Upload Button Icon Add office photos

Filter interviews by

Viraj Projects Web Developer Intern Interview Questions and Answers

Updated 13 Apr 2022

Viraj Projects Web Developer Intern Interview Experiences

1 interview found

I applied via Indeed and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Aptitude Test 
Round 2 - Coding Test 
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why should we hire you?
  • Q3. Where do you see yourself in 5 years?

Interview Preparation Tips

Interview preparation tips for other job seekers - Feedback share within 1,2 days

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Oops concepts,asp.net lifecycle,sql- trigger, update, delete, truncate different

Interview Preparation Tips

Interview preparation tips for other job seekers - The company pay less salary as per market

Interview Questionnaire 

1 Question

  • Q1. Technical Civil Execution engineering with finishing RCC experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy

I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Deduction in shuttering criteria
  • Ans. 

    Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.

    • Deduction in shuttering criteria is done to reduce the cost of construction.

    • It is also done to reduce the time taken for construction.

    • The deduction is usually done based on the strength of the concrete being used.

    • For example, if the concrete strength is high, less shuttering material is required.

    • The deduct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared yourself for interview to get selection
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. About civil engineering for site and billing Quantity surveying and rate analysis .actual site quantity measurements and check contractor bill and certification
  • Q2. Concrete quantity calculations
  • Q3. As per site and as per drawing calculated

Interview Preparation Tips

Interview preparation tips for other job seekers - No future and no skill and no development and no life balance
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. How is stone/Tile flooring /Cladding is measured
  • Ans. 

    Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.

    • Measure the length and width of the area to be covered with stone/tile flooring/cladding

    • Multiply the length by the width to get the total square meters or square feet

    • Account for any cuts or wastage in the calculation

    • Consider the pattern or design of the flooring/cladding when measuring

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join their Site billing profile.They suck at their system and there is nothing such Client approach towards the project.It's kind of In-house and chosen vendors for their projects are so bad that site billing will suffer and you will be blamed.

Interview Questionnaire 

1 Question

  • Q1. Vendor management,pest control management,Housekeeping management
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. In how many days u will join the company
  • Q2. What is your Sal expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - No tips to give. All the best for your interview .nothing more to share

Viraj Projects Interview FAQs

How many rounds are there in Viraj Projects Web Developer Intern interview?
Viraj Projects interview process usually has 3 rounds. The most common rounds in the Viraj Projects interview process are Aptitude Test, Coding Test and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

Pittie Group Interview Questions
2.7
 • 17 Interviews
Ambience Group Interview Questions
3.3
 • 16 Interviews
91springboard Interview Questions
3.7
 • 11 Interviews
Reliable Spaces Interview Questions
2.8
 • 10 Interviews
Ashar group Interview Questions
3.5
 • 9 Interviews
Migsun Group Interview Questions
3.0
 • 7 Interviews
View all
Civil Site Engineer
9 salaries
unlock blur

₹3 L/yr - ₹4 L/yr

Site Engineer
8 salaries
unlock blur

₹3 L/yr - ₹3.8 L/yr

Assistant Manager
7 salaries
unlock blur

₹4.5 L/yr - ₹7.8 L/yr

Project Manager
7 salaries
unlock blur

₹9.6 L/yr - ₹14.5 L/yr

Safety Officer
6 salaries
unlock blur

₹3.6 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Viraj Projects with

Signature Global

4.0
Compare

Pittie Group

2.7
Compare

Advance India Projects

3.7
Compare

Vestian Global Workplace Services

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview