I applied via Job Fair and was interviewed before Dec 2023. There was 1 interview round.
Stress is the force applied to a material, while strain is the resulting deformation or change in shape.
Stress is the force applied per unit area on a material, measured in units like Pascals or pounds per square inch.
Strain is the resulting deformation or change in shape of the material, typically expressed as a percentage of the original size.
Stress and strain are related by the material's modulus of elasticity, whic...
I applied via Campus Placement and was interviewed before Dec 2021. There were 4 interview rounds.
Knowledge about your subject , maths, reasoning , logical question
I applied via Campus Placement and was interviewed in Nov 2023. There was 1 interview round.
I applied via Referral and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
IGBT is a power semiconductor device used in electronic devices. SMPS is a power supply unit that converts AC to DC.
IGBT stands for Insulated Gate Bipolar Transistor
It is used in high power applications such as motor drives, inverters, and power supplies
Static test involves measuring the resistance and voltage drop across the IGBT
SMPS stands for Switched-Mode Power Supply
It converts AC voltage to DC voltage using a swi...
Flip-flop is a digital circuit that can store one bit of information. A server is a computer program or device that provides functionality to other programs or devices.
Flip-flop is a basic building block of digital electronics
It can be used to store a single bit of information
There are different types of flip-flops such as D, JK, SR, and T flip-flops
A server is a computer program or device that provides services to oth...
I applied via Naukri.com and was interviewed before Dec 2020. There were 4 interview rounds.
Heat load calculation is done by determining the amount of heat energy required to maintain a desired temperature in a given space.
Determine the size of the space in square feet
Determine the desired temperature for the space
Determine the insulation value of the walls, ceiling, and floor
Determine the number of windows and doors and their insulation value
Calculate the heat loss through the walls, ceiling, floor, windows,...
FCU stands for Fan Coil Unit. There are two types of FCU - Horizontal and Vertical.
Horizontal FCU: mounted on the ceiling or floor, air is discharged horizontally
Vertical FCU: mounted on the wall, air is discharged vertically
Other types include cassette FCU, concealed FCU, and floor-standing FCU
FCUs are used for heating, cooling, and ventilation in buildings
VRV system is a type of HVAC system that uses a single outdoor unit to control multiple indoor units.
VRV stands for Variable Refrigerant Volume
It uses a refrigerant to transfer heat between the indoor and outdoor units
Each indoor unit can be controlled independently for temperature and air flow
It is energy efficient and can save on utility costs
Examples of VRV system brands include Daikin, Mitsubishi, and LG
I applied via Approached by Company and was interviewed in Dec 2024. There were 2 interview rounds.
I have a Bachelor's degree in Civil Engineering and 5 years of experience in project management and construction.
Graduated with a Bachelor's degree in Civil Engineering
5 years of experience in project management and construction
Managed multiple construction projects from planning to completion
Led a team of engineers and contractors to ensure project deadlines were met
I am interested in this role because of my passion for project management and engineering.
Passion for project management and engineering
Excited about the opportunity to work on challenging projects
Desire to contribute to the success of the team
I have 5 years of experience in project management, leading cross-functional teams to successful project completion.
Led multiple projects from initiation to completion, ensuring adherence to timelines and budgets
Managed stakeholder expectations and communicated project updates regularly
Utilized project management tools such as Gantt charts and Kanban boards to track progress
Resolved conflicts within teams and facilitat
I address conflict in teamwork by actively listening, seeking compromise, and promoting open communication.
Actively listen to all parties involved to understand their perspectives
Seek compromise by finding common ground and brainstorming solutions together
Promote open communication by encouraging team members to express their concerns and feedback
Mediate discussions to ensure all voices are heard and work towards a res...
based on 1 interview
Interview experience
Piping Designer
16
salaries
| ₹4.8 L/yr - ₹9.2 L/yr |
Process Engineer
10
salaries
| ₹7.2 L/yr - ₹10 L/yr |
Engineer
7
salaries
| ₹5 L/yr - ₹15 L/yr |
Senior Piping Designer
7
salaries
| ₹8 L/yr - ₹15 L/yr |
Senior Engineer
6
salaries
| ₹15 L/yr - ₹20.8 L/yr |
Cargill
AECOM
Daikin
Reckitt Benckiser