Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Unique Infra Engineering India Private Limited Team. If you also belong to the team, you can get access from here

Filter interviews by

Unique Infra Engineering India Private Limited Manager Interview Questions and Answers

Updated 22 Sep 2023

Unique Infra Engineering India Private Limited Manager Interview Experiences

1 interview found

Manager Interview Questions & Answers

user image Anonymous

posted on 17 Aug 2023

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How generate report in tally
  • Ans. 

    Reports can be generated in Tally by selecting the desired report from the menu options.

    • Go to the Gateway of Tally

    • Select the desired report from the menu options

    • Customize the report as needed by selecting options like period, columns, etc.

    • Preview the report before printing or exporting it

  • Answered by AI
  • Q2. Do you experience on sap

Interview Preparation Tips

Interview preparation tips for other job seekers - !!Join mat karna doston!!
Its not a joke
If you have recieved a offer from unique infra so understand this is a trap because salary is not on time 2 to 4 month delay.

Skills evaluated in this interview

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Accomodation and vechile facilities need .

Interview Preparation Tips

Interview preparation tips for other job seekers - In reliance they not give accommodation and vechile facilities to reach site. Only problem was a big problem. Company good

I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What are the standards used for plant layout in refineries
  • Ans. 

    Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.

    • Plant layout should prioritize safety and minimize the risk of accidents.

    • Efficiency is also important, with consideration given to the flow of materials and equipment.

    • Regulations and industry standards must be followed, such as those set by OSHA and API.

    • Examples of layout considerations include spacing between equipment,...

  • Answered by AI
  • Q2. What is the frequency on visiting Vendor Shops for expediting
  • Ans. 

    The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.

    • The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.

    • It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...

  • Answered by AI
  • Q3. Have You worked in CDU-VDU unit?
  • Q4. What is DCU?
  • Ans. 

    DCU stands for Dublin City University, a university located in Dublin, Ireland.

    • DCU was established in 1980 and has over 17,000 students.

    • It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.

    • DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.

    • Some not...

  • Answered by AI
  • Q5. Why it is called delayed?
  • Ans. 

    Delayed is called so because it refers to something that is postponed or occurs after the expected time.

    • The term 'delayed' is used to describe situations where there is a time lag or postponement.

    • It implies that something is not happening immediately or as scheduled.

    • Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.

    • For example, a delayed flight refers to ...

  • Answered by AI
  • Q6. What happens at CDU-VDU?

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one technical interview and final negotiation with HR

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What are the methods of population projection, How to project population for water supply projects?
  • Ans. 

    Population projection methods include cohort-component, trend extrapolation, and expert opinion. For water supply projects, population can be projected based on historical data, demographic trends, and development plans.

    • Population projection methods: cohort-component, trend extrapolation, expert opinion

    • For water supply projects, project population based on historical data, demographic trends, development plans

    • Consider ...

  • Answered by AI
  • Q2. Methods of designing water distribution system and elevated service reservoirs
  • Ans. 

    Water distribution systems are designed using hydraulic principles to ensure efficient water supply to consumers. Elevated service reservoirs are designed to store and distribute water at higher elevations.

    • Water distribution systems are designed based on factors such as population served, water demand, topography, and available water sources.

    • Hydraulic calculations are used to determine pipe sizes, flow rates, and press...

  • Answered by AI

Manager Interview Questions & Answers

Tata Projects user image Niteenkumar Belkoniker

posted on 24 May 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Background and qualifications
Round 2 - Technical 

(1 Question)

  • Q1. About experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical questions about Civil Engineering
  • Q2. HR round was tough and grinding
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Pure technical about various commodities
  • Q2. Explain about what you have seen

Interview Preparation Tips

Interview preparation tips for other job seekers - Be good at your resume
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell us about About yourself
  • Q2. Explain about epc industry
Round 2 - One-on-one 

(2 Questions)

  • Q1. Why do you want to join
  • Q2. Will you be comfortable working from office

I applied via Naukri.com and was interviewed in Apr 2021. There were 6 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. The questions are all subjective relating to finance
  • Q2. How to raise funding and how to control on spending
  • Ans. 

    To raise funding, create a solid business plan and pitch to investors. To control spending, set a budget and track expenses.

    • Create a detailed business plan that outlines your goals, strategies, and financial projections.

    • Identify potential investors and pitch your business plan to them.

    • Consider alternative funding sources such as crowdfunding or small business loans.

    • Set a budget and track all expenses to ensure you are ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be specific and accurate about your knowledge on the fields you are already worked and keep updated with the areas of the field in which you are working

I applied via Recruitment Consulltant and was interviewed in Apr 2021. There were 2 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Basic questions about whatever learned from experience.
  • Q2. Welders progress daily progress rate
  • Ans. 

    The daily progress rate of welders varies based on factors such as experience, type of welding, and complexity of the project.

    • Welders with more experience tend to have a higher daily progress rate.

    • The type of welding being done can also affect the daily progress rate. For example, TIG welding may take longer than MIG welding.

    • The complexity of the project can also impact the daily progress rate. A simple welding project...

  • Answered by AI
  • Q3. Overall project delays , Constraint.
  • Ans. 

    Project delays can be caused by various constraints.

    • Project delays can be caused by resource constraints such as lack of manpower or budget constraints.

    • Technical constraints such as unexpected technical issues or changes in requirements can also cause delays.

    • External constraints such as weather conditions or delays in receiving materials can also impact project timelines.

    • Effective project management can help mitigate t

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Tata Projects Manager interview:
  • Mechanical construction
  • Piping Engineering
  • Project Management
  • Progress
  • Day activity
  • Performance Management
Interview preparation tips for other job seekers - Always be with the job and task as learn everyday some thing
before go out of site.

Unique Infra Engineering India Private Limited Interview FAQs

How many rounds are there in Unique Infra Engineering India Private Limited Manager interview?
Unique Infra Engineering India Private Limited interview process usually has 2 rounds. The most common rounds in the Unique Infra Engineering India Private Limited interview process are Resume Shortlist and Technical.
How to prepare for Unique Infra Engineering India Private Limited Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Unique Infra Engineering India Private Limited. The most common topics and skills that interviewers at Unique Infra Engineering India Private Limited expect are Hiring, Recruitment and Talent Acquisition.

Tell us how to improve this page.

Unique Infra Engineering India Private Limited Manager Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 426 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
J&F Interview Questions
3.8
 • 30 Interviews
View all
Site Engineer
31 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
28 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
14 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Billing Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Unique Infra Engineering India Private Limited with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview