Filter interviews by
I applied via Company Website and was interviewed before Mar 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
Gas trains and its components are used in industrial applications to control the flow and pressure of gases.
Gas trains are assemblies of valves, regulators, and other components used to control the flow and pressure of gases in industrial processes.
Components of a gas train include safety shut-off valves, pressure regulators, pressure gauges, and filters.
Gas trains are commonly used in applications such as boilers, fur...
I applied via Approached by Company and was interviewed before Jul 2020. There were 4 interview rounds.
Wesman Engineering interview questions for popular designations
I applied via Approached by Company and was interviewed before May 2022. There were 4 interview rounds.
VFD stands for Variable Frequency Drive. It is an electronic device that controls the speed of an AC motor.
VFD is used to save energy and reduce wear and tear on motors.
It works by adjusting the frequency of the electrical supply to the motor.
Achievements in previous company: Reduced energy consumption by 20% through VFD installation.
Control valve is a device used to regulate the flow of fluid or gas in a system.
It wor...
I have worked with both start up and load burners. The model of the flame scanner of Honeywell make that I worked with is XYZ. The flame scanner must be installed at a distance of ABC from the furnace wall.
I have experience working with both start up and load burners.
The model of the flame scanner that I worked with was Honeywell's XYZ.
The flame scanner must be installed at a distance of ABC from the furnace wall where
To become a successful Assistant Management Executive (Engineering) and eventually progress to a higher management role.
To gain experience and knowledge in the field of engineering management
To develop leadership and communication skills
To contribute to the growth and success of the company
To pursue professional development opportunities such as certifications and training programs
To build a strong network of industry ...
I applied via Naukri.com and was interviewed before Sep 2022. There were 2 interview rounds.
Heat output for a boiler can be calculated using the formula: Heat output = Fuel consumption x Fuel heating value
Calculate the fuel consumption of the boiler in terms of mass or volume
Determine the heating value of the fuel being used
Multiply the fuel consumption by the heating value to get the heat output
Consider efficiency factors if applicable
Example: If a boiler consumes 1000 kg of coal with a heating value of 30,0
I applied via Approached by Company and was interviewed in Aug 2017. There were 5 interview rounds.
posted on 20 Feb 2015
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I was interviewed before Sep 2016.
based on 5 interviews
Interview experience
based on 47 reviews
Rating in categories
Assistant Management Executive
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Management Executive
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales & Service Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Sales and Service Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Thermax Limited
Alfa Laval
BHEL
Larsen & Toubro Limited