Upload Button Icon Add office photos

Filter interviews by

Vishvaraj Environment Executive Accountant Interview Questions and Answers

Updated 30 May 2022

Vishvaraj Environment Executive Accountant Interview Experiences

1 interview found

Round 1 - One-on-one 

(1 Question)

  • Q1. Job description and knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared and good negotiate for salary

Interview questions from similar companies

I was interviewed before Aug 2016.

Interview Questionnaire 

1 Question

  • Q1. Service tax reverse mechanism TDs rates and Balance sheet in consolidate format

Interview Preparation Tips

Round: Resume Shortlist
Experience: They called me for interview

Round: HR Interview
Experience: It was nyc

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Give the Some Quantitative sums and Related to basic accounts

Round 2 - Behavioral 

(1 Question)

  • Q1. Golden Rules of accounts, knowledge about income tax rules, Basic Excel formula
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Project F&A job related.
Round 3 - HR 

(1 Question)

  • Q1. Job posting place

Interview Preparation Tips

Interview preparation tips for other job seekers - Job posting place is diffrance place

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake

    Interview Questionnaire 

    1 Question

    • Q1. They asked about previous experience and they asked me what’ are piling activities you followed let me explain that’s it

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Share about your knowledge of work experience with confidently

    Interview Questionnaire 

    2 Questions

    • Q1. Causes of accident
    • Ans. 

      Accidents can be caused by various factors such as human error, equipment failure, environmental conditions, and lack of safety measures.

      • Human error: Mistakes or negligence by individuals involved in the project.

      • Equipment failure: Malfunction or breakdown of machinery or tools.

      • Environmental conditions: Adverse weather, natural disasters, or other external factors.

      • Lack of safety measures: Insufficient safety protocols o...

    • Answered by AI
    • Q2. 1. Unsufficient maintenance of machinery.
    • Ans. 

      Insufficient maintenance of machinery can lead to breakdowns and production delays.

      • Regular maintenance schedules should be established and followed.

      • Proper training should be provided to operators and maintenance personnel.

      • Use of predictive maintenance techniques can help identify potential issues before they become major problems.

      • Examples: oil changes, lubrication, cleaning, calibration, inspections.

      • Failure to maintain...

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident only
    Interview experience
    5
    Excellent
    Difficulty level
    Moderate
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected

    I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

    Round 1 - One-on-one 

    (1 Question)

    • Q1. Civil Structural work
    Round 2 - One-on-one 

    (1 Question)

    • Q1. Any interviews questions
    Interview experience
    5
    Excellent
    Difficulty level
    Easy
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected
    Round 1 - Technical 

    (2 Questions)

    • Q1. Billing Site work
    • Q2. Billing and Site work
    Interview experience
    5
    Excellent
    Difficulty level
    Moderate
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected

    I was interviewed before Jan 2024.

    Round 1 - Technical 

    (2 Questions)

    • Q1. What is the pressure rating for steam pipes?
    • Ans. 

      The pressure rating for steam pipes varies depending on the material and size of the pipe.

      • Pressure rating for steam pipes is typically determined by the material and size of the pipe.

      • Common pressure ratings for steam pipes range from 150 psi to 2500 psi.

      • It is important to consult industry standards and guidelines for specific pressure ratings based on the application and conditions.

    • Answered by AI
    • Q2. What did you do in your project? And asked in depth questions including construction and mechanical engineering

    Vishvaraj Environment Interview FAQs

    How many rounds are there in Vishvaraj Environment Executive Accountant interview?
    Vishvaraj Environment interview process usually has 1 rounds. The most common rounds in the Vishvaraj Environment interview process are One-on-one Round.

    Tell us how to improve this page.

    Vishvaraj Environment Executive Accountant Salary
    based on 4 salaries
    ₹3.6 L/yr - ₹4.6 L/yr
    19% more than the average Executive Accountant Salary in India
    View more details

    Vishvaraj Environment Executive Accountant Reviews and Ratings

    based on 3 reviews

    1.5/5

    Rating in categories

    1.5

    Skill development

    1.5

    Work-life balance

    1.5

    Salary

    1.5

    Job security

    1.5

    Company culture

    1.5

    Promotions

    1.5

    Work satisfaction

    Explore 3 Reviews and Ratings
    Assistant Manager/Manager -(Technical)
    3 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Administration Manager
    3 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Assistant Manager - Production
    3 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Incident Manager
    3 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Explore more salaries
    Compare Vishvaraj Environment with

    Larsen & Toubro Limited

    4.0
    Compare

    GMR Group

    4.0
    Compare

    Hindustan Construction Company

    4.2
    Compare

    IL&FS Engineering and Construction

    4.4
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview