The question is asking about how you handle conflicts with other parties in a safety officer role.
I always prioritize open communication and collaboration to resolve conflicts peacefully.
I have experience mediating disputes between team members to ensure a safe working environment.
I believe in finding common ground and working towards a mutually beneficial solution.
I am skilled at de-escalating tense situations and pro
The closure code form is used to document the reasons for closing a safety issue or incident.
The closure code form should include options for different closure reasons such as resolved, mitigated, not applicable, etc.
It should also have space for additional comments or explanations for the closure reason.
The closure code form should be filled out accurately and completely to ensure proper documentation of the closure p
Top trending discussions
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 19 Oct 2023
I applied via Company Website and was interviewed before May 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2021. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
based on 1 interview
Interview experience
Assistant Manager
186
salaries
| ₹3.2 L/yr - ₹10.4 L/yr |
Senior Engineer
124
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Engineer
111
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Deputy Manager
87
salaries
| ₹6.4 L/yr - ₹13 L/yr |
Production Engineer
82
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Thermax Limited
ABB
Isgec Heavy Engineering
Kirloskar Oil Engines