Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2020. There were 4 interview rounds.
Questions related to railway engineering including rail length, types, bitumen ductility, sleepers, and load carrying capacity.
The length of one rail is typically around 13 meters.
There are several types of rails used in India including 60kg, 52kg, and 90R.
Bitumen is a highly ductile material commonly used in road construction.
There are approximately 26 sleepers in a 13m rail.
Rails carry various loads when trains are r...
Sleepers are structural elements used in railway tracks to support the rails and distribute the load.
Sleepers provide stability and alignment to the railway tracks.
They help in distributing the load from the trains to the underlying ballast.
Sleepers also help in maintaining the gauge of the tracks.
They absorb vibrations and reduce noise generated by the trains.
Common types of sleepers include wooden, concrete, and stee
A load distributed system of rail is a system where the weight of the train is spread out over multiple axles.
The weight of the train is distributed over multiple axles to prevent damage to the tracks.
This system is commonly used in heavy haul rail transport.
The load distribution is achieved through the use of bogies, which are sets of wheels that are attached to a frame.
The bogies allow the weight of the train to be s...
Expensive gap refers to the difference in cost between the lowest and highest bids for a construction project.
It is a common occurrence in the bidding process for construction projects.
The gap can be significant and can impact the decision-making process for awarding the contract.
Factors that can contribute to an expensive gap include market conditions, project complexity, and contractor availability.
For example, if th...
Tongue rail is a movable rail that guides the wheel flanges of a train, while stock rail is a fixed rail that supports the weight of the train.
Tongue rail is also known as switch rail or point rail.
Stock rail is also known as running rail or mainline rail.
Tongue rail is usually shorter than stock rail.
Tongue rail is designed to move and guide the train onto the desired track, while stock rail supports the weight of the...
Top trending discussions
I applied via LinkedIn and was interviewed before Sep 2021. There were 2 interview rounds.
Conversation about my experience
I applied via Naukri.com and was interviewed in Mar 2020. There were 3 interview rounds.
I appeared for an interview in Jan 2017.
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Recent graduate with a degree in Computer Science
Passionate about coding and problem-solving
Strong communication and teamwork skills
I have been actively involved in sports since childhood, participating in various team sports and individual activities.
Played soccer for 10 years, competing at a regional level
Participated in track and field events in high school, specializing in long jump and hurdles
Currently enjoy hiking and rock climbing in my free time
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 4 Sep 2021
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before May 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jul 2021. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
Executive Accountant
10
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Production Engineer
8
salaries
| ₹2.4 L/yr - ₹3.3 L/yr |
Maintenance Engineer
8
salaries
| ₹3.6 L/yr - ₹6.5 L/yr |
Site Incharge
7
salaries
| ₹1.9 L/yr - ₹4.2 L/yr |
Data Entry Operator
7
salaries
| ₹2 L/yr - ₹3.2 L/yr |
Thermax Limited
ABB
Isgec Heavy Engineering
Kirloskar Oil Engines