i
Varroc Group
Filter interviews by
Be the first one to contribute and help others!
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
I am a highly experienced Sr. Engineer with a strong background in various engineering disciplines.
Over 10 years of experience in mechanical, electrical, and civil engineering
Led multiple successful projects from concept to completion
Proficient in CAD software such as AutoCAD and SolidWorks
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 6 interview rounds.
Introduction and few case study intraction with MD sir
posted on 7 Nov 2023
I applied via Referral and was interviewed in Oct 2023. There were 3 interview rounds.
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Use quality tools like Pareto chart, fishbone diagram, and 5 Whys to analyze and address customer complaints.
Identify the root cause of the complaint using tools like fishbone diagram.
Prioritize the issues using a Pareto chart to focus on the most critical problems first.
Use the 5 Whys technique to dig deeper into the root cause of the complaint.
Implement corrective actions based on the analysis to prevent similar comp
I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
7QC tools are a set of quality control tools used for process improvement and problem-solving.
Check sheet: Used to collect and analyze data, such as tallying defects in a manufacturing process.
Pareto chart: Helps identify the most significant factors contributing to a problem, based on the 80/20 rule.
Cause and effect diagram (Fishbone diagram): Used to identify and analyze potential causes of a problem.
Histogram: Repre...
QA focuses on preventing defects in the process, while QC focuses on identifying defects in the product.
QA is process oriented, focusing on preventing defects by improving processes and procedures.
QC is product oriented, focusing on identifying defects through testing and inspection.
QA involves activities like reviews, audits, and process improvements.
QC involves activities like testing, inspections, and quality contro...
FMEA stands for Failure Modes and Effects Analysis, a systematic method for identifying and preventing potential failures in a system.
FMEA is a structured approach to identifying and prioritizing potential failure modes in a system.
It involves analyzing the potential effects of these failures and developing mitigation strategies.
FMEA helps in improving the reliability, safety, and quality of a system or process.
There a...
Process & product audit type of poka yoke ensures errors are prevented during audits.
Poka yoke in process audit involves using checklists to ensure all steps are followed correctly
Poka yoke in product audit involves using sensors to detect defects before they occur
Examples include using color-coded labels to prevent mix-ups in audits
Quality Engineer
333
salaries
| ₹1.2 L/yr - ₹6.8 L/yr |
Senior Engineer
259
salaries
| ₹2.8 L/yr - ₹9.4 L/yr |
Assistant Manager
239
salaries
| ₹5.5 L/yr - ₹13.9 L/yr |
Production Engineer
217
salaries
| ₹1.2 L/yr - ₹6.5 L/yr |
Maintenance Engineer
172
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
JBM Group
Subros
Endurance Technologies
Delphi TVS