Upload Button Icon Add office photos

Wood Group

Compare button icon Compare button icon Compare

Filter interviews by

Wood Group Senior Instrument Engineer Interview Questions and Answers for Experienced

Updated 13 Dec 2022

Wood Group Senior Instrument Engineer Interview Experiences for Experienced

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Technical questions regarding sizing of instruments
  • Q2. Interview questions regarding SPI
  • Q3. Regarding team keading
Round 3 - Technical 

(1 Question)

  • Q1. In depth discussion regarding their requirements and whether i am suitable to their requirements or not

Interview Preparation Tips

Interview preparation tips for other job seekers - For any instrumentation engineer common skill sets required are SPI, sizing tools like instrucalc or convel. Without these no 1 is considering CV even. Sharpen your skills.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your self. About casting yard. About Methodology of casting of different structures. About site progress planning and time cycle of progress. This process is for 30-40 minutes.
Round 3 - HR 

(1 Question)

  • Q1. Details of my Education and experience. Salary negotiation and finalization of joining.

Interview Preparation Tips

Topics to prepare for AECOM Senior Engineer interview:
  • Civil Construction
  • IS Code
  • Your expertise area
Interview preparation tips for other job seekers - Prepare before going to attend an interview on all subject not only in your expertise area.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Whate are different bus bar schemes?
  • Ans. 

    Bus bar schemes are different ways of connecting bus bars in power systems.

    • Single bus bar scheme

    • Double bus bar scheme

    • Main and transfer bus bar scheme

    • Ring bus bar scheme

    • Breaker and a half scheme

    • Mesh bus bar scheme

  • Answered by AI
  • Q2. What are the equipment sequence for any line bay?
  • Ans. 

    The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.

    • The circuit breaker is the first equipment in the sequence.

    • Next comes the isolator switch.

    • After that, the earth switch is operated.

    • Then the line disconnector is opened.

    • Finally, the transformer is disconnected from the line.

    • The sequence is reversed when the line bay is put back into service.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What you want to leave your current organization?
  • Q2. Are you comfortable to relocate to another city?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be prepare about possible questions and be confident while giving interview
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What types of HVAC systems
  • Ans. 

    There are several types of HVAC systems, including central, split, packaged, ductless, and geothermal.

    • Central HVAC systems use ducts to distribute air throughout a building

    • Split systems have separate indoor and outdoor units

    • Packaged systems have all components in one unit

    • Ductless systems use individual units in each room

    • Geothermal systems use the earth's temperature to heat and cool a building

  • Answered by AI
  • Q2. Design and functions of HVAC system.
  • Ans. 

    HVAC system is designed to control temperature, humidity, and air quality in a building.

    • HVAC stands for Heating, Ventilation, and Air Conditioning.

    • It includes components such as air handlers, ductwork, filters, and thermostats.

    • The system works by circulating air through the building and adjusting temperature and humidity levels.

    • It also helps to remove pollutants and maintain air quality.

    • Examples of HVAC systems include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Make you next great hire on LinkedIn.
Post a job for free.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Wms of all activities
  • Ans. 

    The question is asking for the Wms of all activities.

    • Wms stands for Work Measurement System, which is a method used to measure the time and effort required for different activities.

    • The answer should provide the Wms values for each activity mentioned.

    • Example: Activity 1 - 5.2 Wms, Activity 2 - 3.8 Wms, Activity 3 - 6.1 Wms

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Salary expectations

I applied via Naukri.com and was interviewed in Sep 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Technical and Aptitude Questions

Round 3 - Technical 

(2 Questions)

  • Q1. Work done in Previous organisation
  • Q2. Quality Assurance and Control Process
Round 4 - HR 

(1 Question)

  • Q1. What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be practical

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge

Wood Group Interview FAQs

How many rounds are there in Wood Group Senior Instrument Engineer interview for experienced candidates?
Wood Group interview process for experienced candidates usually has 3 rounds. The most common rounds in the Wood Group interview process for experienced candidates are Technical and Resume Shortlist.
How to prepare for Wood Group Senior Instrument Engineer interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Wood Group. The most common topics and skills that interviewers at Wood Group expect are 3D Modeling, CCTV Monitoring, EPC, Engineering Management and Hospital.
What are the top questions asked in Wood Group Senior Instrument Engineer interview for experienced candidates?

Some of the top questions asked at the Wood Group Senior Instrument Engineer interview for experienced candidates -

  1. Technical questions regarding sizing of instrume...read more
  2. Interview questions regarding ...read more
  3. Regarding team kead...read more

Tell us how to improve this page.

Wood Group Senior Instrument Engineer Interview Process for Experienced

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
View all
Wood Group Senior Instrument Engineer Salary
based on 11 salaries
₹12.8 L/yr - ₹21.6 L/yr
80% more than the average Senior Instrument Engineer Salary in India
View more details

Wood Group Senior Instrument Engineer Reviews and Ratings

based on 3 reviews

3.3/5

Rating in categories

2.4

Skill development

4.8

Work-life balance

4.4

Salary

4.6

Job security

2.5

Company culture

4.1

Promotions

3.1

Work satisfaction

Explore 3 Reviews and Ratings
Accountant
225 salaries
unlock blur

₹5 L/yr - ₹9.4 L/yr

Process Engineer
115 salaries
unlock blur

₹4.8 L/yr - ₹11.2 L/yr

Billing Accountant
103 salaries
unlock blur

₹5.5 L/yr - ₹9.5 L/yr

Accounts Payable Accountant
70 salaries
unlock blur

₹5 L/yr - ₹8.1 L/yr

Payroll Administrator
64 salaries
unlock blur

₹5.3 L/yr - ₹13 L/yr

Explore more salaries
Compare Wood Group with

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview