Filter interviews by
Clear (1)
Top trending discussions
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
Refrigeration cycle is a thermodynamic cycle used in refrigerators and air conditioning systems to transfer heat from a low temperature reservoir to a high temperature reservoir.
Consists of four main components: compressor, condenser, expansion valve, and evaporator
Refrigerant is compressed in the compressor, then condensed in the condenser, expanded in the expansion valve, and evaporated in the evaporator
Heat is absor...
Refrigeration theory involves the transfer of heat from a low temperature region to a high temperature region using a refrigerant.
Refrigeration is based on the principles of thermodynamics, specifically the second law which states that heat naturally flows from a higher temperature to a lower temperature.
The refrigeration cycle consists of four main components: compressor, condenser, expansion valve, and evaporator.
The...
I applied via Company Website and was interviewed in Feb 2022. There were 4 interview rounds.
posted on 19 Sep 2023
I applied via Referral
posted on 16 Oct 2024
The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
posted on 2 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
posted on 18 Jan 2025
I applied via Naukri.com and was interviewed in Jul 2024. There were 3 interview rounds.
The candidate should have a strong understanding of manufacturing and planning processes.
Knowledge of lean manufacturing principles
Experience with production scheduling and capacity planning
Understanding of supply chain management
Ability to optimize processes for efficiency and cost-effectiveness
I plan to continue advancing my skills in engineering through further education and certifications, as well as taking on more leadership roles within the field.
Pursuing a master's degree in engineering to deepen my knowledge and expertise
Obtaining professional certifications such as PMP or Six Sigma to enhance my skill set
Seeking opportunities to lead projects and teams to develop my leadership abilities
Staying updated...
Ensuring retention by creating a supportive work environment for employees and their families.
Offering flexible work hours and remote work options to accommodate family needs
Providing comprehensive health insurance and wellness programs for employees and their families
Organizing family-friendly events and activities to promote work-life balance
Offering competitive salaries and benefits to attract and retain top talent
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Senior Engineer
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Area Sales Engineer
18
salaries
| ₹0 L/yr - ₹0 L/yr |
ESAB
Lincoln Electric
Fronius
Panasonic