i
ABM Knowledgeware
Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
Master data is the core data that is essential to the operations of a business or organization.
Master data is used to support business processes and decision-making.
It includes data about customers, products, suppliers, and employees.
Master data is typically stored in a centralized database or system.
It is often shared across different departments and systems within an organization.
Examples of master data include produ...
Preventive maintenance refers to the regular and planned maintenance of equipment to prevent breakdowns and prolong its lifespan.
Preventive maintenance involves routine inspections, cleaning, lubrication, and replacement of parts as needed.
It is based on a schedule or usage-based triggers.
Examples include changing the oil in a car every 5,000 miles or inspecting a machine every month.
Preventive maintenance helps reduce...
Types of maintenance include corrective, preventive, predictive, and shutdown maintenance.
Corrective maintenance is performed after a failure has occurred.
Preventive maintenance is performed to prevent failures from occurring.
Predictive maintenance is performed based on data analysis to predict when maintenance is needed.
Shutdown maintenance is performed during a planned shutdown of equipment.
Other types of maintenance...
Preventive maintenance can be categorized into time-based, usage-based, and condition-based.
Time-based maintenance involves performing maintenance at specific intervals, such as every 6 months.
Usage-based maintenance involves performing maintenance after a certain amount of usage, such as every 10,000 miles.
Condition-based maintenance involves performing maintenance based on the condition of the equipment, such as when...
A single cycle plan is a maintenance plan that is executed only once.
Single cycle plans are used for one-time maintenance tasks.
They are created in the maintenance plan and scheduling work center in SAP PM.
Examples of single cycle plans include equipment installation, repair, or replacement.
Once the plan is executed, it is automatically set to completed status.
Single cycle plans can be used in conjunction with other ma...
I applied via Shine and was interviewed in Sep 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Linux is an open-source operating system based on Unix. Kernel is the core of an operating system, while OS includes kernel and other components.
Linux is an open-source operating system that is based on Unix
Kernel is the core component of an operating system, responsible for managing hardware resources
Operating System (OS) includes the kernel along with other components like user interface, utilities, and applications
L...
ABM Knowledgeware interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There was 1 interview round.
Linux is an open-source operating system, and cmd is a command-line interface for user management.
Linux is an open-source operating system known for its stability, security, and flexibility.
Cmd (Command Prompt) is a command-line interface in Windows for executing commands.
In Linux, user management involves creating, modifying, and deleting user accounts.
Commands like 'useradd', 'usermod', and 'userdel' are used for use...
Get interview-ready with Top ABM Knowledgeware Interview Questions
BRD, SRS, UML, DFD, and AGILE are all important concepts in the field of business analysis.
BRD stands for Business Requirements Document, which outlines the business solution for a project.
SRS stands for Software Requirements Specification, which details the software solution for a project.
UML stands for Unified Modeling Language, which is used to visually represent the design of a system.
DFD stands for Data Flow Diagr...
I applied via Referral and was interviewed in May 2023. There were 4 interview rounds.
I think it was 1 hours dureation along with G.K, English Grammer and etc questions 15 years ago.
A group discussion was on the perticuler topic, mostly half an hours.
Top trending discussions
The duration of ABM Knowledgeware interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 19 interviews
Interview experience
based on 337 reviews
Rating in categories
Mumbai,
Navi Mumbai
+10-2 Yrs
₹ 0.5-3 LPA
7-12 Yrs
Not Disclosed
Noida,
New Delhi
+16-11 Yrs
₹ 12-20 LPA
Software Developer
47
salaries
| ₹2 L/yr - ₹8 L/yr |
Associate SAP Consultant
47
salaries
| ₹2 L/yr - ₹7.2 L/yr |
Associate SAP MM Consultant
41
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Project Manager
35
salaries
| ₹5.5 L/yr - ₹13.6 L/yr |
Business Analyst
33
salaries
| ₹4 L/yr - ₹12 L/yr |
3i Infotech
JK Tech
Kellogg Brown and Root
CS Tech AI