Substructure refers to the foundation and lower parts of a building, while superstructure refers to the upper parts of the building.
Substructure includes excavation, foundation, and basement walls.
Superstructure includes walls, floors, roofs, and other above-ground elements.
Substructure is typically constructed first, followed by the superstructure.
The design of the substructure is critical to the stability and longevi...
I applied via Company Website and was interviewed before Jan 2023. There were 2 interview rounds.
All the required knowledge about field
I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.
The minimum list count of stop level depends on the project requirements and complexity.
The number of stop levels should be determined based on the building's height and purpose.
For a high-rise building, there should be more stop levels compared to a low-rise building.
The number of stop levels should also consider the accessibility requirements for people with disabilities.
The minimum list count of stop level is usuall...
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Sep 2020. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 4 interview rounds.
He ask My study details and in will tell Complete B.com.
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Simple aptitude test was conducted
SDLC life cycle in testing involves planning, designing, executing, and reporting on tests to ensure software quality.
The testing phase is an integral part of the SDLC process.
It involves creating test plans, test cases, and test scripts.
Tests are executed to identify defects and ensure software quality.
Defects are reported and tracked until they are resolved.
Testing is performed at various stages of the SDLC, includin...
based on 3 interviews
Interview experience
based on 49 reviews
Rating in categories
Civil Site Engineer
20
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Site Engineer
9
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Junior Engineer Civil
8
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
Assistant Engineer
5
salaries
| ₹3.6 L/yr - ₹18 L/yr |
Mechanical Engineer
5
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
NIIT
AstraZeneca
Videocon d2h
Goodyear