I applied via Walk-in and was interviewed before Apr 2023. There were 2 interview rounds.
To solve site situations, it is important to assess the problem, communicate effectively with team members, implement a solution, and monitor progress.
Assess the situation by identifying the root cause of the problem
Communicate effectively with team members to gather input and feedback
Implement a solution by creating an action plan and assigning tasks
Monitor progress by regularly checking in on the situation and adjust
Safety and de-snagging are important aspects of ensuring a safe and efficient work environment on construction sites.
Safety involves implementing measures to prevent accidents and injuries on site.
De-snagging refers to the process of removing obstacles or hazards that could potentially cause harm to workers.
Examples of safety measures include providing proper training, enforcing the use of personal protective equipment...
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Under and over reinforcement in beams and columns refers to the amount of reinforcement provided in relation to the required strength of the structure.
Under reinforcement occurs when the amount of reinforcement provided is less than what is required for the structure to carry the design loads.
Over reinforcement occurs when the amount of reinforcement provided is more than what is required for the structure, leading to ...
NDT tests of members are done to ensure structural integrity and safety.
NDT tests are non-destructive tests used to evaluate the properties of a material, component, or system without causing damage.
These tests help in detecting defects such as cracks, voids, and discontinuities that may compromise the structural integrity of the members.
By conducting NDT tests, engineers can ensure the safety and reliability of struct...
posted on 16 Aug 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Waterproofing in a toilet room is essential to prevent water damage and maintain structural integrity.
Waterproofing materials such as membranes, sealants, and coatings are used to protect surfaces from water penetration.
Proper installation of waterproofing systems is crucial to ensure long-term effectiveness.
Regular maintenance and inspections are necessary to identify and address any issues with waterproofing.
Examples...
The weight of 1 meter length depends on the material being measured.
The weight of 1 meter length can vary depending on the material, such as steel, aluminum, wood, etc.
To calculate the weight, you need to know the density of the material.
For example, the weight of 1 meter length of steel would be different from 1 meter length of wood.
The number of bricks in 1m^3 depends on the size of the bricks being used.
The number of bricks in 1m^3 will vary based on the size of the bricks.
Calculate the volume of a single brick and then divide 1m^3 by that volume to get the number of bricks.
For example, if a brick is 0.2m x 0.1m x 0.05m, its volume would be 0.001m^3. Therefore, 1m^3 would contain 1000 bricks.
posted on 23 Dec 2022
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
posted on 16 Nov 2021
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
Building construction procedure involves several stages from planning to completion.
Planning and design
Site preparation and foundation
Structural framework
Installation of utilities and systems
Interior and exterior finishing
Inspection and testing
Handover and maintenance
Civil works include construction, maintenance, and repair of infrastructure such as roads, bridges, buildings, and water systems.
Road construction
Bridge construction
Building construction
Water system construction
Maintenance of roads, bridges, buildings, and water systems
Repair of roads, bridges, buildings, and water systems
I applied via Naukri.com and was interviewed before Feb 2021. There were 4 interview rounds.
Civil site related work objective test
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
Assistant Manager
33
salaries
| ₹3.6 L/yr - ₹8 L/yr |
Deputy Manager
16
salaries
| ₹4.4 L/yr - ₹6.5 L/yr |
Senior Site Engineer
8
salaries
| ₹4.7 L/yr - ₹6 L/yr |
Senior Engineer
7
salaries
| ₹5 L/yr - ₹5.5 L/yr |
Senior Sales Executive
7
salaries
| ₹3.1 L/yr - ₹3.5 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company