Upload Button Icon Add office photos

Filter interviews by

Clear (1)

Uttam Sugar Mills Senior Engineer Interview Questions and Answers

Updated 29 Sep 2021

Uttam Sugar Mills Senior Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Mar 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Rotary equipments maintenance

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall good experience.....no problem while interview

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Knowledge about all equipments you have worked in the section.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your answer.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is m25 in concrete
  • Ans. 

    M25 is a grade of concrete with a compressive strength of 25 megapascals after 28 days of curing.

    • M25 is a mix of concrete with a ratio of 1:1:2 (cement:sand:aggregate).

    • It is commonly used for residential construction, pavements, and small-scale projects.

    • The strength of M25 concrete is achieved after 28 days of curing.

    • It is important to follow proper mixing and curing procedures to achieve the desired strength.

  • Answered by AI
  • Q2. How to make boq for larger construction work
  • Ans. 

    To make a BOQ for larger construction work, one must accurately estimate quantities of materials and labor required for each aspect of the project.

    • Break down the project into smaller components such as foundation, superstructure, finishes, etc.

    • Calculate the quantities of materials needed for each component based on the project drawings and specifications.

    • Estimate the labor hours required for each component based on the...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Related to job profile.
  • Q2. Section wise question

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep study about your job profile. Must focus on resume point. Don't write anything extra on your CV.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via LinkedIn and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Mirror images, quantitative aptitude

Round 2 - Group Discussion 

Modern dam in 2023 time: 15 minutes for 8 people

Round 3 - Technical 

(2 Questions)

  • Q1. What is rankine cycle
  • Ans. 

    Rankine cycle is a thermodynamic cycle used in power plants to convert heat into mechanical work.

    • Rankine cycle is a theoretical cycle that represents the operation of a steam power plant.

    • It consists of four processes: heating, expansion, cooling, and compression.

    • The cycle uses a working fluid, typically water or steam, to transfer heat and perform work.

    • The heat source is usually a boiler where fuel is burned to produce...

  • Answered by AI
  • Q2. What do you know about runner power & explain impulse momentum principle
  • Ans. 

    Runner power is the amount of work done by a runner in a given time. Impulse momentum principle states that the change in momentum of an object is equal to the impulse applied to it.

    • Runner power is a measure of how much work a runner can do in a specific time period.

    • It is calculated by dividing the work done by the time taken.

    • For example, if a runner completes a 10 km race in 1 hour, their power can be calculated by di...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Excellent company but need to prepare very well
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. He asked my CTC, my current company work, position, responsibility and all of relevant of my job.
Round 3 - One-on-one 

(1 Question)

  • Q1. Construction related
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Boiler and Turbine related questions
  • Q2. DM and RO question

Interview Preparation Tips

Interview preparation tips for other job seekers - Boiler
Turbine
DM and RO Plant

Interview Questionnaire 

2 Questions

  • Q1. Introduce yourself?
  • Q2. Just keep and simple brief about telling yourself. Tell only key things which you have achieved.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Job Portal and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. About the job profile and current experience
  • Q2. About manpower handling and material management

Interview Preparation Tips

Interview preparation tips for other job seekers - Good place to work, great organization to be a part of!
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Technical session
  • Q2. Troubles pre operation with PM model
  • Ans. 

    Troubles with pre-operation planning in project management model

    • Ensure clear communication and alignment with stakeholders

    • Identify potential risks and develop contingency plans

    • Establish a detailed timeline and allocate resources effectively

    • Regularly monitor progress and adjust plans as needed

  • Answered by AI
  • Q3. Suggest to initiative pm model
  • Ans. 

    Implementing a project management model involves defining project goals, creating a timeline, assigning tasks, monitoring progress, and evaluating outcomes.

    • Define project goals and objectives clearly

    • Create a project timeline with milestones

    • Assign tasks to team members based on their skills and expertise

    • Monitor progress regularly and make adjustments as needed

    • Evaluate outcomes to identify areas for improvement

    • Examples:

  • Answered by AI
Contribute & help others!
anonymous
You can choose to be anonymous

Recently Viewed

INTERVIEWS

Capgemini

No Interviews

INTERVIEWS

PhonePe

No Interviews

SALARIES

Shree Renuka Sugars

SALARIES

Parth Universal

INTERVIEWS

Capgemini

No Interviews

INTERVIEWS

Indian Oil Corporation

No Interviews

REVIEWS

Winjit Technologies

No Reviews

INTERVIEWS

QwikCilver Solutions

No Interviews

SALARIES

Shree Renuka Sugars

INTERVIEWS

Magadh Sugar & Energy

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

PepsiCo Interview Questions
4.0
 • 197 Interviews
Heritage Foods Interview Questions
4.1
 • 82 Interviews
Emami Agrotech Interview Questions
3.8
 • 36 Interviews
KRBL Interview Questions
4.0
 • 26 Interviews
LT Foods Interview Questions
4.0
 • 19 Interviews
View all
Area Sales Manager
24 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Officer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Area Sales Incharge
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Sales Officer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Sales Executive
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Uttam Sugar Mills with

Balrampur Chini Mills

4.0
Compare

Dhampur Sugar Mills

3.9
Compare

Triveni Engineering & Industries

4.1
Compare

Dwarikesh Sugar Industries

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview