i
Vishvaraj Environment
Filter interviews by
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
Top trending discussions
Costing MIS Budget involves analyzing and managing costs to ensure efficient use of resources.
Analyze historical data to identify cost trends and patterns
Monitor budget variances and investigate reasons for deviations
Implement cost-saving measures to improve efficiency
Collaborate with different departments to gather cost information
Prepare reports and presentations for senior management
posted on 31 Jul 2024
I am a dedicated and results-driven professional with strong leadership skills and a passion for driving team success.
Strong leadership skills
Results-driven
Passionate about driving team success
My ambition is to continuously grow and develop my leadership skills while making a positive impact on the organization and its employees.
Continuously seek opportunities for professional development and growth
Lead by example and inspire others to reach their full potential
Strive to make a positive impact on the organization through effective leadership and decision-making
I have 10 years of experience in senior management roles.
10 years of experience in senior management
Proven track record of successful leadership
Strong strategic planning and decision-making skills
I have experience working in extreme load situations, managing priorities and resources effectively.
Prioritize tasks based on urgency and importance
Delegate responsibilities to team members to ensure tasks are completed efficiently
Stay calm under pressure and make quick decisions
Communicate effectively with team members and stakeholders to manage expectations
Adapt quickly to changing circumstances and reevaluate priori
posted on 24 May 2024
I applied via Recruitment Consulltant and was interviewed before May 2023. There was 1 interview round.
Wastewater technology
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
I appeared for an interview before Feb 2021.
I applied via Referral and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
Pumps and aerators are used to move fluids and gases respectively.
Pumps work by creating a pressure difference to move fluids from one place to another.
Aerators introduce air into liquids to increase oxygen levels and promote biological processes.
Types of pumps include centrifugal, positive displacement, and jet pumps.
Types of aerators include surface aerators, diffused aerators, and mechanical aerators.
posted on 28 Sep 2021
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
Marketing is about creating demand while sales is about fulfilling demand. I prefer both as they are interdependent.
Marketing involves creating brand awareness, identifying target audience, and promoting products/services through various channels.
Sales involves converting leads into customers, negotiating deals, and closing sales.
Marketing and sales are interdependent as marketing creates demand and sales fulfills it.
A...
posted on 23 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
To arrest leakages, identify the source, implement preventive measures, monitor regularly, and take corrective actions.
Identify the source of leakages through regular audits and inspections.
Implement preventive measures such as installing leak detection systems or improving maintenance procedures.
Monitor regularly by analyzing data and conducting spot checks.
Take corrective actions promptly to fix leaks and prevent fut
Grouting methods include cementitious grouting, chemical grouting, and pressure grouting.
Cementitious grouting involves mixing cement, water, and additives to create a flowable material for filling gaps.
Chemical grouting uses chemical compounds to fill voids and stabilize soil or rock formations.
Pressure grouting injects grout under pressure to fill cracks and voids in structures.
Examples: epoxy grouting, urethane grou
Approximately 500 cubic yards of concrete were consumed in the last project.
The amount of concrete consumed in a project can vary depending on the size and scope of the project.
Factors such as the type of structure being built, the design specifications, and the location can all impact the amount of concrete needed.
For example, a small residential project may only require a few cubic yards of concrete, while a large co...
based on 8 reviews
Rating in categories
Assistant Manager
57
salaries
| ₹6 L/yr - ₹13.8 L/yr |
Senior Engineer
48
salaries
| ₹4.8 L/yr - ₹9.1 L/yr |
Manager
31
salaries
| ₹5.6 L/yr - ₹13.8 L/yr |
Asst Store
25
salaries
| ₹1.9 L/yr - ₹3.8 L/yr |
Mechanical Engineer
24
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
Ion Exchange India
Re Sustainability Limited
DuPont
VA Tech Wabag