i
Thermax Limited
Filter interviews by
I applied via Walk-in and was interviewed before Jul 2023. There was 1 interview round.
Which is better between electric and fuel driven vehicles
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Nov 2023. There were 3 interview rounds.
My highest qualification is a Master's degree in Electrical Engineering.
Master's degree in Electrical Engineering
Specialized in power systems
Thesis focused on renewable energy integration
Completed advanced courses in control systems
Published research papers in IEEE conferences
As a Senior Engineer, my role in project quality is to ensure that all deliverables meet the required standards and specifications.
Developing and implementing quality assurance processes and procedures
Conducting regular audits and inspections to identify any quality issues
Collaborating with cross-functional teams to address and resolve quality concerns
Creating and maintaining quality documentation, including test plans...
Lean manufacturing is a systematic approach to eliminate waste and improve efficiency in production processes. 5'S is a method to organize and maintain a clean workplace.
Lean manufacturing focuses on reducing waste, such as overproduction, waiting time, transportation, inventory, motion, and defects.
It aims to improve efficiency, quality, and customer satisfaction.
5'S is a set of five principles: Sort, Set in Order, Sh...
TPM stands for Total Productive Maintenance and refers to a systematic approach to equipment maintenance. Industrial wastes are unwanted materials or byproducts generated during industrial processes.
TPM is a proactive maintenance strategy aimed at maximizing equipment effectiveness and minimizing downtime.
It involves regular inspections, preventive maintenance, and continuous improvement of equipment and processes.
TPM ...
PPE (Personal Protective Equipment) is important for ensuring the safety and well-being of individuals in various industries.
PPE helps protect against physical, chemical, and biological hazards.
It includes items such as helmets, gloves, goggles, masks, and protective clothing.
PPE is crucial in industries like construction, healthcare, manufacturing, and mining.
Examples of PPE usage include wearing a hard hat on a const...
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Shift Incharge
300
salaries
| ₹2.7 L/yr - ₹10.2 L/yr |
Assistant Manager
277
salaries
| ₹5.8 L/yr - ₹16 L/yr |
Electrical Engineer
231
salaries
| ₹2.4 L/yr - ₹7.2 L/yr |
Senior Executive
211
salaries
| ₹4 L/yr - ₹11 L/yr |
Control Room Engineer
196
salaries
| ₹2.5 L/yr - ₹7 L/yr |
John Deere
Cummins
ABB
KONE