I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
Slump test is a concrete consistency test to measure the workability of fresh concrete.
Slump test is performed by filling a mold with fresh concrete, then removing the mold and measuring the amount of slump or settlement.
The slump value indicates the workability of the concrete - higher slump means more workable concrete.
Different types of slumps include true slump, shear slump, and collapse slump.
Slump test is importa...
Compressive strength of concrete is a measure of its ability to withstand loads or stress.
Compressive strength is typically measured in pounds per square inch (psi) or megapascals (MPa).
Higher compressive strength indicates a more durable and strong concrete mix.
Factors affecting compressive strength include water-cement ratio, curing conditions, and aggregate quality.
Sieve analysis is a method used to determine the particle size distribution of aggregates.
Sieve analysis involves passing a sample of aggregate through a series of sieves with progressively smaller openings.
The amount of material retained on each sieve is weighed and compared to the total sample weight to determine the percentage passing through each sieve.
The results of sieve analysis are used to classify aggregates f...
Top trending discussions
I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.
I applied via Campus Placement
Simple aptitude questions and logical reasoning
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
I applied via Referral and was interviewed in Dec 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.
GTG operation involves multiple generators working together to share the load and ensure continuous power supply.
GTG stands for Gas Turbine Generator
In GTG operation, multiple generators are synchronized to work together
Load sharing ensures that the power demand is distributed evenly among the generators
This helps in maintaining a stable power supply and prevents overloading of any single generator
I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.
Power station design involves the planning and construction of facilities that generate electricity.
Design includes selection of appropriate technology and equipment
Consideration of environmental impact and safety measures
Layout and construction of buildings and infrastructure
Integration with power grid and transmission systems
Examples include thermal power plants, hydroelectric power plants, and wind farms
Efficiency of a power station is the ratio of output power to input power.
Efficiency can be improved by using advanced technologies and equipment.
Regular maintenance and cleaning of equipment can also improve efficiency.
Efficiency can be affected by factors such as fuel quality, weather conditions, and demand for electricity.
For example, a power station using combined cycle technology can achieve an efficiency of up to...
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 17 Jan 2024
I applied via Campus Placement and was interviewed before Jan 2023. There were 4 interview rounds.
Basic mathematics, English and aptitude
Current affairs and topics related to current events
based on 1 interview
Interview experience
Assistant Manager
271
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
239
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
129
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
100
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
81
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Group
Reliance Industries
Vedanta Resources
JSW Group