Universal Contractors And Engineers Project Engineer MEP Interview Questions and Answers

Updated 29 Jul 2022

Universal Contractors And Engineers Project Engineer MEP Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Electrical Power Distribution 33KV/415V HVAC System Fire Alarm System Power factor correction How to select switchgear.

Interview Preparation Tips

Interview preparation tips for other job seekers - Make sure thing should be clear about your concept.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Detail process of building survey
  • Ans. 

    The process of building survey involves several steps to assess the condition and suitability of a building.

    • Determine the purpose of the survey and the scope of work

    • Conduct a visual inspection of the building's exterior and interior

    • Identify any structural issues, such as cracks or signs of deterioration

    • Assess the building's systems, including electrical, plumbing, and HVAC

    • Evaluate the building's compliance with buildin...

  • Answered by AI
  • Q2. What is development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.

    • The development length can vary depending on the ...

  • Answered by AI
  • Q3. What about you know waterproofing of toilet area
  • Ans. 

    Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.

    • Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.

    • It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.

    • Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.

    • Pr...

  • Answered by AI
  • Q4. Circumstances of handing over flat to Clint
  • Ans. 

    The circumstances of handing over the flat to Clint

    • The flat was handed over to Clint after completing all necessary paperwork

    • The condition of the flat was documented before handing it over to Clint

    • Keys and access cards were provided to Clint

    • Any outstanding payments or dues were settled before the handover

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Many questions on project and leadership

Interview Preparation Tips

Interview preparation tips for other job seekers - Brush your skills, practice and always be honest.. confidence is extremely important and with only truth you can be super confident. Hiding truth may also get job but for job satisfaction only truth will help and Honest unbiased reviewer will definitely find you. Have patience and All the best!
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of W. T. P
  • Ans. 

    The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.

    • 1. Coagulation: Adding chemicals to water to make particles clump together.

    • 2. Sedimentation: Allowing the clumped particles to settle at the bottom.

    • 3. Filtration: Passing water through filters to remove remaining particles.

    • 4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.

    • 5. Distribution: ...

  • Answered by AI
  • Q2. About safety precautions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Introduce yourself? This This question is just make you comfortable to boost your confidence because you surely know the answer.?
  • Ans. Prepare your introduction and speak. Ensure that your speak naturally - touch upon your education, family, academic & experience. Keep some thread which will generate another related questions & if successful then gobwith flow
  • Answered Anonymously
  • Q2. Why do you want to change?
  • Ans. Multiple answers.. Stagnant, better remuneration, better position, change of location... and many.. see what suits you. Try to avoid talking against any current & previous employer
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare impressive CV, you can include some graphics or pics of your work from earlier employment such as pic with team .. which indirectly explain team size you handled, site pics containing yourself.. explains your site visits. Some KOMs showing formal approach... but ensure, you do not break the confidential requirements...!
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Assignment 

Inter connection in Sikar Project

Round 2 - Case Study 

JHUNJHANU SEWER PROJECT

Interview Preparation Tips

Interview preparation tips for other job seekers - BE FRINENDLY

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

11 Questions

  • Q1. How many years of experience?
  • Q2. Total experience about Water Supply Project out of 13years
  • Q3. Do you work in Consultancy firm & ask about of company ?
  • Ans. Yes, like Wapcos Ltd, LN Malviya infra & and described my roll
  • Answered Anonymously
  • Q4. Asked about inspection that how to check quality of work ?
  • Ans. During inspection of work check quality of material like cement, sand, aggregate, bricks, tmt steel bar, etc. as per IS codes/spec. Quality in Struct
  • Answered Anonymously
  • Q5. If contractors not compliance spec. Then what do you want or take action against.
  • Ans. 

    Take appropriate action against contractors not complying with specifications.

    • Identify the specific non-compliance issues

    • Communicate the non-compliance to the contractors

    • Request corrective actions or modifications to meet the specifications

    • Monitor and document the progress of corrective actions

    • Consider penalties or contract termination if non-compliance persists

  • Answered by AI
  • Q6. Asked about NCR full form
  • Ans. Non conformance Report or Non conformity reports
  • Answered Anonymously
  • Q7. Asked describe about NCR
  • Ans. A non-conformance report, non-conformity report or NCR, is a design and construction-related document that addresses issues where there has been a deviation from the project specification or where work fails to meet agreed quality standards
  • Answered Anonymously
  • Q8. Asked about preparation of financial & physical progress
  • Ans. Financial progress is certified amount which is taken from certified RA Bills . Physical progress is in ongoing progress of the project work which is taken from certified RA Bills qty. & running or ongoing qty.
  • Answered Anonymously
  • Q9. What is your CURRENT CTC & expected? Asked by HR.
  • Ans. Replied my ctc & want 30%hike
  • Answered Anonymously
  • Q10. Asked about working location
  • Q11. Asked about corrent CTC & expected
  • Ans. CTC +30%hike.then finally I have selected.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain about really experience which you have got & study about relevant IS codes & technical specifications.

I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is your previous experience and what is your skill
  • Ans. 

    I have 5 years of experience as a Project Engineer Civil. My skills include project management, structural design, and construction supervision.

    • 5 years of experience as a Project Engineer Civil

    • Proficient in project management, structural design, and construction supervision

    • Managed multiple civil engineering projects from conception to completion

    • Developed and implemented project plans, budgets, and schedules

    • Collaborated...

  • Answered by AI
  • Q2. Previous project details and your expertise
  • Ans. 

    I have worked on various civil engineering projects, specializing in project management and design.

    • Managed a team of engineers and contractors to successfully complete a bridge construction project within the given timeline and budget.

    • Designed and supervised the construction of a wastewater treatment plant, ensuring compliance with environmental regulations.

    • Implemented innovative solutions to optimize the design and co...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be straight and clear with your technical skills , very basic questions will be asked , majorly for civil engineers it is basic but work load will be more comparing to other consultants
Round 1 - HR 

(2 Questions)

  • Q1. What is your family background?
  • Q2. As required for Electrical project Engineer
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes

I applied via Company Website and was interviewed before Sep 2021. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Your profile and your experience Family background
  • Ans. 

    I have a strong profile and extensive experience in project management.

    • Over 10 years of experience in leading and delivering successful projects

    • Proven track record of managing large cross-functional teams

    • Expertise in budgeting, resource allocation, and risk management

    • Strong communication and stakeholder management skills

    • Experience in various industries including technology, construction, and healthcare

  • Answered by AI
  • Q2. Aptitude test It is your mental ability test
Round 2 - Technical 

(3 Questions)

  • Q1. About your technical knowledge
  • Q2. Like your discipline knowledge
  • Q3. Say electrical engineering
  • Ans. 

    Electrical engineering involves the study and application of electricity, electronics, and electromagnetism.

    • Designing and testing electrical systems and equipment

    • Developing and implementing electrical projects

    • Troubleshooting and repairing electrical issues

    • Collaborating with other engineers and professionals

    • Examples: designing power grids, developing renewable energy sources, creating electronic devices

  • Answered by AI
Round 3 - Medical 

(1 Question)

  • Q1. Have positive attitude and confidence
Round 4 - Salary negotiation 

(1 Question)

  • Q1. As per your designation

Interview Preparation Tips

Interview preparation tips for other job seekers - Best place to work
Give technical interview
Then apptitude test
HR interview
Finally medical test

Universal Contractors And Engineers Interview FAQs

How many rounds are there in Universal Contractors And Engineers Project Engineer MEP interview?
Universal Contractors And Engineers interview process usually has 1 rounds. The most common rounds in the Universal Contractors And Engineers interview process are Technical.
How to prepare for Universal Contractors And Engineers Project Engineer MEP interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Universal Contractors And Engineers. The most common topics and skills that interviewers at Universal Contractors And Engineers expect are Building Management System, Fire Alarm System, HVAC and MEP.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 397 Interviews
Tata Technologies Interview Questions
3.7
 • 245 Interviews
TCE Interview Questions
3.8
 • 237 Interviews
Saint-Gobain Interview Questions
4.0
 • 167 Interviews
View all
Billing Engineer
12 salaries
unlock blur

₹4.3 L/yr - ₹9.7 L/yr

Civil Site Engineer
12 salaries
unlock blur

₹2.4 L/yr - ₹3.5 L/yr

Accountant
8 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Safety Officer
5 salaries
unlock blur

₹2.4 L/yr - ₹3.6 L/yr

Billing Manager
5 salaries
unlock blur

₹7.8 L/yr - ₹14.4 L/yr

Explore more salaries
Compare Universal Contractors And Engineers with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview