Filter interviews by
I applied via Walk-in and was interviewed before May 2022. There were 3 interview rounds.
I applied via LinkedIn and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.
To improve productivity and control rejection, focus on process optimization, employee training, and quality control measures.
Analyze current production processes and identify areas for improvement
Implement lean manufacturing principles to eliminate waste and increase efficiency
Provide regular training and development opportunities for employees
Establish quality control measures to catch defects early and prevent rejec...
Allied Jb Friction interview questions for popular designations
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
Top trending discussions
posted on 26 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
posted on 3 May 2024
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.
Gemba is a Japanese term for 'the real place', power press is a machine used for stamping metal, tools used in power press include dies and punches, stamping process involves shaping metal by pressing it between dies.
Gemba is a Japanese term meaning 'the real place' or 'the actual place where work is done'
Power press is a machine used in metalworking to shape or cut metal using dies and punches
Tools used in power press...
Minimum resources should be utilized to achieve maximum output in production engineering.
Efficient use of resources is crucial for maximizing output
Optimizing processes and reducing waste can lead to increased productivity
Automation and technology can help streamline production and reduce resource usage
Continuous improvement and monitoring can identify areas for further optimization
Examples: Lean manufacturing, Six Sig
based on 14 interviews
Interview experience
based on 82 reviews
Rating in categories
Production Engineer
28
salaries
| ₹3 L/yr - ₹7.1 L/yr |
Engineer
24
salaries
| ₹2.6 L/yr - ₹5 L/yr |
Assistant Manager
13
salaries
| ₹6 L/yr - ₹10 L/yr |
Senior Production Engineer
8
salaries
| ₹4.8 L/yr - ₹8.4 L/yr |
Assistant Manager - Production
8
salaries
| ₹7 L/yr - ₹12 L/yr |
ZF Steering Gear
Caparo Engineering India
Marelli
Enco Engineers Combine