posted on 4 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
The work procedure in our organization for RA Bill preparation involves several steps.
Gathering all relevant project documents and information
Analyzing the project scope and specifications
Measuring and quantifying the work done on-site
Preparing detailed rate analysis for each item of work
Calculating the quantities and rates for each item
Preparing the bill of quantities (BOQ)
Cross-checking the BOQ with the project speci...
Different types of bills in quantity surveying
Measurement bill: It includes the detailed measurements of various items of work.
Abstract bill: It provides a summary of all the measurements and quantities of work done.
Cost bill: It includes the cost of each item of work and the total cost of the project.
Final bill: It is the final settlement bill after completion of the project.
Interim bill: It is prepared at regular int...
Contact documents are essential in bill preparation as they outline the terms and conditions of the contract, provide clarity on project scope, and ensure fair payment for work done.
Contact documents define the legal agreement between the parties involved in a construction project.
They outline the terms and conditions, including project scope, deliverables, timelines, and payment terms.
Contact documents provide clarity...
Reconciliation is performed by comparing and matching financial records to ensure accuracy and consistency.
Reconciliation involves comparing two sets of records, such as bank statements and accounting records, to identify any discrepancies.
The process includes verifying the accuracy of transactions, identifying errors or omissions, and making necessary adjustments.
Reconciliation can be performed manually or using softw...
Yes, I am proficient in AutoCAD and Excel.
I have extensive experience using AutoCAD for creating and editing technical drawings.
I am skilled in using Excel for data analysis, calculations, and creating spreadsheets.
I have successfully completed projects where I utilized both AutoCAD and Excel.
I am familiar with the various features and functions of both software.
I can efficiently generate quantity take-offs and cost es
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
Managing site in high pressure requires effective communication, prioritization, and problem-solving skills.
Establish clear communication channels with team members and stakeholders
Prioritize tasks based on urgency and importance
Anticipate potential problems and have contingency plans in place
Stay calm and focused under pressure
Delegate tasks to capable team members
Maintain a positive attitude and motivate team members
...
I applied via Walk-in and was interviewed before Oct 2022. There were 3 interview rounds.
Quality checks will be conducted through regular site inspections, material testing, subcontractor evaluations, and adherence to project specifications.
Regular site inspections to ensure work meets quality standards
Material testing to verify quality and durability
Evaluation of subcontractors to ensure they meet quality requirements
Adherence to project specifications and standards
Implementing quality control measures su
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is the current annual salary of the candidate.
Expected CTC is the annual salary the candidate is expecting from the new job.
It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.
For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.
Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.
I prepare detailed estimates based on quantities of materials and labor required for a project.
I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.
I use software tools...
Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.
Check quantities mentioned in the bill against the actual work done on site.
Verify rates and unit prices for each item in the bill with the contract agreement.
Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.
Conduct site measurements to confirm the work completed matches the
Evidential documents required for scrutinizing the RA Bill
Contract documents
Measurement sheets
Bills of quantities
Variation orders
Payment certificates
Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.
Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.
Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...
Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.
Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.
Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.
Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Simple game style interview
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
IS code for BBS is IS 1786:2008
IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction
Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects
I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 5 interview rounds.
posted on 10 Nov 2021
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
Electrical Engineer
5
salaries
| ₹1.1 L/yr - ₹4.5 L/yr |
Mechanical Technician
5
salaries
| ₹7 L/yr - ₹9.2 L/yr |
Mechanical Engineer
4
salaries
| ₹12 L/yr - ₹14.3 L/yr |
Senior Engineer Mechanical
4
salaries
| ₹28 L/yr - ₹44 L/yr |
Electrical Supervisor
4
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company