Upload Button Icon Add office photos

UltraTech Cement

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

UltraTech Cement Technical Executive Interview Questions, Process, and Tips for Experienced

Updated 28 Feb 2025

Top UltraTech Cement Technical Executive Interview Questions and Answers for Experienced

UltraTech Cement Technical Executive Interview Experiences for Experienced

7 interviews found

Technical Executive Interview Questions & Answers

user image Debendra parida

posted on 16 Aug 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Besed on practical as well as theoretical on cement.
Round 3 - HR 

(1 Question)

  • Q1. Related to location and salary.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the difference between OPC cement and PPC cement
  • Ans. 

    OPC cement is Ordinary Portland Cement, while PPC cement is Portland Pozzolana Cement. The main difference lies in the materials used and their properties.

    • OPC cement is made by grinding clinker with gypsum, while PPC cement is made by intergrinding clinker, fly ash, and gypsum.

    • PPC cement has higher long-term strength and durability compared to OPC cement.

    • PPC cement is more environmentally friendly as it uses industrial...

  • Answered by AI
  • Q2. What are test of cement
  • Ans. 

    Tests of cement are used to ensure its quality and strength for construction purposes.

    • Setting time test: Determines how long it takes for the cement to set.

    • Compressive strength test: Measures the maximum load the cement can bear before failure.

    • Soundness test: Checks for the presence of uncombined lime in the cement.

    • Fineness test: Determines the particle size of the cement.

    • Consistency test: Measures the amount of water ...

  • Answered by AI
  • Q3. What is theProcess of making of cement?
  • Ans. 

    Cement is made by heating limestone with clay in a kiln, then grinding the mixture into a fine powder.

    • Limestone and clay are crushed and mixed in proper proportions

    • The mixture is then heated in a kiln at high temperatures

    • After heating, the material is cooled and ground into a fine powder

    • The powder is then mixed with gypsum to regulate setting time

    • The final product is cement, which is used in construction

  • Answered by AI

Technical Executive Interview Questions Asked at Other Companies for undefined

Q1. What are the type of building is living purpose?
Q2. What is the height of the roof of a typical house?
Q3. Which type of structure is strong in buildings?
asked in JLL
Q4. What is a Transformer? How Electricity can be conserved in this m ... read more
Q5. What is the creak voltage ? Battery voltage?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About Cement Mix design
Round 3 - HR 

(1 Question)

  • Q1. About your strength and weakness

Interview Preparation Tips

Interview preparation tips for other job seekers - Great Experience work with ultratech cement
Interview experience
3
Average
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Questions Related to Concrete Technology
Round 3 - One-on-one 

(1 Question)

  • Q1. Salery Related and Privious Company

UltraTech Cement interview questions for designations

 Technical Support Executive

 (1)

 Technical Engineer Executive

 (1)

 Technical Engineer

 (2)

 Technical Representative

 (1)

 Technical Officer

 (1)

 Technical Service Engineer

 (4)

 Technical Support Engineer

 (2)

 Senior Technical Officer

 (1)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Site quality assurance and quality control
  • Q2. Related to quality assurance
  • Q3. Related to quality control on site
  • Q4. Related to testing purpose
Round 3 - HR 

(1 Question)

  • Q1. Related to salery discussion

Interview Questionnaire 

3 Questions

  • Q1. Water cement ratio
  • Q2. Grade of Concrete
  • Ans. 

    Grade of concrete refers to its strength and is denoted by a number followed by 'M'.

    • Grade of concrete is determined by its compressive strength after 28 days of curing.

    • The most common grades of concrete used in construction are M20, M25, M30, and M35.

    • Higher grade of concrete means higher strength and durability.

    • The grade of concrete required for a particular construction project depends on the load-bearing capacity and

  • Answered by AI
  • Q3. How to convert other site
  • Ans. 

    To convert other site, use web scraping techniques to extract data and transform it into desired format.

    • Use web scraping tools like BeautifulSoup or Scrapy to extract data from the other site

    • Transform the extracted data into the desired format using programming languages like Python or JavaScript

    • Consider the structure of the other site and how to best extract and convert the data

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared for technical knowledge about cement , concrete

Skills evaluated in this interview

I applied via Referral and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Cement and concrete related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare cement and concrete basic knowledge.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Test based on basic Mining knowledge

Round 3 - One-on-one 

(1 Question)

  • Q1. Interview questions based on Blasting process and new technology.

Interview Questionnaire 

8 Questions

  • Q1. Briefly explain about Mines crusher?
  • Ans. 

    Mines crusher is a machine used to break down large rocks into smaller pieces for easier transport and processing.

    • Mines crusher is commonly used in mining operations to reduce the size of ore and other materials.

    • It works by applying pressure to the material to break it down into smaller pieces.

    • Different types of crushers are used depending on the type of material being crushed, such as jaw crushers, cone crushers, and ...

  • Answered by AI
  • Q2. What is PESO ? and explain different forms related to explosives?
  • Ans. 

    PESO refers to different forms of explosives: Primary, Secondary, Emulsion, and Oxidizer.

    • Primary explosives are sensitive and used to initiate other explosives.

    • Secondary explosives are less sensitive and used for blasting.

    • Emulsion explosives are a mixture of oxidizers and fuels.

    • Oxidizers are chemicals that provide oxygen for combustion.

  • Answered by AI
  • Q3. What is stripping ratio?
  • Ans. 

    Stripping ratio is the ratio of overburden to ore or coal.

    • It is used in mining to determine the amount of waste that needs to be removed to extract a given amount of ore or coal.

    • A high stripping ratio indicates that a lot of waste needs to be removed before the desired mineral can be extracted.

    • For example, a stripping ratio of 3:1 means that for every 3 units of waste material removed, 1 unit of ore or coal can be extr

  • Answered by AI
  • Q4. What is angle of repose?
  • Ans. 

    Angle of repose is the maximum angle at which a material can be piled up without slumping or sliding down.

    • It is the steepest angle at which a sloping surface formed of a particular loose material is stable.

    • It is influenced by the size, shape, and surface properties of the particles, as well as the moisture content and packing density.

    • Examples include sand dunes, piles of gravel, and heaps of coal.

    • It is important in fie...

  • Answered by AI
  • Q5. Reasons behind the Dump failure?
  • Ans. 

    Dump failure can occur due to various reasons such as hardware failure, software bugs, power failure, etc.

    • Hardware failure such as disk failure or memory failure

    • Software bugs or corruption in the dump file

    • Power failure during the dump process

    • Insufficient disk space for the dump file

    • Incompatibility issues with the operating system or drivers

    • Malware or virus infection

    • Human error such as accidentally deleting the dump fil

  • Answered by AI
  • Q6. How you get Machine and Dumper TPH?
  • Ans. 

    Machine and Dumper TPH can be calculated by measuring the weight of material moved in a certain time period.

    • Measure the weight of material moved by the machine or dumper in a certain time period

    • Divide the weight by the time period to get the TPH (tonnes per hour)

    • Repeat the process multiple times to get an average TPH

    • Use a weighbridge or load cell to accurately measure the weight

    • Ensure the machine or dumper is loaded to

  • Answered by AI
  • Q7. What is safety!
  • Ans. 

    Safety is the state of being protected from harm or danger.

    • It involves taking precautions to prevent accidents or injuries.

    • It can be achieved through proper training, equipment, and procedures.

    • Examples include wearing protective gear, following safety protocols, and maintaining equipment.

    • Safety is important in all industries, from construction to healthcare.

    • It is a shared responsibility of both employers and employees.

    • ...

  • Answered by AI
  • Q8. Duties and responsibilities of mines foreman?
  • Ans. 

    Mines foreman is responsible for overseeing the safety, production, and maintenance of a mining operation.

    • Ensuring compliance with safety regulations and protocols

    • Supervising and coordinating the work of miners and other staff

    • Monitoring production levels and ensuring targets are met

    • Maintaining equipment and machinery

    • Preparing reports and maintaining records

    • Training new employees and providing ongoing training to existi

  • Answered by AI
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell me the difference between one way slab and two way slab
  • Ans. 

    One way slab is supported on two opposite sides only, while two way slab is supported on all four sides.

    • One way slab is designed to carry loads along one direction only

    • Two way slab is designed to carry loads along both directions

    • One way slab is generally used in buildings with rectangular or square shapes

    • Two way slab is commonly used in buildings with irregular shapes or where the spans are almost equal

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just one random question from HOD about cement properties and you're in.

UltraTech Cement Interview FAQs

How many rounds are there in UltraTech Cement Technical Executive interview for experienced candidates?
UltraTech Cement interview process for experienced candidates usually has 2-3 rounds. The most common rounds in the UltraTech Cement interview process for experienced candidates are Resume Shortlist, Technical and HR.
How to prepare for UltraTech Cement Technical Executive interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at UltraTech Cement. The most common topics and skills that interviewers at UltraTech Cement expect are Performance Management, Product Promotion and Product Quality.
What are the top questions asked in UltraTech Cement Technical Executive interview for experienced candidates?

Some of the top questions asked at the UltraTech Cement Technical Executive interview for experienced candidates -

  1. What is the difference between OPC cement and PPC cem...read more
  2. What is theProcess of making of ceme...read more
  3. How to convert other si...read more
How long is the UltraTech Cement Technical Executive interview process?

The duration of UltraTech Cement Technical Executive interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

UltraTech Cement Technical Executive Interview Process for Experienced

based on 5 interviews

3 Interview rounds

  • Resume Shortlist Round
  • Technical Round
  • HR Round
View more

Interview Questions from Similar Companies

JK Cement Interview Questions
4.1
 • 255 Interviews
Grasim Industries Interview Questions
4.0
 • 205 Interviews
ACC Interview Questions
3.9
 • 190 Interviews
Shree Cement Interview Questions
3.8
 • 155 Interviews
Ambuja Cements Interview Questions
3.9
 • 109 Interviews
Star Cement Interview Questions
4.0
 • 64 Interviews
HIL Limited Interview Questions
4.1
 • 61 Interviews
View all
UltraTech Cement Technical Executive Salary
based on 149 salaries
₹1.2 L/yr - ₹6.5 L/yr
9% less than the average Technical Executive Salary in India
View more details

UltraTech Cement Technical Executive Reviews and Ratings

based on 123 reviews

4.4/5

Rating in categories

4.2

Skill development

3.9

Work-life balance

4.2

Salary

3.9

Job security

4.1

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 123 Reviews and Ratings
Assistant Manager
1.2k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
528 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Officer
493 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
453 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Officer
388 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare UltraTech Cement with

Ambuja Cements

3.9
Compare

ACC

3.9
Compare

Shree Cement

3.8
Compare

Dalmia Bharat Cement

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview