexible PVC pipes.

    • Rigid PVC pipes are used for water supply, drainage, and irrigation systems.

    • Flexible PVC pipes are used for electrical conduits, cable protection, and ventilation systems.

  • Answered by AI
  • Q4. Difference between RCCB & ELCB
  • Ans. 

    RCCB is used to protect against earth faults, while ELCB is used to protect against earth leakage currents.

    • RCCB stands for Residual Current Circuit Breaker and protects against earth faults by detecting the difference in current flow between live and neutral wires.

    • ELCB stands for Earth Leakage Circuit Breaker and protects against earth leakage currents by detecting any current leakage to earth.

    • RCCB is more sensitive an...

  • Answered by AI
  • Q5. What is the centre level and top level of WC
  • Ans. 

    Centre level of WC is the level of the waste pipe connection and top level is the finished floor level of the WC.

    • Centre level of WC is the level at which the waste pipe connection is made.

    • Top level of WC is the finished floor level of the WC.

    • Centre level is important for proper installation of plumbing fixtures.

    • Top level is important for determining the height of the WC and other fixtures in relation to the finished fl

  • Answered by AI
  • Q6. About Lighting Arrestor
  • Q7. About HVAC Questions
Round 3 - One-on-one 

(4 Questions)

  • Q1. How much current be in lighting arrestor
  • Ans. 

    The current in a lighting arrestor depends on the specific design and rating of the device.

    • The current in a lighting arrestor is typically measured in kiloamperes (kA).

    • The current rating of a lighting arrestor is determined by the manufacturer and should be specified in the product documentation.

    • The current in a lighting arrestor is designed to safely divert lightning strikes away from the protected equipment or struct...

  • Answered by AI
  • Q2. Typing of Electrical Conduits
  • Q3. About 3 phase Distribution Board
  • Q4. About Transformer Installation

Interview Preparation Tips

Interview preparation tips for other job seekers - At interview time be normal

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Mivan formwork process?
  • Ans. 

    Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.

    • Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.

    • It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.

    • The system allows for smooth finishes...

  • Answered by AI
  • Q2. Finishing process
  • Q3. Reinforcement related

I applied via Referral and was interviewed in Sep 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1.  Introduction ,Expectation ,Able to relocate, Past experience ,Flexibility ,Determined,Long lasting

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Some basic questions about Ofc work and personal information
  • Q2. Ofc cable blowing how to start
  • Ans. 

    To start OFC cable blowing, follow these steps

    • Ensure that the ducts are clean and free of any obstruction

    • Attach the cable blowing machine to the duct

    • Connect the cable to the machine and start the blowing process

    • Monitor the cable's progress and adjust the machine's speed as needed

    • Once the cable has been blown through the entire length of the duct, detach the machine and cable

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Bondada Engineering Site Engineer interview:
  • Nld
  • Lm
Interview preparation tips for other job seekers - No fear in answering questions be strong
Just one interview it's enough to get job in bepl
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the Density of cement?
  • Ans. 

    The density of cement is around 1440 kg/m³.

    • The density of cement varies depending on the type of cement.

    • The density of Portland cement is around 1440 kg/m³.

    • The density of lightweight cement is around 1000 kg/m³.

    • The density of high-density cement is around 3000 kg/m³.

  • Answered by AI
  • Q2. What is clear cover in column?
  • Ans. 

    Clear cover in column refers to the distance between the surface of the reinforcement and the outer surface of the concrete.

    • Clear cover is important to protect the reinforcement from corrosion and to ensure proper bonding between the reinforcement and concrete.

    • The required clear cover for columns depends on factors such as the type of structure, exposure conditions, and size of the reinforcement.

    • For example, in a coast...

  • Answered by AI
  • Q3. What is bending moment formula?
  • Ans. 

    Bending moment formula calculates the internal bending moment in a beam or structure.

    • Bending moment formula is M = F * d

    • M is the bending moment, F is the force applied, and d is the distance from the force to the point of interest

    • Bending moment can be positive or negative depending on the direction of the force and the orientation of the beam

    • Bending moment is an important factor in designing and analyzing structures

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Bis 456
Interview preparation tips for other job seekers - Conduct interview on phone by using video call so that u can find good engineer easily.

Interview Questionnaire 

5 Questions

  • Q1. What the thickness of compreg ply and it's size
  • Ans. 

    The thickness of compreg ply varies depending on its intended use and application. Its size can also vary depending on the manufacturer and customer requirements.

    • The thickness of compreg ply can range from 3mm to 25mm or more

    • The size of compreg ply can vary from 4ft x 8ft to 5ft x 10ft or more

    • The thickness and size of compreg ply can be customized based on the specific requirements of the project

    • Compreg ply is commonly...

  • Answered by AI
  • Q2. Maximum reapetation of ply shuttering
  • Ans. 

    The maximum repetition of ply shuttering depends on various factors such as quality of ply, weather conditions, and type of concrete.

    • The maximum repetition of ply shuttering can range from 5 to 20 times depending on the above factors.

    • If the quality of ply is good and weather conditions are favorable, the ply shuttering can be reused more number of times.

    • However, if the concrete mix is harsh or the weather conditions ar...

  • Answered by AI
  • Q3. Consumption of shuttering oil per ltr how much area covered
  • Ans. 

    The consumption of shuttering oil per liter depends on the area covered.

    • The consumption of shuttering oil per liter can vary depending on factors such as the type of shuttering material, surface texture, and weather conditions.

    • On average, 1 liter of shuttering oil can cover approximately 10-15 square meters of surface area.

    • However, this can vary significantly based on the absorbency of the surface and the thickness of ...

  • Answered by AI
  • Q4. How much elongation % of fe550 steel
  • Ans. 

    The elongation % of fe550 steel varies depending on the specific grade and manufacturing process.

    • The elongation % of fe550 steel can range from 14% to 20%.

    • It is important to refer to the specifications provided by the manufacturer for accurate information.

    • The elongation % indicates the ability of the steel to deform before breaking under tension.

    • Fe550 steel is commonly used in construction and reinforcement application

  • Answered by AI
  • Q5. What the mean of rolling margin of the steel
  • Ans. 

    Rolling margin of steel is the difference between the target thickness and the actual thickness after rolling.

    • Rolling margin is a measure of the accuracy of the rolling process.

    • It is calculated by subtracting the actual thickness of the steel after rolling from the target thickness.

    • A positive rolling margin means the steel is thicker than intended, while a negative rolling margin means it is thinner.

    • Rolling margin is i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and deeply knowledge of each material and it's properties
Round 1 - Technical 

(1 Question)

  • Q1. Introduction,goals,Explain your final year project

Interview Preparation Tips

Interview preparation tips for other job seekers - Do preperation on communication skill development,focus on technical area,have a goal

I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Case Study 

Construction material and techniques
Construction labour management
Site work

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Autocad
  • REVIT Architecture
Interview preparation tips for other job seekers - I am very happy to construction work related jobs and design course are completed
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Basics civil engineering
  • Q2. How is your last project does
  • Q3. What is your additional skills
  • Q4. What about your addition launguage
  • Q5. Where is your home town
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. About experience
  • Q2. Salary negotiation
Round 2 - Technical 

(2 Questions)

  • Q1. Batching plant erection and maintenance
  • Q2. Vehicle utilisation

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on core trade

AMIAND CONSULTING Interview FAQs

How many rounds are there in AMIAND CONSULTING MEP Site Engineer interview?
AMIAND CONSULTING interview process usually has 3 rounds. The most common rounds in the AMIAND CONSULTING interview process are HR, Technical and One-on-one Round.
What are the top questions asked in AMIAND CONSULTING MEP Site Engineer interview?

Some of the top questions asked at the AMIAND CONSULTING MEP Site Engineer interview -

  1. What is the centre level and top level of...read more
  2. How much current be in lighting arres...read more
  3. How many types of PVC Pi...read more

Tell us how to improve this page.

AMIAND CONSULTING MEP Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

AMIAND CONSULTING MEP Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Project Engineer
28 salaries
unlock blur

₹2.3 L/yr - ₹7.3 L/yr

Horticulturist
9 salaries
unlock blur

₹3.8 L/yr - ₹5.5 L/yr

Project Engineer - Civil
8 salaries
unlock blur

₹3 L/yr - ₹3 L/yr

Document Controller
5 salaries
unlock blur

₹3 L/yr - ₹5.3 L/yr

HR Associate
4 salaries
unlock blur

₹4.5 L/yr - ₹5 L/yr

Explore more salaries
Compare AMIAND CONSULTING with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.0
Compare

R.V.R. PROJECTS

4.0
Compare

ABCI Infrastructures

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview