Filter interviews by
I applied via Walk-in
The question is about productivity increase methods including machin setting plan, rejection reduction, OEE monitoring, and Kaizen activities.
Develop a machin setting plan for HMC/VMC to optimize production efficiency.
Implement CTR activities to reduce cycle time and increase productivity.
Identify rejection causes and develop an action plan to reduce rejection rate.
Monitor OEE on a daily basis to identify areas for imp...
Daily monitoring of packing and action plan for production losses.
Implement a daily checklist for packing monitoring to ensure quality control.
Analyze production data to identify areas of losses and develop an action plan to address them.
Train staff on proper packing techniques and provide feedback on performance.
Regularly review and update the action plan to ensure effectiveness.
Collaborate with other departments to a...
I applied via Job Portal and was interviewed in Apr 2021. There was 1 interview round.
posted on 2 Jul 2022
I applied via LinkedIn and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
General knowledge, reasoning and english
posted on 14 Dec 2024
I applied via Recruitment Consulltant and was interviewed before Dec 2023. There was 1 interview round.
posted on 19 Dec 2022
I applied via Company Website and was interviewed in Nov 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Nov 2020. There was 1 interview round.
A die is a tool used to shape or cut materials. There are various types of dies used in different industries.
Dies are used in manufacturing to cut, shape, or form materials such as metal, plastic, and paper.
Some common types of dies include cutting dies, forming dies, and drawing dies.
Cutting dies are used to cut materials into specific shapes, while forming dies are used to bend or shape materials.
Drawing dies are use...
Tool room is a specialized area in a company where tools and equipment are designed, manufactured, and maintained.
Tool room is responsible for designing and manufacturing tools and equipment required for production.
It also maintains and repairs the tools and equipment to ensure their longevity and efficiency.
Tool room is equipped with specialized machinery and skilled personnel to carry out the tasks efficiently.
It pla...
Designing of a component before manufacturing helps in identifying and resolving potential issues, reducing costs and improving efficiency.
Designing helps in identifying potential issues and resolving them before manufacturing.
It helps in reducing costs by identifying and rectifying errors early on.
Designing also helps in improving efficiency by optimizing the component's design.
It ensures that the final product meets ...
posted on 31 Oct 2023
Based on below points-
1. Embedded Basics and Protocol- SPI, UART, CAN
2. C Programming
3. Projects
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
12
salaries
| ₹4.3 L/yr - ₹8 L/yr |
Quality Engineer
8
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
Senior Engineer
7
salaries
| ₹2.8 L/yr - ₹7 L/yr |
Junior Engineer
7
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Engineer
6
salaries
| ₹2.7 L/yr - ₹3.6 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra