posted on 10 Oct 2023
I applied via Newspaper Ad and was interviewed before Oct 2022. There were 2 interview rounds.
Yes, Hydrotest pressure stenciling is mandatory during pipe material inspection.
Hydrotest pressure stenciling is mandatory to ensure that the pipe has been tested to the required pressure.
It helps in identifying the maximum pressure the pipe can withstand.
Stenciling also provides important information for future maintenance and inspection purposes.
Failure to stencil the hydrotest pressure can lead to confusion and pote
Blasting & painting inspection procedures involve checking surface preparation, coating application, and quality control measures.
Inspect surface preparation for cleanliness and roughness before blasting.
Check blasting process for proper abrasive material, pressure, and coverage.
Inspect painting application for thickness, adhesion, and uniformity.
Verify quality control measures such as dry film thickness testing and ho...
Top trending discussions
posted on 26 Dec 2021
I appeared for an interview before Dec 2020.
I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.
Normal GD.Just brush up contemporary topics
posted on 11 May 2018
I applied via Company Website and was interviewed before May 2017. There were 2 interview rounds.
posted on 8 Jun 2017
I appeared for an interview before Jun 2016.
posted on 23 Dec 2019
I applied via Walk-in and was interviewed in Nov 2019. There was 1 interview round.
The main problem facing the project is the lack of clear communication between team members.
Lack of clear communication leading to misunderstandings and delays
Team members not sharing important information with each other
Difficulty in coordinating tasks and aligning goals
Possible solutions include regular team meetings, clear communication channels, and project management tools
posted on 3 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 6 interview rounds.
Nitrogen gas is commonly used for hot/live tapping in mechanical engineering.
Nitrogen gas is inert and non-reactive, making it safe to use in hot/live tapping processes.
It helps to create a protective atmosphere to prevent explosions or fires.
Nitrogen gas is readily available and cost-effective.
Other gases like argon or carbon dioxide can also be used depending on the specific requirements.
Various methods can be used for railway/road/river crossings depending on the location and other factors.
Bridges can be built over the crossing
Tunnels can be dug under the crossing
Level crossings can be used for roads
Flyovers can be constructed for roads
Ferries can be used for river crossings
Aqueducts can be built for waterways
Location, traffic volume, and safety considerations must be taken into account when choosing
The procedure for pipe lines welding while route and filling involves several steps.
Clean the area to be welded thoroughly
Tack weld the pipes together
Weld the root pass
Fill the remaining gap with weld metal
Perform post-weld heat treatment if required
Inspect the weld for defects
RT, UT, and magnetic partials are non-destructive testing methods used in engineering.
RT stands for Radiographic Testing and uses X-rays or gamma rays to inspect the internal structure of a material.
UT stands for Ultrasonic Testing and uses high-frequency sound waves to detect flaws or defects in a material.
Magnetic particle testing uses magnetic fields and iron particles to detect surface and slightly subsurface defec...
What IS API 5L
What is ASME B 16.5
What is ASME IX
Whatbis ASME B 31.4
Challenges in well testing include equipment malfunctions, environmental factors, and data interpretation.
Equipment malfunctions can lead to inaccurate results.
Environmental factors such as weather conditions or nearby activities can affect testing.
Data interpretation can be complex and require specialized knowledge.
Pressure build-up in the well can also pose challenges during testing.
posted on 13 Jun 2022
Hard very very hard test
India's annual oil production is approximately 700,000 barrels per day.
India is heavily dependent on oil imports, with domestic production meeting only about 20% of its total demand.
The country has several oil refineries, including the Jamnagar Refinery, which is the largest in the world.
India's oil production has been declining in recent years due to aging fields and lack of investment in exploration and production.
Th...
Some of the top questions asked at the AL-SUWAIDI INDUSTRIAL SERVICES Quality Assurance and Quality Control Mechanical Engineer interview -
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Mechanical Supervisor
11
salaries
| ₹8 L/yr - ₹15 L/yr |
Mechanical Engineer
8
salaries
| ₹8 L/yr - ₹15 L/yr |
Mechanical Maintenance Engineer
6
salaries
| ₹6 L/yr - ₹18 L/yr |
Safety Officer
6
salaries
| ₹5 L/yr - ₹12 L/yr |
Safety Supervisor
5
salaries
| ₹8.4 L/yr - ₹17 L/yr |
Indian Oil Corporation
Shell
Bharat Petroleum
Hindustan Petroleum