Filter interviews by
I applied via Walk-in and was interviewed before Dec 2022. There were 5 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
I was interviewed in Feb 2024.
MFG process stands for Manufacturing process, which refers to the steps involved in producing a product from raw materials.
MFG process includes steps such as design, prototyping, production, quality control, and packaging.
Examples of MFG processes include injection molding for plastic products, CNC machining for metal parts, and assembly line production for electronics.
Efficient MFG processes can lead to cost savings,
Load cell verification in tank involves testing and calibrating the load cells used to measure the weight of the tank contents.
Load cell verification ensures accurate measurement of the weight of the tank contents.
It involves applying known weights to the tank and comparing the readings from the load cells.
Calibration adjustments may be made based on the verification results to ensure accurate measurements.
Regular load...
CIP stands for Clean-in-Place and SIP stands for Sterilize-in-Place. They are processes used in industries like food and pharmaceuticals to clean and sterilize equipment.
CIP is a method of cleaning the interior surfaces of pipes, vessels, process equipment, filters, and associated fittings without disassembly.
SIP is a method of sterilizing equipment and piping systems in place with steam or hot water at temperatures ty...
Pre activity refers to the preparation or warm-up exercises done before engaging in physical or mental tasks.
Pre activity helps to prepare the body and mind for the upcoming task
It can include stretching, light exercises, mental focus techniques, etc.
Examples: warming up before a workout, doing breathing exercises before a presentation
Post activity refers to the actions or tasks that are completed after a main event or activity.
Post activity includes tasks such as debriefing, documentation, and follow-up actions.
It is important to review and analyze the outcomes of the main activity during post activity.
Examples of post activity in a project setting include finalizing project reports, conducting lessons learned sessions, and closing out contracts.
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.
SAP T-Code Batch D is used for processing batch input sessions in SAP.
SAP T-Code Batch D is used to process batch input sessions in SAP.
It allows users to input large volumes of data into SAP at once.
Users can create, edit, and execute batch input sessions using T-Code Batch D.
Batch input sessions can be scheduled to run at specific times to automate data entry tasks.
I applied via Walk-in and was interviewed before Dec 2023. There were 2 interview rounds.
Pio generates BPR based on code number and batch number.
Pio uses a unique code number and batch number to generate BPR.
The BPR is generated automatically by Pio's software.
The BPR includes information such as product details, manufacturing date, and batch number.
Pio's BPR generation process ensures accuracy and compliance with industry standards.
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
Assistant Manager
33
salaries
| ₹7 L/yr - ₹13 L/yr |
Medical Representative
30
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Officer
27
salaries
| ₹2.7 L/yr - ₹4.8 L/yr |
Area Business Manager
18
salaries
| ₹4.2 L/yr - ₹11 L/yr |
Operator
11
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Sun Pharmaceutical Industries
Cipla
DRJ & CO
Biocon Limited