Filter interviews by
I applied via Referral and was interviewed in Sep 2023. There was 1 interview round.
I have extensive experience in successfully executing projects from start to finish, ensuring all deliverables are met on time and within budget.
Led cross-functional teams to execute projects according to scope, schedule, and budget
Implemented project management methodologies to track progress and identify risks
Communicated regularly with stakeholders to provide updates and address any issues
Utilized project management...
Top trending discussions
posted on 27 Dec 2020
I applied via Naukri.com and was interviewed before Dec 2019. There was 1 interview round.
posted on 13 Feb 2023
I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.
Lap is used in the center of a column or Zone B for structural stability and reinforcement.
Lap joints provide additional strength and stability to the column.
They help in distributing the load evenly across the column.
Lap joints prevent the column from cracking or failing under heavy loads.
Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.
By using lap in the...
Construction joints are provided at mid-span of simply supported slabs.
Construction joints are provided to allow for differential movement between adjacent sections of the slab.
They are typically located at mid-span of the slab, where the bending moment is zero.
The joint should be designed to transfer shear and moment between the two sections of the slab.
Proper reinforcement detailing is necessary to ensure the joint f...
L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.
L/6 is used for residential buildings while L/3 is used for commercial buildings.
The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.
For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6)...
posted on 8 Jun 2023
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, schedule, and budget.
Executing: Implement the project plan and manage resources.
Monitoring: Track progress, identify issues, and make adjustments.
Closing: Finalize project deliverables and evaluate project success.
I have expertise in using various planning software such as Microsoft Project, Asana, and Trello to effectively manage projects.
Proficient in creating project plans, assigning tasks, and tracking progress using planning software
Skilled in resource allocation, budget management, and timeline scheduling within the software
Experience in generating reports, Gantt charts, and project timelines for stakeholders
Familiar with ...
posted on 1 Mar 2023
posted on 14 Sep 2023
I applied via Recruitment Consulltant
Project Management , Production Management and HSE
Deeply interested in RR PACKAGE
Well. We used to do everyday
posted on 9 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2022. There were 2 interview rounds.
To make a budget for a project, identify all expenses and allocate funds accordingly.
Identify all expenses including labor, materials, equipment, and any other costs
Estimate the cost of each expense and allocate funds accordingly
Consider any potential risks or unexpected expenses and allocate contingency funds
Regularly review and adjust the budget as needed throughout the project
Use budgeting software or tools to help ...
The rate of RCC, reinforcement, or shuttering can be analyzed through various factors.
Factors affecting the rate of RCC include the type of concrete mix, the size and shape of the structure, and the location of the project.
Reinforcement rates depend on the type and size of the reinforcement used, as well as the complexity of the design.
Shuttering rates are influenced by the type of material used, the size and shape of ...
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Online meeting conducted with me.About 4 to 5 people along with HR had a discussion with me.Asked questions regarding my work exposure and technical questions.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Site Engineer
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Incharge
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group