i
Uflex
Filter interviews by
I am an Electromechanical Engineer with expertise in managing complex projects and ensuring efficient operations.
I have been working as an Electromechanical Engineer for the past 5 years.
I have successfully led multiple projects involving the integration of electrical and mechanical systems.
I am responsible for overseeing the design, installation, and maintenance of electromechanical equipment.
I collaborate with cross-...
Yes, I am capable of reading electrical drawings and correcting errors in them.
I have experience in reading and interpreting electrical drawings.
I am familiar with common symbols and conventions used in electrical drawings.
I have corrected errors in electrical drawings in the past.
I am proficient in using software tools to edit and modify electrical drawings.
I am detail-oriented and can spot errors and inconsistencies
Motor can be controlled by sensor using feedback loop and control algorithm.
Use a sensor to measure the motor's speed or position
Feed the sensor data into a control algorithm
Adjust the motor's power or speed based on the algorithm's output
Repeat the process in a feedback loop to maintain control
The output of a PNP sensor is a high signal when there is no object detected and a low signal when an object is detected.
PNP sensors are used to detect the presence or absence of objects.
They work by emitting a signal and detecting the reflection of that signal.
When an object is present, the signal is reflected back to the sensor and the output is low.
When no object is present, the signal is not reflected and the outpu...
I would assess the requirements and determine if the NPN sensor can be used as a substitute or if a PNP sensor is absolutely necessary.
Check the specifications of the NPN sensor to see if it meets the requirements of the PNP sensor
Determine if the wiring and connections can be modified to accommodate the NPN sensor
If the NPN sensor cannot be used, source a PNP sensor that meets the requirements
Top trending discussions
posted on 22 Sep 2022
I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.
Preventive maintenance is a proactive approach to maintenance that aims to prevent equipment failure before it occurs.
Regularly scheduled inspections and maintenance
Replacing worn or damaged parts before they cause a breakdown
Cleaning and lubricating equipment to prevent wear and tear
Keeping accurate records of maintenance activities
Examples: changing the oil in a car, replacing air filters in HVAC systems, inspecting
SAP PM module is used for managing maintenance activities of an organization.
PM stands for Plant Maintenance
It helps in planning and scheduling maintenance tasks
Tracks equipment and maintenance history
Provides cost analysis and reporting
Integrates with other SAP modules like MM and FI
Example: A manufacturing company can use SAP PM to schedule maintenance of their production equipment
I have handled various utilities equipments including generators, chillers, HVAC systems, and water treatment plants.
Generators: responsible for maintenance and repair of diesel and gas generators
Chillers: handled installation and maintenance of air-cooled and water-cooled chillers
HVAC systems: managed repair and maintenance of heating, ventilation, and air conditioning systems
Water treatment plants: responsible for op...
Bearings are used to reduce friction between two moving parts. There are several types of bearings.
Plain bearings
Rolling element bearings
Jewel bearings
Fluid bearings
Magnetic bearings
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 25 Jun 2024
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
posted on 18 Aug 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 4 interview rounds.
Negotiated a 20% discount on a bulk order of office supplies.
Identified the need for a large order of office supplies
Researched prices from multiple vendors
Used data to negotiate a 20% discount with the chosen vendor
Ensured timely delivery of the supplies
posted on 18 Oct 2022
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
I applied via Indeed and was interviewed in Mar 2024. There were 5 interview rounds.
The temperature of the mixture will be between 30deg and 60deg depending on the quantities of each liquid.
The final temperature of the mixture will be a weighted average of the temperatures of the two liquids.
The specific heat capacities and masses of the liquids will also affect the final temperature.
For example, if equal amounts of the two liquids are mixed, the final temperature will be the average of 30deg and 60de
Business case study about to test you project management knowledge
Some of the top questions asked at the Uflex Electromechanical Engineer interview -
Assistant Manager
581
salaries
| ₹4.5 L/yr - ₹14.4 L/yr |
Junior Engineer
516
salaries
| ₹1.5 L/yr - ₹5.8 L/yr |
Officer
393
salaries
| ₹3 L/yr - ₹8.5 L/yr |
Manager
165
salaries
| ₹6.9 L/yr - ₹20.6 L/yr |
Production Officer
109
salaries
| ₹3.2 L/yr - ₹8.5 L/yr |
Huhtamaki
EPL Limited
Manjushree Technopack
Jindal Poly Films