Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Adani Enterprises Team. If you also belong to the team, you can get access from here

Adani Enterprises Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Adani Enterprises Deputy Engineer Interview Questions and Answers

Updated 26 May 2024

Adani Enterprises Deputy Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Slump Test in detail
  • Ans. 

    Slump test is a concrete consistency test to measure the workability of fresh concrete.

    • Slump test is performed by filling a mold with fresh concrete, then removing the mold and measuring the amount of slump or settlement.

    • The slump value indicates the workability of the concrete - higher slump means more workable concrete.

    • Different types of slumps include true slump, shear slump, and collapse slump.

    • Slump test is importa...

  • Answered by AI
  • Q2. Concrete mix design
  • Q3. Compressive strength of concrete
  • Ans. 

    Compressive strength of concrete is a measure of its ability to withstand loads or stress.

    • Compressive strength is typically measured in pounds per square inch (psi) or megapascals (MPa).

    • Higher compressive strength indicates a more durable and strong concrete mix.

    • Factors affecting compressive strength include water-cement ratio, curing conditions, and aggregate quality.

  • Answered by AI
  • Q4. Sieve analysis of aggregate
  • Ans. 

    Sieve analysis is a method used to determine the particle size distribution of aggregates.

    • Sieve analysis involves passing a sample of aggregate through a series of sieves with progressively smaller openings.

    • The amount of material retained on each sieve is weighed and compared to the total sample weight to determine the percentage passing through each sieve.

    • The results of sieve analysis are used to classify aggregates f...

  • Answered by AI

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Whats your long terms goal towards organization.

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

Simple aptitude questions and logical reasoning

Round 2 - Technical 

(1 Question)

  • Q1. Mechanical engineering
Round 3 - HR 

(3 Questions)

  • Q1. General qualifications details
  • Q2. Tell me about yourself
  • Q3. Salary expectations
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Motor replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old motor remove and new motor replace and bolts nut tightening s...
  • Q2. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and blumber block top cover open and old slue Barring remove and new slue...
  • Q3. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tig...
  • Q4. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old v -scraper remove and new v-scraper replace and bolts nut...
  • Q5. Barring greasing work and safety first and all ppes sure and paper work and walked away clean and fresh and Greasing gun and all pulley checking and savings Greasing work and sure and paper work cancelled
  • Q6. Discharge Chute replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old discharge chute remove and new discharge chute repl...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement

I applied via Referral and was interviewed in Dec 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. They ask about introduction, my work related questions and last about safety.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clear during interview and don't be over smart. If doesn't know then simply says no.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain GTG Operation and load sharing
  • Ans. 

    GTG operation involves multiple generators working together to share the load and ensure continuous power supply.

    • GTG stands for Gas Turbine Generator

    • In GTG operation, multiple generators are synchronized to work together

    • Load sharing ensures that the power demand is distributed evenly among the generators

    • This helps in maintaining a stable power supply and prevents overloading of any single generator

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Details of power station design
  • Ans. 

    Power station design involves the planning and construction of facilities that generate electricity.

    • Design includes selection of appropriate technology and equipment

    • Consideration of environmental impact and safety measures

    • Layout and construction of buildings and infrastructure

    • Integration with power grid and transmission systems

    • Examples include thermal power plants, hydroelectric power plants, and wind farms

  • Answered by AI
  • Q2. Efficiency of Power station
  • Ans. 

    Efficiency of a power station is the ratio of output power to input power.

    • Efficiency can be improved by using advanced technologies and equipment.

    • Regular maintenance and cleaning of equipment can also improve efficiency.

    • Efficiency can be affected by factors such as fuel quality, weather conditions, and demand for electricity.

    • For example, a power station using combined cycle technology can achieve an efficiency of up to...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Stick to the basiscs and don't show overconfidence. Details overall knowledge must have to crack the interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Ask about myself Experience
  • Q2. Ask about technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself and your working knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Windows Server, Firewalll, ERP, Routing, Hardware & Networking Basic, IT Infrastructure Management
  • Q2. Team Leading, Team Management, Management
Round 3 - Technical 

(3 Questions)

  • Q1. General Introduction
  • Q2. Latest Technologies
  • Q3. Trending Technologies
Round 4 - HR 

(2 Questions)

  • Q1. General Introduction
  • Q2. Package negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident, Be Positive
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jan 2023. There were 4 interview rounds.

Round 1 - Aptitude Test 

Basic mathematics, English and aptitude

Round 2 - Group Discussion 

Current affairs and topics related to current events

Round 3 - Technical 

(1 Question)

  • Q1. Question related to your particular engineering background
Round 4 - HR 

(1 Question)

  • Q1. Question related to location, policies
Contribute & help others!
anonymous
You can choose to be anonymous

Adani Enterprises Interview FAQs

How many rounds are there in Adani Enterprises Deputy Engineer interview?
Adani Enterprises interview process usually has 1 rounds. The most common rounds in the Adani Enterprises interview process are Technical.
What are the top questions asked in Adani Enterprises Deputy Engineer interview?

Some of the top questions asked at the Adani Enterprises Deputy Engineer interview -

  1. compressive strength of concr...read more
  2. sieve analysis of aggreg...read more
  3. Slump Test in det...read more

Recently Viewed

INTERVIEWS

Adani Enterprises

No Interviews

INTERVIEWS

Actalent Services

No Interviews

INTERVIEWS

Sify Technologies

No Interviews

INTERVIEWS

Sify Technologies

No Interviews

INTERVIEWS

Adani Enterprises

No Interviews

INTERVIEWS

Zoho

No Interviews

INTERVIEWS

Sify Technologies

No Interviews

INTERVIEWS

Adani Enterprises

50 top interview questions

DESIGNATION

INTERVIEWS

Sify Technologies

90 top interview questions

Tell us how to improve this page.

Adani Enterprises Deputy Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

ITC Interview Questions
3.9
 • 545 Interviews
Tata Group Interview Questions
4.2
 • 358 Interviews
JSW Group Interview Questions
3.9
 • 109 Interviews
Metso Interview Questions
4.3
 • 65 Interviews
Coal India Interview Questions
4.0
 • 48 Interviews
View all
Assistant Manager
271 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
239 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Associate Manager
129 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Officer
100 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
81 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Adani Enterprises with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Vedanta Resources

3.8
Compare

JSW Group

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview