Upload Button Icon Add office photos

Filter interviews by

Aeroflex Industries Maintenance and Project Manager Interview Questions and Answers

Updated 21 May 2023

Aeroflex Industries Maintenance and Project Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Indeed and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Why do you wantnto join company? Where do you find yourself after 5 years?
  • Ans. 

    I want to join the company because of its strong reputation and growth opportunities. In 5 years, I see myself as a successful and respected leader within the organization.

    • Strong reputation of the company

    • Growth opportunities

    • Desire to become a successful leader

    • Respected within the organization

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Lots of questions asked related to hydraulics, pneumatics, utilities involved like boiler, chiller, air Compressor, transformer, LT& HT, breakers, etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - While attending interview be prepared with everything and salary must be a criteria asked for min 25 to 30% hike on existing.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About my past experiences
  • Q2. About project cost handling
  • Q3. How to complete project withing time span
  • Ans. 

    To complete a project within the time span, proper planning, delegation, and monitoring are essential.

    • Create a detailed project plan with clear timelines and milestones

    • Delegate tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members to ensure everyone is on the same page

    • Use project management tools to streamline proce

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Genral Questions like Salary negotiations location

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your experience and knowledge.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

The HR policy is very bad. The notice period there is 2 months for Assistant Manager and 3 months for Deputy Manager. If you do not serve the notice period, they deduct the gross salary and not the basic salary. And they do not give any full and final breakup certificate.
Because the company I was joining had bought my notice period. But Bharat Wire did not give me any full and final breakup certificate. Due to this, the company I joined did not give me the notice period money. My amount was about 83000 rupees. My money got lost because of Bharat Wire.
I emailed HR many times. But HR did not reply to my email.
If I talk specifically about the electrical department, there is rule of two people who talk like non-technical. And they do not have the manners to talk to seniors and juniors. Only those who do not know anything and who can bear their abuses are working there.
I would especially refuse to join this electrical department as long as these people are there. Even if you join there, within a week you will feel that we took a wrong decision. And you will be mentally stressed. Because you will be tortured so much. The electrical department has a completely toxic environment.
The canteen food is absolutely bad. Even dogs would not like such food.
Bharat Wire had a very good image in the market long ago. People wanted to join this company.
but today no one wants to join Bharat Wire whoever comes to know about it. That is why before joining, people connect with people on LinkedIn and take feedback, which is also right.

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical and server related questions
  • Q2. Current CTC related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - HR team support and guide
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Capacity planning, Manpower management, quality check parameters, Raw material mgmt., How to control welding defects, what different types of cutting process & how it works & is capacity, how to coordinate...
  • Q2. How to ensure Safety at shop floor, team building, how to resolve quality & material short supply issues, welding & painting process & their checking methods, TPM ,TQM etc.
  • Ans. 

    Ensuring safety, team building, resolving quality/material issues, managing welding/painting processes, implementing TPM/TQM at shop floor.

    • Implement regular safety training programs for shop floor employees.

    • Encourage team building activities to foster a positive work environment.

    • Establish clear communication channels to address quality and material shortage issues promptly.

    • Implement strict quality control measures in w...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Manpower handling, Daily shift planning & their output, coordination method with CFT member
Round 3 - One-on-one 

(2 Questions)

  • Q1. Capacity planning
  • Q2. How to handle working pressure
  • Ans. 

    To handle working pressure, I prioritize tasks, practice time management, communicate effectively, and take breaks when needed.

    • Prioritize tasks based on deadlines and importance

    • Practice time management techniques such as creating to-do lists and setting realistic goals

    • Communicate with colleagues and supervisors about workload and seek help if needed

    • Take short breaks to recharge and avoid burnout

    • Maintain a healthy work-

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Regrading yourself and regrading curr ctc and exp. Ctc
Round 2 - Technical 

(1 Question)

  • Q1. What is 7qc tool and Regrading mttr, mtbf, and some question releted to types of breakdown types of failure and how can reduce mttr.
  • Ans. 

    7QC tools are quality control tools used to identify and solve quality-related issues. MTTR stands for Mean Time To Repair, MTBF stands for Mean Time Between Failures.

    • 7QC tools include Pareto analysis, cause-and-effect diagram, scatter diagram, etc.

    • MTTR is the average time taken to repair a failed component or system.

    • MTBF is the average time between failures of a component or system.

    • Types of breakdowns can include mech...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Technical related to applied position
Round 2 - Technical 

(1 Question)

  • Q1. Technical & general discussion
Round 3 - HR 

(1 Question)

  • Q1. Salary & General background details

Interview Questions & Answers

Aamor Inox user image Anonymous

posted on 16 Apr 2021

I applied via LinkedIn and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Past experience
  • Q2. Experience in ERP implementation
  • Q3. Why want to leave?

Interview Preparation Tips

Interview preparation tips for other job seekers - Tel the facts with confidence. Wording must be cluster clear.

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Jun 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. For one year experience, for the Junior post,be prepared of basics regarding Structural Steel.

Interview Preparation Tips

Interview preparation tips for other job seekers - As simple as know the TOOL well, don't rush to complete the work, but detail the drawings with depth. The interview rounds were TOOL test, Technical round, Managerial round. All took place within 3 hours. All they want to know is what kind of projects you have been through and kind of experience through work. Try to explain as simple as possible.

Interview Questionnaire 

2 Questions

  • Q1. How can be define the specific material
  • Ans. 

    Specific material can be defined as a unique substance or product that possesses distinct characteristics or properties.

    • Specific material refers to a particular type of substance or product.

    • It is characterized by its unique properties, composition, or functionality.

    • Examples of specific materials include stainless steel, aluminum, plastic, wood, etc.

  • Answered by AI
  • Q2. Why should be relocation in this Covid Pried whereby more work is done online

Aeroflex Industries Interview FAQs

How many rounds are there in Aeroflex Industries Maintenance and Project Manager interview?
Aeroflex Industries interview process usually has 3 rounds. The most common rounds in the Aeroflex Industries interview process are Resume Shortlist, HR and Technical.

Tell us how to improve this page.

Aeroflex Industries Maintenance and Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Amit Metaliks Interview Questions
3.2
 • 14 Interviews
SAL STEEL Interview Questions
3.2
 • 6 Interviews
Aamor Inox Interview Questions
3.8
 • 6 Interviews
View all
Aeroflex Industries Maintenance and Project Manager Salary
based on 4 salaries
₹8.7 L/yr - ₹10.5 L/yr
33% less than the average Maintenance and Project Manager Salary in India
View more details

Aeroflex Industries Maintenance and Project Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

5.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Production Engineer
36 salaries
unlock blur

₹2 L/yr - ₹4.3 L/yr

Quality Engineer
32 salaries
unlock blur

₹2.4 L/yr - ₹4.3 L/yr

QA QC Engineer
16 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Senior Quality Engineer
11 salaries
unlock blur

₹3 L/yr - ₹4.5 L/yr

Production Supervisor
8 salaries
unlock blur

₹2 L/yr - ₹3.3 L/yr

Explore more salaries
Compare Aeroflex Industries with

Bharat Wire Ropes

3.7
Compare

Steel Infra Solutions

3.8
Compare

Peekay Steel Castings

4.0
Compare

Mahindra Accelo

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview