Upload Button Icon Add office photos

Universal Cables

Compare button icon Compare button icon Compare

Filter interviews by

Universal Cables Production Engineer Interview Questions and Answers

Updated 18 Dec 2024

Universal Cables Production Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Machinery production process iso standards

Interview Preparation Tips

Interview preparation tips for other job seekers - Dekh lo bhai😂 Dhyan se jai mat di

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About Kiln Operations
  • Q2. About VRM Operations
Round 2 - HR 

(2 Questions)

  • Q1. What's ur Expectations
  • Q2. When u will Join

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't Come to Dalmia,Ariyalur..When u Come u Will Feel Hard....Worst Management,Worst Work Culture
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Training 

(1 Question)

  • Q1. Good training provided and course designed as per plant requirements.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basics about cement industry
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. Manufacturing process
  • Q2. What is raw material
  • Ans. 

    Raw material is the basic material used in the production of goods.

    • Raw material is the primary substance or component used to manufacture products.

    • It can be natural resources like wood, metal, or minerals.

    • It can also be processed materials like chemicals or plastics.

    • Raw materials are transformed into finished products through manufacturing processes.

  • Answered by AI
  • Q3. What is clinker
  • Ans. 

    Clinker is a nodular material produced during the cement manufacturing process.

    • Clinker is a key ingredient in the production of cement.

    • It is formed by heating limestone, clay, and other materials in a kiln.

    • The cooled clinker is then ground into a fine powder to produce cement.

    • The quality of clinker greatly affects the quality of the final cement product.

  • Answered by AI
  • Q4. What is packing plant kapisity
  • Ans. 

    Packing plant capacity refers to the maximum amount of products that can be processed and packaged in a plant within a specific time frame.

    • Packing plant capacity is usually measured in units per hour or units per day.

    • It is important for production engineers to optimize the packing plant capacity to meet demand and maximize efficiency.

    • Factors that can affect packing plant capacity include equipment efficiency, productio

  • Answered by AI
  • Q5. What is coal mill kapisity
  • Ans. 

    Coal mill capacity refers to the maximum amount of coal that can be processed by the mill in a given time period.

    • Coal mill capacity is typically measured in tons per hour or tons per day.

    • It is important for production engineers to optimize coal mill capacity to meet production demands.

    • Factors affecting coal mill capacity include the type of coal, moisture content, and mill design.

    • Increasing coal mill capacity can invol...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is ball mill
  • Ans. 

    A ball mill is a type of grinder used to grind and blend materials for use in mineral dressing processes, paints, pyrotechnics, ceramics, and selective laser sintering.

    • Consists of a hollow cylindrical shell rotating about its axis

    • The axis of the shell may be horizontal or at a small angle to the horizontal

    • The grinding media is the balls, which may be made of steel, stainless steel, ceramic, or rubber

    • The inner surface o...

  • Answered by AI
  • Q2. What is raw mill
  • Ans. 

    Raw mill is a machine used in cement production to grind raw materials into a fine powder before being used in the kiln.

    • Raw mill is used in the cement industry to grind raw materials like limestone, clay, and iron ore into a fine powder.

    • The powdered raw materials are then blended and heated in a kiln to form clinker, which is the intermediate product in cement production.

    • Common types of raw mills include ball mills, ro...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dalmia Bharat Cement Production Engineer interview:
  • Production Engineering
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How you beneficial to our organisation ?
  • Q2. What is your previous company achievement?
Round 3 - HR 

(2 Questions)

  • Q1. Why you switch your current organisation?
  • Q2. What is your acceptance salary
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Process parameters
  • Q2. Manufacturing process cement
Round 3 - Technical 

(2 Questions)

  • Q1. CCR OPERATION in cement plant
  • Ans. 

    CCR operation in a cement plant involves monitoring and controlling the process parameters to ensure efficient production.

    • CCR stands for Central Control Room, where operators monitor and control the entire cement production process.

    • Operators in the CCR are responsible for adjusting process parameters such as kiln feed, fuel consumption, and raw material composition.

    • Efficient CCR operation is crucial for maintaining qua...

  • Answered by AI
  • Q2. Plant optimization in cement plant
  • Ans. 

    Plant optimization in cement plant involves improving efficiency, reducing costs, and maximizing output.

    • Implementing advanced process control systems to optimize production

    • Regularly monitoring equipment performance and conducting maintenance to prevent breakdowns

    • Utilizing alternative fuels and raw materials to reduce energy consumption

    • Optimizing the use of additives to improve cement quality and reduce clinker usage

  • Answered by AI

I applied via Company Website and was interviewed in Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Diplom cement technology, cement is a most useful resource.

Round 3 - Technical 

(3 Questions)

  • Q1. 1. Cement manufacturing process .
  • Ans. Crossing, screening, stacking,reclaiming,grounding,free heating,burning,cooling,grainding,add materials prosentes.
  • Answered Anonymously
  • Q2. 2. Cement Row materials
  • Q3. Raw mill vrm boll mill
  • Ans. Grinding unit vrm speed and rpm , boll mill speed
  • Answered Anonymously
Round 4 - Group Discussion 

Vrm rpm speed 20-25 and boll mill rpm speed 25-27

Interview Preparation Tips

Topics to prepare for JK Cement Production Engineer interview:
  • Diploma in Cement technology
Interview preparation tips for other job seekers - Please find the attechment of resume of diploma in cement technology.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Technical manufacturing process

I applied via Naukri.com and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to increase productivity Smoothly operation
  • Ans. 

    Increasing productivity and smooth operation can be achieved through proper planning, efficient processes, and continuous improvement.

    • Identify bottlenecks and inefficiencies in the production process

    • Implement lean manufacturing principles to eliminate waste and streamline processes

    • Invest in automation and technology to improve efficiency

    • Provide training and development opportunities for employees to enhance their skill...

  • Answered by AI
  • Q2. Plant operation smoothly
  • Ans. 

    Plant operation can be made smooth by implementing efficient processes and regular maintenance.

    • Regular maintenance of equipment and machinery

    • Efficient scheduling of production runs

    • Effective communication between departments

    • Continuous improvement initiatives

    • Proper training of employees

    • Use of automation and technology

    • Monitoring and analysis of production data

    • Implementation of safety protocols

    • Effective inventory managemen

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical questions good awareness and plant operation

Universal Cables Interview FAQs

How many rounds are there in Universal Cables Production Engineer interview?
Universal Cables interview process usually has 1 rounds. The most common rounds in the Universal Cables interview process are Technical.
What are the top questions asked in Universal Cables Production Engineer interview?

Some of the top questions asked at the Universal Cables Production Engineer interview -

  1. Machinery production process iso standa...read more
  2. Tell me about yours...read more

Tell us how to improve this page.

Universal Cables Production Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Universal Cables Production Engineer Salary
based on 23 salaries
₹2.4 L/yr - ₹5.1 L/yr
7% more than the average Production Engineer Salary in India
View more details

Universal Cables Production Engineer Reviews and Ratings

based on 5 reviews

4.1/5

Rating in categories

4.4

Skill development

3.8

Work-life balance

3.8

Salary

5.0

Job security

3.8

Company culture

4.1

Promotions

4.3

Work satisfaction

Explore 5 Reviews and Ratings
Production Engineer
23 salaries
unlock blur

₹2.3 L/yr - ₹5.1 L/yr

Assistant Manager
13 salaries
unlock blur

₹5.3 L/yr - ₹9.9 L/yr

Deputy Manager
12 salaries
unlock blur

₹5.1 L/yr - ₹13 L/yr

Senior Manager
12 salaries
unlock blur

₹9 L/yr - ₹15 L/yr

Manager
11 salaries
unlock blur

₹6.5 L/yr - ₹15.1 L/yr

Explore more salaries
Compare Universal Cables with

JK Cement

4.1
Compare

ACC

3.9
Compare

Shree Cement

3.8
Compare

Dalmia Bharat Cement

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview