Upload Button Icon Add office photos

Filter interviews by

Acetech Heavy Fab Production Planning Control Engineer Interview Questions and Answers

Updated 17 May 2021

Acetech Heavy Fab Production Planning Control Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All Questions Related to Production Planning And Control Activities

Interview Preparation Tips

Interview preparation tips for other job seekers - This Interview was a technical one and lasted for about 30 Mins only via Google Meet. The interviewer wanted to test both my communication and industrial experience. But most of the interview questions were asked about Production Planning and Control Activities. Please be prepare.

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 7 tools of production planning
  • Ans. 

    The 7 tools of production planning are Gantt charts, PERT charts, flowcharts, histograms, Pareto charts, scatter diagrams, and control charts.

    • Gantt charts help in scheduling and tracking progress

    • PERT charts help in identifying critical path and dependencies

    • Flowcharts help in visualizing the process flow

    • Histograms help in analyzing frequency distribution

    • Pareto charts help in identifying the most significant factors

    • Scatt...

  • Answered by AI
  • Q2. Difference between planning and process planning
  • Ans. 

    Planning is the process of deciding what to do and how to do it, while process planning is the detailed planning of specific processes.

    • Planning involves setting goals, objectives, and strategies to achieve them.

    • Process planning involves breaking down the overall plan into specific steps and determining the resources needed for each step.

    • Planning is more high-level and strategic, while process planning is more detailed ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please refer industrial engineering

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 826 Interviews
Siemens Interview Questions
4.1
 • 427 Interviews
Thermax Limited Interview Questions
4.2
 • 238 Interviews
Cummins Interview Questions
4.3
 • 230 Interviews
Blue Star Interview Questions
4.1
 • 154 Interviews
Voltas Interview Questions
4.0
 • 126 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
View all
Acetech Heavy Fab Production Planning Control Engineer Salary
based on 5 salaries
₹1.9 L/yr - ₹3.6 L/yr
24% less than the average Production Planning Control Engineer Salary in India
View more details
Senior Engineer
26 salaries
unlock blur

₹3.3 L/yr - ₹6 L/yr

Quality Engineer
20 salaries
unlock blur

₹2.5 L/yr - ₹4.2 L/yr

Engineer
12 salaries
unlock blur

₹2.4 L/yr - ₹4 L/yr

Assistant Manager
9 salaries
unlock blur

₹5 L/yr - ₹7.5 L/yr

Production Engineer
9 salaries
unlock blur

₹2.1 L/yr - ₹3.5 L/yr

Explore more salaries
Compare Acetech Heavy Fab with

Tata Steel

4.1
Compare

Larsen & Toubro Limited

4.0
Compare

BHEL

4.1
Compare

Thermax Limited

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview