Filter interviews by
I appeared for an interview in Mar 2024.
ESD stands for Electrostatic Discharge.
ESD is the sudden flow of electricity between two electrically charged objects caused by contact, an electrical short, or dielectric breakdown.
It can damage electronic components and integrated circuits.
Preventive measures include using ESD-safe workstations, wearing ESD wrist straps, and using ESD mats.
Examples of ESD-sensitive devices include microchips, transistors, and circuit
5 s is a short form for 5 seconds.
5 s = 5 seconds
Commonly used in abbreviating time intervals
Example: 'Wait for 5 s before pressing the button'
3 R stands for Reduce, Reuse, Recycle - a mantra for sustainable living and environmental conservation.
Reduce: Minimize waste by using less resources.
Reuse: Find new ways to use items instead of throwing them away.
Recycle: Convert waste into reusable material to reduce the need for new resources.
Do kazin is a term used in Bluetooth development to refer to a specific protocol or feature.
Do kazin may refer to a specific function or method in Bluetooth development.
It could be a protocol used for data transmission between devices.
Do kazin might be a feature related to security or encryption in Bluetooth communication.
Quality is the measure of excellence or superiority of something.
Quality is subjective and can vary depending on individual preferences and standards.
It can be measured through factors such as durability, reliability, performance, and customer satisfaction.
Examples of quality products include high-end electronics, luxury cars, and premium clothing brands.
I appeared for an interview in Dec 2016.
I will communicate effectively, follow instructions, seek feedback, and collaborate with my supervisor.
Communicate regularly with supervisor to provide updates on progress and ask for clarification when needed
Follow instructions carefully and ask for help if unsure about a task
Seek feedback on my work to improve and grow professionally
Collaborate with supervisor and team members to achieve project goals
Provide suggesti
I applied via Naukri.com and was interviewed before Mar 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Oct 2019. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Oct 2022. There were 3 interview rounds.
I applied via Indeed and was interviewed in Nov 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before May 2022. There were 4 interview rounds.
I appeared for an interview in Aug 2024.
Six Sigma is a data-driven methodology for improving processes by reducing defects and variation.
Six Sigma aims to achieve near-perfect quality by identifying and eliminating causes of defects or errors.
It uses statistical tools and techniques to measure and analyze process performance.
The goal of Six Sigma is to reduce variation and improve efficiency, ultimately leading to cost savings and customer satisfaction.
Compa...
Implemented a kaizen to streamline production process, reducing lead time by 20%.
Identified bottlenecks in the production process
Implemented visual management tools to track progress
Trained team members on new processes and best practices
Absenteeism and attrition can be controlled through various strategies such as improving work culture, offering competitive benefits, and providing opportunities for growth.
Improve work culture by promoting work-life balance and creating a positive work environment.
Offer competitive benefits such as health insurance, flexible work hours, and performance bonuses.
Provide opportunities for growth and development through t...
The OE Calculation Formula is used to determine the efficiency of a process or system.
OE (Overall Equipment) = (Operating Time - Downtime) / Operating Time
Operating Time is the total time the equipment is available for production.
Downtime is the total time the equipment is not available for production.
OE value ranges from 0 to 1, with 1 indicating perfect efficiency.
Example: OE = (500 hours - 50 hours) / 500 hours = 0.
based on 1 interview
Interview experience
Quality Engineer
103
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Engineer
57
salaries
| ₹2.3 L/yr - ₹4.6 L/yr |
Associate Engineer
45
salaries
| ₹2.4 L/yr - ₹3.7 L/yr |
Senior Engineer
33
salaries
| ₹4 L/yr - ₹6 L/yr |
Production Engineer
29
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Mitsubishi Electric India
Delta Electronics
Livguard
Ukb Electronics