Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
posted on 15 Nov 2020
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
The duration and machinery requirement for dumping and compacting one lakh cum of soil.
The duration depends on the capacity of the machinery and the number of machines used.
The type of soil and the site conditions also affect the duration.
On average, it takes around 30-45 days to complete the task.
The machinery required includes excavators, bulldozers, dump trucks, and compactors.
Minor bridges are usually shorter and have a lower weight capacity than major bridges.
Major bridges are typically longer and have a higher weight capacity than minor bridges.
Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.
Major bridges may require more maintenance and have a higher construction cost than minor bridges.
Examples of major bridges i...
posted on 14 Jul 2021
based on 1 interview
Interview experience
Assistant Manager
84
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
70
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Enterprises
Larsen & Toubro Limited
Tata Projects
GMR Group