Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
I would highlight the pen's sleek design, smooth writing experience, and durability.
Start by showcasing the pen's elegant design and comfortable grip.
Highlight the smooth ink flow and precision of the pen for a superior writing experience.
Emphasize the durability of the pen, ensuring it will last a long time and provide value for money.
By highlighting the unique features and benefits of the pen, creating a sense of exclusivity and luxury, and offering personalized customization options.
Highlight the premium quality materials used in the pen
Emphasize the unique design and craftsmanship
Create a sense of exclusivity and luxury associated with owning the pen
Offer personalized customization options such as engraving or special packaging
Provide excellent c
Top trending discussions
To improve sales, focus on understanding customer needs, training sales team, utilizing data analytics, and implementing effective marketing strategies.
Understand customer needs and tailor products/services accordingly
Train sales team on effective selling techniques and product knowledge
Utilize data analytics to identify trends and target potential customers
Implement effective marketing strategies to reach and engage w
posted on 26 Jan 2021
I applied via Company Website and was interviewed before Jan 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
The covered area of the project is approximately 10,000 square feet.
The covered area includes the indoor space of the project.
It does not include any outdoor space or open areas.
The exact covered area may vary depending on the project.
In this particular project, the covered area is approximately 10,000 square feet.
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
I was interviewed before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Recruitment Consulltant and was interviewed in Apr 2021. There were 2 interview rounds.
The daily progress rate of welders varies based on factors such as experience, type of welding, and complexity of the project.
Welders with more experience tend to have a higher daily progress rate.
The type of welding being done can also affect the daily progress rate. For example, TIG welding may take longer than MIG welding.
The complexity of the project can also impact the daily progress rate. A simple welding project...
Project delays can be caused by various constraints.
Project delays can be caused by resource constraints such as lack of manpower or budget constraints.
Technical constraints such as unexpected technical issues or changes in requirements can also cause delays.
External constraints such as weather conditions or delays in receiving materials can also impact project timelines.
Effective project management can help mitigate t
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
based on 1 interview
Interview experience
Software Developer
231
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
221
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
161
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
116
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure