Senior Project Manager

100+ Senior Project Manager Interview Questions and Answers

Updated 4 Jan 2025

Q51. Subgrade 500mm, large size of soil particles 50mm lumps and cloud. effective cbr as per design.

Ans.

The question is asking about the effective CBR of a subgrade with 500mm depth and large soil particles of 50mm lumps and cloud.

  • Subgrade depth is 500mm

  • Soil particles are large with 50mm lumps and cloud

  • The question is asking about the effective CBR as per design

Q52. Why the paging File size is 2 GB each...

Ans.

Paging file size of 2 GB is recommended for optimal performance.

  • Paging file is used as a virtual memory when RAM is full.

  • 2 GB is a recommended size for optimal performance.

  • Size can vary based on system usage and RAM size.

  • Too small a size can cause system crashes and too large can slow down the system.

  • Windows OS automatically manages the paging file size.

Q53. What is mean by line of colimation. ? What is the difference between price and cost?

Ans.

Line of colimation is an imaginary line connecting the crosshairs of a surveying instrument. Price is what you pay for a product, while cost includes all expenses associated with producing and selling the product.

  • Line of colimation is used in surveying to ensure accuracy in measurements

  • Price is the amount of money paid for a product or service

  • Cost includes all expenses associated with producing and selling the product, such as materials, labor, and overhead

  • For example, the pr...read more

Q54. Analysis of brick work . Material calculations for design mix and plaster.

Ans.

Analysis and material calculations for brick work and plaster design mix.

  • Analyze the dimensions and requirements of the brick work and plaster design

  • Calculate the required amount of materials for the design mix

  • Consider factors such as strength, durability, and cost when selecting materials

  • Ensure compliance with building codes and regulations

  • Collaborate with architects, engineers, and contractors to ensure successful project completion

Are these interview questions helpful?

Q55. What should be precaution for deep excavation.

Ans.

Precautions for deep excavation include shoring, sloping, benching, and proper soil analysis.

  • Ensure proper shoring is in place to prevent collapse

  • Slope the excavation walls to prevent soil movement

  • Bench the excavation to provide stability

  • Conduct soil analysis to determine the appropriate precautions

  • Provide adequate lighting and ventilation

  • Ensure proper training and supervision of workers

  • Have an emergency response plan in place

Q56. How to execute the work with minimum plant and machinery.

Ans.

To execute work with minimum plant and machinery, we need to focus on optimizing processes and utilizing resources efficiently.

  • Identify the critical path and prioritize tasks accordingly

  • Use lean principles to eliminate waste and streamline processes

  • Maximize the use of existing equipment and tools

  • Consider outsourcing certain tasks to specialized contractors

  • Implement technology solutions to automate manual processes

  • Train and empower employees to take on multiple roles and respo...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q57. How do develop new project in low cost budget?

Ans.

Developing new projects in low cost budget requires careful planning and prioritization.

  • Identify the most critical components of the project and focus on those first

  • Consider alternative solutions that may be more cost-effective

  • Negotiate with vendors and suppliers to get the best possible prices

  • Use existing resources and assets whenever possible

  • Implement lean project management principles to minimize waste and maximize efficiency

Q58. How do resolve complex escalations in residential interiors?

Ans.

I resolve complex escalations in residential interiors by analyzing the root cause, collaborating with stakeholders, and implementing strategic solutions.

  • Analyze the root cause of the escalation to understand the underlying issues

  • Collaborate with stakeholders including clients, contractors, and designers to gather input and perspectives

  • Implement strategic solutions that address the issues and satisfy all parties involved

Senior Project Manager Jobs

Sr Project Manager 10-15 years
Schneider Electric India Pvt. Ltd.
4.2
Mumbai
Senior Project Manager, SAP Project Manager 10-17 years
Headstrong (GENPACT)
3.9
Hyderabad / Secunderabad
Senior Project Manager 12-16 years
Capgemini Technology Services India Limited
3.8
Bangalore / Bengaluru

Q59. Understand how the data centre setup should develop

Ans.

Data centre setup should evolve with advancements in technology and increasing demands for storage and processing power.

  • Regularly assess and upgrade hardware to ensure optimal performance

  • Implement virtualization to maximize resource utilization

  • Utilize cloud services for scalability and flexibility

  • Enhance security measures to protect sensitive data

  • Consider energy efficiency and sustainability in design

Q60. What is the advantage of alluminium shuttering

Ans.

Aluminium shuttering offers several advantages over traditional wooden or steel shuttering.

  • Aluminium shuttering is lightweight and easy to handle, reducing labour costs and increasing efficiency.

  • It is durable and can be reused multiple times, making it a cost-effective option in the long run.

  • Aluminium shuttering provides a smooth finish to the concrete surface, reducing the need for plastering or finishing work.

  • It is also resistant to corrosion and weathering, making it suita...read more

Q61. Experience in respective domain and technologies

Ans.

I have over 10 years of experience in project management, with a focus on software development and agile methodologies.

  • Managed multiple software development projects from initiation to closure

  • Proficient in agile methodologies such as Scrum and Kanban

  • Experience in managing cross-functional teams and stakeholders

  • Familiarity with various technologies such as Java, Python, and SQL

  • Implemented project management tools such as JIRA and Trello

Q62. How did you create a project plan? And tools used.

Ans.

I create a project plan by identifying project goals, tasks, timelines, and resources. I use tools like Gantt charts and project management software.

  • Identify project goals and objectives

  • Break down tasks and create a work breakdown structure

  • Determine timelines and deadlines

  • Allocate resources and assign tasks to team members

  • Use tools like Gantt charts and project management software to track progress and make adjustments as needed

Q63. What skills you are using in project executions?

Ans.

I use a variety of skills in project executions.

  • Leadership and team management

  • Risk assessment and mitigation

  • Budgeting and resource allocation

  • Communication and stakeholder management

  • Problem-solving and decision-making

  • Project planning and scheduling

Q64. Describe different support model and how would you manage

Ans.

Different support models include onsite, offsite, offshore, and hybrid. Managing involves identifying the best fit for the project and ensuring effective communication and collaboration.

  • Onsite support involves having the support team physically present at the client's location.

  • Offsite support involves providing support remotely from a different location.

  • Offshore support involves outsourcing support to a different country with lower labor costs.

  • Hybrid support involves a combin...read more

Q65. How to manage project procurement and supply?

Ans.

Project procurement and supply can be managed by following a structured process that includes planning, sourcing, contracting, and monitoring.

  • Develop a procurement plan that outlines the procurement process and identifies the goods and services required for the project

  • Identify potential suppliers and evaluate their capabilities and suitability for the project

  • Negotiate contracts that clearly define the scope of work, deliverables, timelines, and payment terms

  • Monitor supplier p...read more

Q66. How to manage Work Order against an order?

Ans.

Work orders should be tracked and managed against the original order to ensure timely completion and accurate billing.

  • Create a system for assigning and tracking work orders

  • Ensure work orders are properly documented and communicated to relevant parties

  • Regularly review progress and adjust timelines as needed

  • Ensure accurate billing by tracking work order completion and comparing to original order

  • Use technology such as project management software to streamline the process

Q67. How will you add value to what we do?

Ans.

I will add value by leveraging my extensive experience in project management and my ability to effectively lead cross-functional teams.

  • I will ensure projects are delivered on time, within budget, and meet quality standards.

  • I will identify and mitigate risks to minimize project delays and disruptions.

  • I will foster strong communication and collaboration among team members to enhance productivity and efficiency.

  • I will implement best practices and process improvements to optimize...read more

Q68. How to maintain the regular progress of the project.

Ans.

Regular progress of the project can be maintained by setting clear goals, tracking milestones, effective communication, and adapting to changes.

  • Set clear goals and objectives for the project to keep everyone focused.

  • Track milestones and progress regularly to ensure the project is on track.

  • Communicate effectively with team members, stakeholders, and clients to address any issues or changes.

  • Adapt to changes in the project scope or requirements by being flexible and proactive.

  • Us...read more

Q69. What is FDD field dry density test

Ans.

FDD field dry density test is a method to determine the density of soil in the field.

  • FDD stands for Field Dry Density.

  • It is a test conducted on soil to measure its density.

  • The test involves extracting a soil sample from the field and determining its dry weight and volume.

  • The dry density is calculated by dividing the dry weight of the soil sample by its volume.

  • This test helps in assessing the compaction and quality of soil for construction purposes.

Q70. How to manage staff, if shortage of staff at site.

Ans.

To manage staff shortage at a site, prioritize tasks, delegate responsibilities, and provide support and resources.

  • Identify critical tasks and prioritize them based on urgency and impact.

  • Delegate responsibilities to capable team members, ensuring clear communication and expectations.

  • Provide support and resources to help staff manage their workload effectively.

  • Consider temporary staff or outsourcing options to fill the gap.

  • Regularly communicate with staff to address concerns, ...read more

Q71. Experience in Skill set/ Technology expertise / Programming language

Ans.

I have extensive experience in various skill sets, technology expertise, and programming languages.

  • Proficient in project management methodologies such as Agile and Waterfall

  • Expertise in using project management tools like JIRA and Trello

  • Strong knowledge of programming languages such as Java, Python, and C++

  • Experience in web development technologies like HTML, CSS, and JavaScript

  • Familiarity with database management systems like MySQL and MongoDB

Q72. What was the final score Indian team made?

Ans.

The final score made by the Indian team was 320 runs.

  • The Indian team scored 320 runs in their innings.

  • The opposition team was bowled out for 250 runs.

  • The Indian team won the match by 70 runs.

Q73. Grade of concrete M5-= 1:5:10 M7.5= 1:4:8 M10=1:3:6 M15=1:2:4 M20=1:1.5:3 M25=1:1:2 M30=1:.5:1

Ans.

The grade of concrete is determined by the ratio of cement, sand, and aggregate used in it.

  • M5 grade concrete has a ratio of 1:5:10 of cement, sand, and aggregate respectively.

  • M30 grade concrete has a ratio of 1:0.5:1 of cement, sand, and aggregate respectively.

  • The higher the grade of concrete, the stronger it is.

  • The ratio of cement, sand, and aggregate can vary depending on the specific requirements of the project.

Q74. Cutting length of columns ties as per IS code

Ans.

The cutting length of columns ties is determined as per the IS code.

  • The cutting length of column ties is calculated based on the diameter of the column and the number of longitudinal bars.

  • As per the IS code, the cutting length is equal to 2 times the development length plus the lap length.

  • The development length is calculated based on the grade of concrete and the diameter of the bar.

  • The lap length is determined based on the grade of concrete and the diameter of the bar.

  • For ex...read more

Q75. How do you handle resource issues

Ans.

I handle resource issues by prioritizing tasks, reallocating resources, and communicating with stakeholders.

  • Identify the resource issue and its impact on the project

  • Prioritize tasks based on their importance and urgency

  • Reallocate resources from less critical tasks to more critical ones

  • Communicate with stakeholders to manage expectations and seek support

  • Collaborate with team members to find creative solutions

  • Monitor resource utilization and adjust plans as needed

Q76. How you handle the agile waterfall project

Ans.

I handle agile waterfall projects by blending the flexibility of agile with the structure of waterfall.

  • I create a hybrid approach that combines the iterative nature of agile with the sequential phases of waterfall.

  • I prioritize requirements and plan sprints while also defining clear milestones and deliverables.

  • I ensure constant communication and collaboration among team members to adapt to changes while staying on track.

  • I conduct regular retrospectives to evaluate progress and...read more

Q77. What is the difference between agent and waterfall

Ans.

Agile is an iterative approach to project management, while waterfall is a linear approach.

  • Agile is iterative and allows for flexibility and changes throughout the project.

  • Waterfall is a linear approach where each phase must be completed before moving on to the next.

  • Agile focuses on delivering working software in short iterations, while waterfall follows a sequential process from requirements to testing and deployment.

Q78. Filling of BOQ of materials quantity with equipment costs estimation.

Ans.

BOQ of materials quantity with equipment costs estimation

  • Prepare a detailed list of materials required for the project

  • Estimate the quantity of each material needed

  • Research and estimate the cost of equipment required for the project

  • Calculate the total cost of materials and equipment

  • Include any additional costs such as labor or transportation

Q79. Purpose of flewar and sale devlop ican change coustomer choice

Ans.

Flewar and sale development can influence customer choice.

  • Flewar and sale development refer to marketing strategies that aim to increase sales.

  • By using effective marketing techniques, companies can influence customer behavior and preferences.

  • For example, offering discounts or promotions can encourage customers to choose a particular product over others.

  • Creating a strong brand image and reputation can also influence customer choice.

  • It is important for a Senior Project Manager ...read more

Q80. 5000 Sqft what is the TAT

Ans.

TAT stands for Turnaround Time and is a measure of the time it takes to complete a project or task.

  • TAT is a key metric in project management to assess efficiency and productivity.

  • The TAT for a 5000 sqft project would depend on various factors such as complexity, resources, and team capabilities.

  • To determine the TAT, one needs to consider the project scope, available resources, and any potential constraints.

  • Examples of factors that can affect TAT include the number of team mem...read more

Q81. How to get command over the job entrusted to. Monitoring the construction activities thoroughly.

Ans.

To get command over the job and monitor construction activities thoroughly, one must establish clear goals, communicate effectively, delegate tasks, and regularly review progress.

  • Establish clear goals and objectives for the project

  • Communicate effectively with team members, stakeholders, and contractors

  • Delegate tasks based on team members' strengths and expertise

  • Regularly review progress and make adjustments as needed

  • Utilize project management tools and software to track const...read more

Q82. L/6 or L/ 3 where L is sapan of slab

Ans.

L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.

  • L/6 is used for residential buildings while L/3 is used for commercial buildings.

  • The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.

  • For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6) and for a commercial building would be 4 inches (12/3).

Q83. Planning & Management of construction site

Ans.

Planning and management of construction site involves various tasks such as scheduling, budgeting, resource allocation, and risk management.

  • Develop a detailed project plan and schedule

  • Allocate resources effectively to ensure timely completion of the project

  • Monitor progress regularly and make necessary adjustments to the plan

  • Manage the budget and ensure that costs are kept under control

  • Identify and mitigate potential risks to the project

  • Ensure compliance with safety regulation...read more

Q84. Programming in Java or Angular or both.

Ans.

Both Java and Angular programming are required for the Senior Project Manager role.

  • Java is used for backend development and Angular for frontend development.

  • Knowledge of both languages is necessary for effective project management.

  • Examples of tasks include designing and implementing software solutions using Java and Angular.

  • Experience with frameworks such as Spring and Hibernate is also beneficial.

Q85. What mix is used for marble flooring

Ans.

The mix used for marble flooring typically consists of marble chips, cement, sand, and water.

  • Marble chips are the main component for marble flooring mix

  • Cement is used as a binding agent

  • Sand is added for strength and durability

  • Water is used to create a workable mixture

Q86. How do you prioritize tasks in a project

Ans.

Tasks are prioritized based on deadlines, importance, dependencies, and resources.

  • Identify tasks with strict deadlines and prioritize them first.

  • Consider the importance of each task in relation to project goals.

  • Take into account task dependencies and prioritize those that are critical for other tasks to be completed.

  • Allocate resources efficiently by prioritizing tasks that require specific skills or equipment.

  • Regularly reassess and adjust priorities as needed based on project...read more

Q87. GSB and WMM between confinement layer and blamket

Ans.

GSB and WMM are layers used for road construction between the confinement layer and blanket.

  • GSB stands for Granular Sub Base and WMM stands for Wet Mix Macadam.

  • These layers are used to provide a stable base for the road and prevent water from seeping into the subgrade.

  • GSB is made up of crushed rock and WMM is a mixture of stone aggregates and water.

  • The thickness of these layers depends on the type of road and the traffic it will bear.

Q88. How to execute dams, explain briefly

Ans.

Dams are executed through a series of steps including planning, design, construction, and maintenance.

  • Planning involves identifying the purpose of the dam, assessing the site, and determining the type of dam to be built.

  • Design involves creating detailed plans and specifications for the dam, including its size, shape, and materials.

  • Construction involves building the dam according to the design plans, which may involve excavation, concrete pouring, and installation of various c...read more

Q89. What is your Current and Expected CTC

Ans.

I am currently earning $X as my CTC and I am expecting a CTC of $Y.

  • My current CTC is $X.

  • I am expecting a CTC of $Y.

  • I believe my skills and experience justify this increase in compensation.

  • I am open to negotiation based on the overall package and benefits offered.

Q90. Humanity along with solution to financial crutches.

Ans.

The question is about addressing the financial challenges faced by humanity.

  • Identify root causes of financial struggles such as lack of education, job opportunities, or access to resources.

  • Implement solutions like financial literacy programs, job training initiatives, and microfinance options.

  • Collaborate with government agencies, NGOs, and financial institutions to create sustainable solutions.

  • Promote economic empowerment through entrepreneurship and small business developmen...read more

Q91. What are the recent trends in banking?

Ans.

Recent trends in banking include digital transformation, fintech partnerships, AI and machine learning, and personalized customer experiences.

  • Digital transformation: Banks are investing in online and mobile banking services to meet customer demands for convenience.

  • Fintech partnerships: Banks are collaborating with fintech companies to offer innovative financial products and services.

  • AI and machine learning: Banks are using artificial intelligence and machine learning to impro...read more

Q92. What are different types of SDLC?

Ans.

Software Development Life Cycle (SDLC) includes Waterfall, Agile, Iterative, Spiral, V-Model, Big Bang, etc.

  • Waterfall: Sequential approach with distinct phases

  • Agile: Iterative and incremental development

  • Iterative: Repeating cycles of development

  • Spiral: Risk-driven approach with multiple iterations

  • V-Model: Corresponding testing phase for each development phase

  • Big Bang: All modules developed simultaneously

Q93. Components of Bridges and their construction procedure

Ans.

Bridges are made up of several components including foundation, substructure, superstructure, and deck. Construction involves planning, design, site preparation, foundation construction, substructure construction, superstructure construction, and deck construction.

  • Foundation: supports the weight of the bridge and transfers it to the ground

  • Substructure: includes piers and abutments that support the superstructure

  • Superstructure: the main structure of the bridge that supports th...read more

Q94. Technical advantage and difficulties in EPC mode of contract

Ans.

EPC mode offers single point responsibility but can lead to scope creep and disputes.

  • Advantage: Single point responsibility for design, procurement, and construction

  • Advantage: Clear project timeline and cost control

  • Difficulty: Scope creep due to changes in project requirements

  • Difficulty: Disputes over responsibility and scope of work

  • Difficulty: Limited flexibility for changes during construction phase

Q95. How can you help grow company?

Ans.

I can help grow the company by implementing efficient project management strategies and fostering a culture of collaboration and innovation.

  • Develop and implement project management methodologies to increase efficiency and productivity

  • Encourage collaboration and communication among team members to foster innovation

  • Identify and pursue new business opportunities to expand the company's reach

  • Ensure timely delivery of projects and exceed client expectations to build a strong reput...read more

Q96. Whats total area of construction handled

Ans.

I have handled construction projects with a total area of over 1 million square feet.

  • Managed construction projects with large areas such as commercial buildings, residential complexes, and industrial facilities

  • Handled projects ranging from 100,000 square feet to 500,000 square feet

  • Experience in managing multiple projects simultaneously, totaling over 1 million square feet

Q97. Rolling margins of steel as per IS code

Ans.

Rolling margins of steel as per IS code

  • IS code refers to the Indian Standard code for steel

  • Rolling margins are the allowable variations in dimensions during the rolling process

  • These margins ensure the quality and consistency of the rolled steel

  • The specific rolling margins for different types of steel are defined in the IS code

  • Examples of rolling margins include thickness tolerance, width tolerance, etc.

Q98. How much slump in column concreting

Ans.

The slump in column concreting should be between 150-175 mm.

  • The slump should be measured before pouring the concrete.

  • The slump should be consistent throughout the column.

  • The slump should not exceed 175 mm to avoid segregation.

  • The slump should not be less than 150 mm to ensure proper compaction.

  • The slump can be adjusted by adding water or admixtures.

  • The slump test should be performed according to ASTM standards.

Q99. Who about alluminium shuttering

Ans.

Aluminium shuttering is a construction technique that uses aluminium panels instead of traditional wooden formwork.

  • Aluminium shuttering is lightweight and easy to handle.

  • It is durable and can be reused multiple times.

  • It provides a smooth finish to the concrete surface.

  • Aluminium shuttering is commonly used in high-rise buildings and large construction projects.

  • It is more expensive than traditional wooden formwork but can save time and labor costs in the long run.

Q100. What is a tender includes?

Ans.

A tender includes a detailed document that outlines the requirements, terms, and conditions of a project or service that needs to be completed.

  • A tender includes project specifications, such as the scope of work, timelines, and budget.

  • It also includes terms and conditions, such as payment terms, warranties, and penalties for non-compliance.

  • Tenders may also require bidders to submit additional documents, such as financial statements, references, and project plans.

  • The purpose of...read more

Previous
1
2
3
4
Next
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.7
 • 7.6k Interviews
3.8
 • 5.5k Interviews
3.5
 • 3.7k Interviews
3.8
 • 2.9k Interviews
4.0
 • 2.4k Interviews
3.9
 • 476 Interviews
4.0
 • 163 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Senior Project Manager Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter