Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
Marketing old company was a traditional marketing firm that focused on traditional advertising methods.
The company primarily used print media such as newspapers and magazines for advertising.
They also relied on television and radio commercials to reach a wider audience.
Direct mail campaigns were a common strategy employed by the company.
They organized events and trade shows to promote their products or services.
The com...
I applied via Naukri.com and was interviewed in Mar 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jun 2021. There were 4 interview rounds.
Basic electrical topics. wind energy, solar
Your past experience and project repots
Yes about of renewability energy
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
Critical path is the longest path in a project schedule, representing the shortest time in which the project can be completed.
Critical path is the sequence of tasks that determines the total duration of a project.
It is the longest path through the project network diagram, with zero float or slack.
Any delay in tasks on the critical path will directly impact the project's completion date.
Identifying the critical path hel...
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
DFIG generator stands for Doubly Fed Induction Generator, used in wind turbines for variable speed operation.
DFIG generator is a type of induction generator used in wind turbines.
It allows for variable speed operation, improving efficiency and power quality.
DFIG generator has two sets of windings - stator windings connected directly to the grid and rotor windings connected through a converter.
The converter controls the...
Synchronous generators produce power at a constant frequency, while asynchronous generators do not require synchronization with the grid frequency.
Synchronous generators have a fixed magnetic field and produce power at a constant frequency.
Asynchronous generators do not need to be synchronized with the grid frequency and can operate at variable speeds.
Synchronous generators are typically used in power plants, while asy...
posted on 17 Feb 2024
I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.
Clearances in the station refer to the process of ensuring that all necessary approvals and permissions are obtained before proceeding with a task or project.
Clearances may include safety clearances, security clearances, and regulatory clearances.
Examples of clearances in a station could be obtaining permission from the fire department before conducting a fire drill, or ensuring that all employees have completed backgr...
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
Using PSCAD to create a grid-tied wind power plant
Create a new project in PSCAD
Design the wind turbine system with appropriate parameters
Connect the wind turbine system to the grid
Simulate the system to analyze its performance
Optimize the design for maximum efficiency
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
5-8 Yrs
₹ 5.5-8.5 LPA
Assistant Manager
202
salaries
| ₹5 L/yr - ₹12 L/yr |
Quality Engineer
145
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Senior Engineer
119
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Production Engineer
105
salaries
| ₹1.6 L/yr - ₹4.9 L/yr |
Maintenance Engineer
72
salaries
| ₹1.6 L/yr - ₹4.8 L/yr |
Adani Power
ReNew
Adani Green Energy
Vestas