Filter interviews by
I applied via Job Fair and was interviewed in May 2024. There was 1 interview round.
Equipments used in blast furnaces include stoves, hot blast valves, tuyeres, bustle pipes, and skip hoists.
Stoves - used to preheat the air blast before it enters the furnace
Hot blast valves - control the flow of hot air into the furnace
Tuyeres - nozzles through which the hot air is injected into the furnace
Bustle pipes - distribute the hot air evenly throughout the furnace
Skip hoists - used to transport materials in a
Top trending discussions
posted on 10 Jun 2024
Six Sigma is a methodology used in lean manufacturing to improve processes by reducing defects and variation.
Six Sigma aims to achieve a level of quality where there are only 3.4 defects per million opportunities.
It focuses on identifying and eliminating causes of defects to improve overall process efficiency.
Six Sigma uses statistical tools and techniques to measure and analyze process performance.
It involves defining...
TPM stands for Total Productive Maintenance and JH stands for Just in Time. TPM focuses on maintaining equipment to prevent breakdowns, while JH focuses on minimizing waste and improving efficiency.
TPM involves proactive maintenance to prevent breakdowns and improve overall equipment effectiveness
JH focuses on reducing waste, improving efficiency, and delivering products just in time to meet customer demand
TPM steps in...
I applied via Campus Placement
Athmanirbar Bharat - Gave 2 minutes to prepare.
I am a recent graduate with a degree in Business Administration and a passion for marketing and project management.
Graduated with a degree in Business Administration
Passionate about marketing and project management
Completed internships in marketing and project management
Strong communication and organizational skills
Yes, I am comfortable being on the shop floor as it allows me to interact with customers and understand their needs firsthand.
I enjoy interacting with customers and providing them with assistance
Being on the shop floor helps me understand the products and services better
I am able to quickly address any issues or concerns that customers may have
The project involved developing a new software system for inventory management in a retail company.
Implemented a user-friendly interface for employees to track inventory levels and generate reports.
Integrated barcode scanning technology to streamline the process of updating inventory records.
Utilized data analytics to identify trends in inventory turnover and optimize ordering processes.
Steel manufacturing involves the production of steel products through various processes such as melting, refining, casting, and finishing.
Steel is a common material used in the construction of manufacturing equipment and machinery.
Steel is also used in the construction of buildings, bridges, and infrastructure.
Steel manufacturing requires the use of raw materials such as iron ore, coal, and limestone.
Processes involved...
I applied via Newspaper Ad and was interviewed before Jun 2021. There were 3 interview rounds.
On electrical subject
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via Job Portal and was interviewed before Mar 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
78
salaries
| ₹4.6 L/yr - ₹9.5 L/yr |
Deputy Manager
43
salaries
| ₹6 L/yr - ₹10.4 L/yr |
Manager
34
salaries
| ₹7.2 L/yr - ₹15 L/yr |
Senior Engineer
21
salaries
| ₹3.2 L/yr - ₹6.5 L/yr |
Graduate Engineer Trainee (Get)
17
salaries
| ₹1.5 L/yr - ₹6 L/yr |
Jindal Stainless
Jindal Saw
ESL Steel
Jai Balaji Group